Construction logbook
Construction unit: (will fill in, right?) Name of the project:
1 construction parts: such as eleven 1 ~ 2 / A ~ G axis column reinforcement
2 materials into the field and sampling
3 whether there is a change in the construction of the construction of the
4 by the Which foreman did what technical briefing
5 laboratory report out or send what to test
6 company what notice or A construction requirements
7 labor arrangements
Log is basically a running account, that is, the site site to do a detailed record of the things that happen to be as good as possible
Like the student Writing a diary, change the terminology to write and can be understood on the line, as if to submit to the quality control Oh
And you have to ask how many copies you want to write, not when enough for you to copy.