The minutes of the meeting should write the spirit of the meeting and the agreed items. Minutes of standing meetings, office meetings and routine work meetings generally include meeting contents, agreed items, and some can also outline the significance of agreed items. Minutes of working meetings, professional meetings and symposiums often include experiences, practices, opinions, measures and requirements for future work. The following is what I brought for you. Please refer to it.

1

At 8:30 on August 9th, 20XX held a regular safety meeting in August in the conference room on the fifth floor of the company's office building. Leaders above the vice president of the company, the safety supervision department, the engineering department, the safety department of the base, the director of the maintenance department and the engineering department specially attended the meeting, and Comrade Yong Jinning, the deputy general manager of the company, presided over the regular safety meeting. At the meeting, Maliantai and Liupanshan bases reported the safety situation in August and the key safety work in September; The safety supervision department commented on the safety situation in August and arranged the key safety work in September; Comrade Yong Jinning, deputy general manager, commented on the safety management in August and emphasized the key safety work in September; Finally, General Manager xu feng made a concluding speech.

The meeting held that the overall safety work of the whole company was in good condition in August. There were no incidents of personnel responsibility in the internal and external engineering management of the company, and a class of obstacles occurred 1 time. The safety management was steadily improved, and the safety awareness of employees was gradually enhanced. Especially the pre-shift meeting is better; Safety standardization and paramilitary work are in place. However, there are still some problems, such as lax site management, the failure to sign the safety contract of the outsourcing team used in external project management, the imagination of starting work with incomplete procedures and the problem of "hosting by contract"; Although the total number of defects in each base has dropped sharply this month, there have been several incidents of load reduction and inadequate device inspection, which have caused device damage, which should be paid great attention to, mainly because the depth of planned maintenance is not enough; And after the shutdown of Liupanshan, the base attached great importance to it, carefully inspected all devices and systems, and there were no unsafe incidents that caused the accident to expand and delayed the start-up. I hope Maliantai base will do a good job in accident prediction and drill in this regard; In August, the key work was to carry out special safety inspection in the company and the project department according to the requirements of the group company's August 16 video conference on the personal death accident of Yinxing Coal Industry and the thermal power division, and found out more than 200 problems, and achieved phased results. In view of the weak links in the found problems, corresponding preventive measures must be taken, and the later work focused on rectification, which is currently being implemented.

A, monthly safety evaluation:

1 Since August, the external engineering projects contracted by the company have started one after another. As of August 3 1 day, although there were no class II obstacles, personal injuries and all kinds of unsafe incidents above, the safety supervision department made random inspections to the project department from time to time, and there were still the following problems: the installation of the maintenance part of the Maliantai wastewater renovation project, the safety officer of the project department lacked the ability to find problems, and the problems existing on site were ignored. Other project department managers are conscientious and responsible, and all work in strict accordance with the safety management requirements for planned maintenance of units. In particular, the daily safety disclosure summary work of Zhongwei Sikouzi and Western Thermal Power Project Department is in place, and the telephone recording of the meeting is transmitted to the company's safety supervision department in time every day. According to the progress of each project, the focus of safety risk prevention is different, and the projects and risk pre-control measures that remind the project department of safety key inspections are improved.

2. On August 18 -22, the Safety Supervision Department was responsible for the company's special safety inspection working group, and carried out joint self-inspection work together with the Engineering Department, the Safety Department of the Base, the Maintenance Department and the Project Department. No major problems were found in the self-inspection stage of this special safety inspection, and the basic management of individual security team was good, such as the ash removal and desulfurization class of Maliantai, the low-voltage class of electric equipment and the low-voltage class of Liupanshan Base. However, there are still many problems, including 94 problems found in Maliantai Base. External Project Department 14; 99 inspection information feedback briefings were held in Liupanshan base, requiring the base and the project department to attach great importance to it, timely implement the responsibilities and rectification time, and immediately arrange rectification. As of August 3rd1day, there are 83 projects in Maliantai Base, and the remaining 1 1 projects will be completed after # 1 unit plans to repair and purchase materials; There are 67 Liupanshan bases, and the remaining 32 problems are being rectified; All the problems of external engineering 14 were rectified. This special safety inspection reflects that the responsibility system of our managers at all levels is not implemented in place, the sense of responsibility is not strong, the basic management work is not taken seriously, the ability to find problems is limited, the idea of being a good man exists, and there is an imagination of reporting good news without reporting worries. At the same time, the implementation is not enough, the work arrangement is not going on, and the rectification work is progressing slowly.

3. On August 3rd, Liupan Mountain #2 unit stopped the high-pressure external cylinder drain pipe orifice flange leakage, and on August 5th, the #2 unit #5 high-conductivity drain pipe to the quick-cooling connection tee was punctured for emergency repair and leakage stoppage, which reflected that our metal supervision work was not in place. The Engineering Department should assist the metal supervisors to improve the device ledger, check the high-pressure welding joints monitored by the unit and the furnace side according to the drawings, and conduct item-by-item investigation to avoid the recurrence of similar incidents caused by missed inspection.

4. The fire of 400VMCC cabinet of Maliantai #2 industrial waste water pump and the burning of stator winding of motor of condensate pump of Liupanshan #2 machine reflect that the overhaul of auxiliary devices of electrical specialty is not carried out seriously, the overhaul depth is not enough, and the daily inspection work is not in place.

5. On August 9, Liupan Mountain # 1 2 units were shut down due to power grid reasons. All staff of Liupan Mountain Base took the overall situation into consideration, carefully investigated the potential safety hazards of the device, and did not expand the accident and breed other device damage incidents, and praised and rewarded them.

Second, the monthly safety management requirements

1, the management personnel can insist on going to the site to confirm and sign the review of the pre-control measures for dangerous points of various professional working tickets, but there are still incomplete measures, and they have not signed the supplementary measures.

2. There are many civilized production of on-site devices, powder accumulation in pipelines and oil leakage points of devices, such as poor sanitation of Liupanshan # 12 furnace devices, and many coal mills, blowers and leakage points. Professionally, the person in charge is urged to carry out rectification according to the division of devices.

3. For long-term outsourcing projects and newly started external projects, the outsourcing team must follow the principle of "who uses and manages", and must sign the Safety Agreement in time and go through the commencement formalities before entering the site for maintenance.

4. From the problems existing in the special safety inspection, it is reflected that the managers of the guarantee system have unclear responsibilities and do not perform their duties in place. The Ansheng Department should conduct regular spot checks and must put forward assessment opinions when problems are found.

Third, the company's deputy general manager Yong Zong stressed:

1, the problems existing in monthly production reflect the downward trend of device management, and the personal aspects of the company have been well controlled through continuous inspection. However, there are still some unsafe incidents in the external engineering. Recently, the surrounding security environment is not good, and there are many problems found in the special safety inspection. Although some achievements have been made, the expected work effect has not been achieved.

2. In the second stage, an in-depth inspection is required. The management of external projects is better than the internal management of the base. In September, the special safety inspection was carried out continuously. In view of the problems and weak links, the rectification was carried out continuously from September 16, and the focus-type rectification was eliminated until the device was put into normal operation, forming a closed-loop management of rectification.

3, although the notice of safety skill appraisal examination has been issued, but the specific implementation plan, training and other specific preparations should come out as soon as possible.

4. Learn the finger dictation theory of Alashan Wind Farm, and make sure whether there are implementation directions and innovative ways.

5, autumn safety inspection work and special safety inspection work cycle, to light form, light report, heavy implementation.

2

20XX August 3 1 day 15:00 Lanzhou Jinchuan Science and Technology Park Co., Ltd. held a regular meeting on production safety in Jinchuan Division in July. The meeting was presided over by Wang Shuliang, deputy general manager of the company. Production department Wang Jinchun, Liu Guanghui, Shan Meng, Zhang Dong, Gu Yonggang, Jason, purchasing department Wu Xingming, comprehensive management department Zhang Hong, finance department Sun Zuogang, human resources department Xing Jinlan, cobalt workshop Zhu Yongze, pilot plant Chen Wenfu, nickel oxide workshop Chen Shouquan, powder workshop Yan Zequan, heating workshop Wang Zhuhua, alloy smelting workshop Zhao Xuguang, silver acid workshop Li Yongzhi, high purity metal.

I. Work Completion in August

1, formulated the "four safety" normative and guiding files, and issued them. Leaders and managers at all levels should follow them carefully, and at the same time print the "Safety Work Log" and fill it out as required;

2. The Guiding Opinions on Establishing a "Five-stage" Step-by-Step Safety Management and Control Mode Leading Archives System has been formulated, and all workshops and departments should carry out relevant work according to the guiding opinions;

3. All workshops continue to actively promote the "Thirteen" key tasks, and the production department has stepped up supervision;

4, according to the group company "specification has been built, under construction project safety protection, color management meeting minutes" spirit, held a special meeting, layout requirements of each workshop to strengthen on-site management, to ensure that the man-machine isolation work continuously and steadily, safety identification, color management according to the specification.

II. Notice of Jinchuan Group Corporation on Evaluating the Implementation of "Five-stage" Step-by-Step Safety Management and Control Mode; In accordance with the spirit of the fileNo. 20XX6 1, the workshop is deployed to meet the inspection and evaluation work:

1, each workshop should attach great importance to this inspection and evaluation work, and leaders should personally organize and arrange relevant self-evaluation and data preparation, and actively cooperate with the inspection and evaluation work.

2, each workshop should communicate with the production department, and actively improve the information;

3. Do a good job in site rectification and cleaning;

4. The production department should communicate with the Anhuan Department in time to ensure the smooth reception and inspection.

three

Time: 20XX. 10.25

Venue: Meeting Room of Project Department

Content: management system compilation learning and training

Participants: all the staff of the project department, the heads of all work areas, technical supervisors, etc.

Speaker: Project Manager, Party Secretary, Ministers of Departments

This study and training was presided over by Yang Licun, secretary of the Party Committee of the project. Yang Shuji pointed out that rules and regulations are the fundamental guarantee to ensure the normal operation of a project, and the important foundation to guide daily work, serious work discipline, and ensure the progress, quality and cost of the project. The employees' understanding of project rules and regulations also reflects their integration with the project to a certain extent. The project department organizes everyone to study the rules and regulations, which is related to the operation and future of the project and to everyone's vital interests. In the process of learning activities, the ministers of various departments gave detailed explanations on all the contents under their respective jurisdiction. Finally, the project manager made a concluding speech, asking all employees to seriously study the management system, strictly abide by the management system, and do their own jobs well with the management system as the criterion.

At this meeting, all the staff fully understood and studied the rules and regulations of the project, and said at the meeting that they would strictly abide by the rules and regulations of the project in their future work and make due contributions to the project construction.