Household piecemeal project contract

With the establishment of people’s legal awareness, contracts appear more and more frequently. It is also an important measure to reduce and prevent disputes. There are different types of contracts, and of course they have different purposes. The following is a sample contract for home sporadic projects that I compiled (selected 6 articles). I hope it will be helpful to everyone. Household Sporadic Project Contract 1

Party A: (contractor)

Party B: (contractor)

After negotiation, Party A and Party B agree on the construction of Yanshan County Xinghua The Electric Power Co., Ltd. has reached the following agreement on the maintenance and construction of sporadic projects:

1. Project Overview

1. Contract scope: various sporadic projects designated by Party A.

2. Contracting method: labor and materials

3. Materials used: Party B selects by itself, but the quality must be guaranteed.

4. Project content:

(1) Disassembly and assembly of air conditioner

(2) Indoor cleaning

(3) Exterior wall waterproofing

 (4) Heating repair

 (5) Garage door repair

 (6) LED light replacement

 (7) Locker Labor costs

2. Obligations of both parties

(1) Party A

1. Make preparations before construction to ensure that Party B can enter the construction site on time.

2. Ensure Party B’s construction water, electricity and other conditions.

3. Assist Party B to maintain order on site and handle various problems in a timely manner.

4. During the construction process, if there are any changes to the construction, Party B should be notified at a reasonable time in advance to make corresponding preparations, and be responsible for checking and supervising the progress and quality of the work at any time.

(2) Party B

1. Party A should be notified before starting construction so that Party A can send personnel for supervision.

2. Party B must clean up and dispose of the garbage generated during the construction in a timely manner to ensure that the construction site is tidy and clean.

3. The person in charge of Party B must ensure the safety of construction workers such as fire prevention, theft prevention, and accident prevention. If relevant damage occurs, Party B shall be solely responsible.

3. Project acceptance

After the construction is completed, Party A will conduct quality acceptance, and Party B shall cooperate.

IV. Project Price and Settlement Method

1. Total Project Quantity: Calculated based on the actual time of project approval.

2. Project pricing: The visa negotiation price shall prevail.

3. Total amount: unit price × total construction quantity (finally settled based on the actual completed work volume).

4. Settlement method: After the project is completed and confirmed by both parties, Party B will issue an invoice based on the actual price, and Party A will transfer the construction payment to the account designated by Party B.

5. Warranty

When quality problems occur, Party B shall perform maintenance obligations promptly, effectively and fully. Party A is not responsible for any expenses such as materials, labor, transportation, food and accommodation, etc. Matters not covered in this contract shall be resolved through negotiation between Party A and Party B.

6. This contract is made in two copies. Party A and Party B each hold one copy. It will take effect after being signed and sealed by Party A and Party B.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month__________year____month____day household sporadic project contract 2

Construction unit (Party A):

Contractor Unit (Party B):

According to the relevant provisions of the "Contract Law of the People's Republic of China" and the "Construction and Decoration Project Contract Regulations", in order to ensure the quality of the project, the rights and interests of both parties during the construction process are clarified. obligations and financial responsibilities, both parties agree to sign this contract after negotiation.

Article 1: Project Overview

1. Project Name:

2. Project Location:

3. Project Scope: < /p>

IV. Contracting method:

V. Project cost: The project cost of this contract is for the people

Article 2: Project duration

Economic After negotiation between the two parties and with reference to the project quota, the project started on May 5, 20xx and was completed on June 20, 20xx.

Article 3: Material Supply

1. Party B shall purchase all construction materials by itself. However, all purchased materials must meet Party A's requirements and reach the quality specified in the budget. They must have factory certificates and must be signed by Party A when entering the site. If there is no certificate of conformity, Party A has the right to refuse to use it. .

2. All materials that should be accompanied by a certificate of compliance must be verified as qualified before they can be used.

Article 4: Project Appropriation and Settlement

1. The settlement of this project shall be handled in the following manner

1. Contract price.

2. After the additional items are appraised by the on-site representatives of both parties, and confirmed by Party A’s representative and person in charge, the additional items will be settled at the price agreed upon by both parties and included in the total project cost. The reduced items will be deducted from the final accounts after accounting. When the change project involves funds, the price settlement shall be agreed upon by both parties.

2. Project Progress Appropriation

1. After the project is accepted and accepted, Party A will pay the project payment in one lump sum.

2. In the final accounts of the project, all funds involved in projects that have not been signed by Party A for acceptance or have failed to pass the acceptance will be deducted in full.

3. When Party B applies for project payment, it must apply in the form of a written report, and payment can only be made after review and approval by relevant personnel of Party A.

Article 5: Construction and design changes

All design changes must be confirmed by Party A and signed by both parties before construction can begin. Without the consent of Party A, the construction unit may make any changes without authorization. For the construction part, Party A will not settle the bill.

Article 6: Completion Acceptance and Warranty

1. Before the completion acceptance of the unit project, Party B shall notify Party A two days in advance for acceptance. If Party A fails to participate as scheduled, it may be extended. If the acceptance is passed, the completion date shall be recognized; if the acceptance is unsatisfactory, Party B shall take remedial measures and select a date for re-acceptance. The completion date shall be based on the time of acceptance.

2. After the project is completed and accepted, the project quality is guaranteed for one year.

Article 7: Economic Responsibility

1. Party B is responsible for safety, quality and other accidents that occur during construction.

2. Party B will be responsible for any losses caused by work stoppage, rework, reverse transportation of materials and machinery during construction.

3. If there is any loss caused by Party A during the construction, both parties shall resolve it reasonably based on the principle of negotiation and cooperation.

Article 8: Supplementary Provisions

1. This contract is made in duplicate.

2. The contract will take effect after being signed and sealed by both parties.

3. For matters not covered in the contract, Party A and Party B may sign a supplementary agreement depending on the circumstances.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day Home Sporadic Project Contract 3

Lessee (hereinafter referred to as Party A): ____________________

< p> Lessor (hereinafter referred to as Party B): ____________________

Party A temporarily rents construction equipment from Party B due to work needs. In order to clarify the rights and obligations of both parties, in accordance with the "People's Republic of China and Civil Code" and relevant laws and regulations, and based on the principles of voluntariness, equality, fairness, good faith and the principles of good faith, this contract is signed by consensus of both parties.

Article 1 Name and model of rental equipment

1. Equipment is rented on a daily basis, calculated as 8 hours per day

(1) Wheeled crane rental: __________________

50t: ____________________ yuan/day (including driver’s fuel fee).

25t: ____________________ yuan/day (including driver’s fuel fee).

20t: ____________________ yuan/day (including driver’s fuel fee).

16t: ____________________ yuan/day (including driver’s fuel fee).

8 t: ____________________ yuan/day (including driver’s fuel fee).

(2) Truck rental: ____________________

Four-axle truck: _______________________________ yuan/day (including driver’s fuel costs)

Two-axle truck: ____________________________ _yuan/day (including driver’s gas fee)

Article 2 Rental time

The signing date of this agreement is _________year________month_______day to_______year _________month________ day.

Article 3 Calculation and payment method of Taiwan shifts

1. Settlement method: ____________________ is calculated on a monthly basis, and the monthly payment is paid in full at the end of each month.

2. Party B will issue a formal invoice while handling the rental fee settlement procedures, and Party A will pay the crane rental fee to Party B in the form of transfer.

3. If Party A needs to work overtime, the overtime time will be calculated separately.

Article 4 Rights and obligations of both parties

1. Party B is responsible for the daily maintenance of the crane.

2. Party B only provides the crane and driver to Party A.

3. Party A is responsible for the safety of the structure and strength of the hoisted equipment.

4. Party A is responsible for the leveling of the site and smooth roads.

5. Party A assists Party B in handling relevant factory procedures.

Article 5 Others

1. In the event of an unexpected situation during the construction process, the site should be retained, responsibilities should be clearly defined, and the responsible person should bear the losses of both parties.

2. In case of any losses caused by force majeure, both parties shall bear their respective responsibilities.

3. This agreement is made in duplicate, with each party holding one copy.

4. This agreement shall take effect from the date of signing.

Matters not covered in this contract shall be subject to the relevant provisions of the "People's Republic of China and the Civil Code" and supplementary provisions shall be made through communication and negotiation between the two parties. The supplementary provisions shall have the same effect as this contract. < /p>

_________year________month________day household sporadic project contract 4

Party A: XX Company

Party B: XX Company

< p> After negotiation between Party A and Party B, the following daily maintenance contract is entered into

1. Party A plans to repair XX at a cost of 5,000 yuan.

2. Party B shall carry out construction upon receiving Party A’s notice and relevant requirements, and shall prepare its own maintenance materials.

3. Party B shall complete the construction tasks on time and with high quality and quantity.

4. Party A may refuse to accept projects that fail to meet quality requirements.

5. Party B must abide by the purpose of operating honestly and being responsible to users, and must ensure qualified quality and reasonable prices for maintenance projects.

6. Party B’s maintenance payment must be accepted and signed by the person in charge of Party A before it can be settled.

7. The settlement time shall be negotiated between Party A and Party B. Party B must provide legal tax invoices, otherwise Party A will refuse to pay.

8. Matters not covered in this contract shall be subject to separate negotiation between Party A and Party B.

9. This contract will come into effect on the date it is signed by representatives of A and B.

10. This contract is made in two copies, with each party holding one copy.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day household sporadic project contract 5

The contract-issuing party (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

Article 1 Project Overview

Party A and B have reached an agreement on the basis of equality and voluntariness for Party B to contract the VIP room contracted by Party A. The production project (hereinafter referred to as the project) has reached the following agreement:

1.1 Project location: ( )

1.2 Production content: ( )

1.3 Project contracting method, both parties It is agreed to adopt the following contracting method ( ).

(1) Party B contracts the work and all materials

(2) Party B contracts the work and some materials, and Party A provides some materials (Party A provides a detailed list of decoration materials, and Party B provides Detailed list of decoration materials);

(3) Party B contracts the work and Party A provides all materials (see the detailed list of decoration materials provided by Party A).

1.4 The project is limited to ( ) days.

Start time ( )

Completion time ( )

1.5 Contract price: The cost of this contract project is (RMB) ( ) yuan, the amount is in capital letters: ( )

Article 2: Work between the two parties

2.1 During the construction period, Party A shall be responsible for providing relevant procedures and conveniences for Party B to enter the site for assembly, debugging, etc.

2.2 Party B shall do its best during the construction process and shall not damage Party A’s other facilities, otherwise Party B shall be responsible for any losses caused thereby.

Article 3 Project Changes

If the project and methods need to be changed, both parties should reach an agreement through consultation, and the representative of Party A and Party B will sign a written change order, and after paying the price difference between the increase or decrease in the project Construction will be carried out again, and relevant project costs and construction periods will be adjusted at the same time. If Party A privately agrees with Party B's workers to change the construction content, Party A will be responsible for all consequences. If any loss is caused to Party B, Party A shall compensate Party B.

Article 4 Safety Production and Fire Prevention

4.1 The construction drawings or practice instructions provided by Party B shall comply with the "Fire Protection Regulations of the People's Republic of China" and relevant fire protection design specifications. Mainly including electrical lines, pipes, tap water and other lines and pipes are smooth and qualified.

4.2 Party B shall strictly abide by the "Technical Specifications for Safety of Construction and Installation Workers" and the "Safety Operating Specifications for Construction and Installation Workers" during the construction period, and pay attention to construction safety.

4.3 Safety or fire accidents occur due to Party B's violation of relevant safety operating procedures, fire protection regulations and other engineering production quality reasons during the production of construction engineering drawings or construction production processes or during the use of Party A. , Party B shall bear all economic losses caused thereby.

Article 5 Method of payment of project price

1. After the contract takes effect, Party A shall pay the project price to Party B according to the following agreement;

(1) In Within 3 days after Party B passes the installation acceptance, Party A will pay the project price to Party B;

(2) Party B promises a one-year warranty period.

Article 6 Supplementary Provisions

6.1 This contract shall take effect after being signed by Party A and Party B.

6.2 The project shall not be subcontracted after this contract is signed.

6.3 If Party A and Party B sign a contract directly, this contract shall be made in two copies, with Party A and Party B each holding one copy.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day Household Sporadic Project Contract 6

Party A: (ID number:)

Party B: (hereinafter referred to as Party B)

Based on the principles of equality, mutual benefit, coordination and cooperation, integrity and friendship, Party A and Party B have reached the following conditions and commitments after discussion and negotiation on the xx project in Kailu County, Tongliao City. Signing this agreement:

1. Party A’s obligations and responsibilities

1. Provide Party B with true information based on a full understanding of the connections and projects of the xx project in Kailu County, Tongliao City , Assist Party B to cooperate and check the signing of the contract for the xx project in Kailu County, Tongliao City.

2. Ensure the authenticity of the project and coordinate the signing of the project construction contract between the owner and Party B.

2. Party B’s obligations and responsibilities

1. Party B actively cooperates with Party A to track the owner’s progress on this project.

2. In line with Party A’s trust and confidence in understanding the contract award of the xx project and obtaining the construction contracting rights, we are responsible for providing Party A with true and effective information, funds during construction, construction strength, labor remuneration and payment Way. Party A is designated as the sole person in charge of coordination, and a third party (referring to another contact person) cannot be designated as the person in charge of coordination.

3. Remuneration payment

1. After Party A helps Party B obtain the construction contracting right of this xx project, Party B shall pay Party A 6% of the total labor remuneration fee.

2. Within three days after the signing of the construction contract for this project, Party A’s remuneration will be paid to Party A in one lump sum by Party B.

IV. Liability for breach of contract

(1) Liability for breach of contract by Party A

1. After the signing of this contract, Party A shall not, unless Party B breaches the contract. This project) (hereinafter referred to as Party A

will not accept any third-party services (contractors).

2. After the signing of this agreement, if Party A provides additional The construction team shall pay Party B a liquidated damages of 50,000 yuan as a breach of contract.

3. If Party B refuses to cooperate with Party A's work, Party A has the right to seek other collaborators.

(2) Party B’s liability for breach of contract

1. After the signing of this contract, if Party B bypasses Party A and completes the transaction with the intermediary (including directly or indirectly), Party A will be deemed to have completed the work, and Party B shall pay Party A As for the labor remuneration stipulated in paragraph 1 of Article 3 of this contract, Party A has the right to recover the labor remuneration indefinitely and the right to file a lawsuit in court.

2 . After signing this agreement, if Party B contacts a third party (another contact person) regarding this project, Party B will be deemed to have breached the contract and compensate Party A for liquidated damages of 500,000 yuan.

5. Confidentiality

In this service project, Party A and Party B have a permanent obligation to keep confidential any business secrets and personal privacy that they know of the other party, and shall not disclose or use them without permission.

This contract is made in triplicate. Party A and Party B and the witnesses each hold one copy.

If Party A has no objection to the agreement and contract, it will take effect on the day of signature.

Party A:

< p> Witness:

Party B:

1. Project Overview

Project Name:

Private residence.

Project location:

Cooperative, in Party A’s original residential courtyard.

Project content: all construction projects within the design drawings.

Building area: ***148, 8 square meters.

2. Project Contracting Scope Contracting scope: Contracting work but not materials.

3. The start date of the contract period: xx, month xx, year (the first day of xx in the lunar calendar). Completion date: xx, xx (the sixth day of xx in the lunar calendar). The total contract duration is 102 calendar days.

IV. The contract price is RMB 180 per square meter, the total construction area is 148.8 square meters, and the total contract price is RMB 26,780. Payment method: Party A shall pay the total contract price in four installments.

For the first time, after the completion of the basic project, Party A will pay Party B 30% of the total contract price, which is 8,000 yuan;

For the second time, after the completion of the main project, Party A will pay Party B 30% of the total contract price, which is 8,000 yuan; Party A pays Party B 30% of the total contract price, which is 8,000 yuan;

For the third time, after the project is fully completed, Party A pays Party B 30% of the total contract price, which is 8,000 yuan; The remaining 10% (i.e. 2,780 yuan) is used as a quality deposit. Party A will pay all of it to Party B if there are no major quality problems xxxx years after the project is completed.

5. Quality standards Project quality standards: Construction according to drawings to ensure project quality.

6. Rights and Obligations of Party A and Party B

1. Rights and Obligations of Party A:

(1) Party A shall provide Party B with "three links" One level".

(2) Payment on schedule.

(3) Provide Party B with all required materials in a timely manner.

(4) Provide Party B with 2 sets of design drawings before the start of the project.

(5) During the construction process, if quality problems are found or design drawings are changed privately, Party A has the right to require Party B to rework.

2. Party B’s rights and obligations:

(1) Construction according to the drawings. If changes need to be made to the original design during the construction process, modifications can only be made with Party A's consent.

(2) Ensure project quality.

(3) Guarantee the construction period and deliver the work on time.

(4) Party B should inform Party A 2-3 days in advance of what materials are needed during the construction process so that they can be purchased in time. Party B shall adhere to the principle of economy and shall not waste materials.

(5) After each sub-project is completed, Party B shall obtain Party A’s acceptance before proceeding to the next process.

(6) Party B should attach great importance to production safety, and all safety responsibilities shall be borne by Party B itself.

7. Matters not covered in this contract shall be resolved through negotiation between Party A and Party B.

8. This contract shall take effect from the date of signature by Party A and Party B.

9. This contract is made in duplicate, with Party A and Party B each holding one copy.

Party A:

Party B: Legal representative

Contract issuing party (Party A):

Contractor (Party B): < /p>

In accordance with the "Contract Law of the People's Republic of China" and the "Regulations on the Management of Building Decoration and Repairs" of the Ministry of Construction and combined with the specific conditions of this project, the two parties have reached the following agreement

Article 1 Project Overview

1. Project Name

2. Project Location

3. Construction Period and Working Days

This project will start from x month x year Construction started on x day and was completed on x day, x month x year p> 2. Shoe cabinet

 3. Kitchen partition

 4. Kitchen cabinet door, one suspended ceiling

 5. Kitchen and bathroom PVC buckle ceiling

6. TV cabinet, TV background wall

7. Partial ceiling in the living room and dining room

8. Pink powder and wall paint throughout the house

Note: The materials used are: ① Sandwich board is Tysen Yuanfu E1 grade

② Nine-centimeter board (Tesen Yuanfu E1 grade)

③Gypsum board (Taishan five-star)

④Paint (Hongchang Brand)

⑤Wall paint (Hongchang Brand Big Barrel)

Article 3 Regarding the Construction Time Agreement

1. Due to Party A’s reasons, the Completing the work as agreed will affect the construction period: the construction period will be postponed.

2. Due to Party B’s failure to complete the construction as agreed, compensation will be calculated based on the delayed construction period of 50/day.

3. Due to construction changes, power outages and force majeure factors, the total stoppage of 8 hours has been postponed accordingly by one day.

Article 4 Payment Methods and Calculations

1. Party B pays xxxx yuan when entering the site for woodworking materials.

2. Party B requires half of the progress of the carpentry project to be paid.

3. Party B completes the carpentry and pays for the paint at the site.

4. Shuangfei fans pay xxxx yuan to enter the venue.

5. Party A shall pay the total amount and balance to Party B within three working days after completion acceptance

Article 5 Liability for breach of contract

1. Contract If any party terminates the contract after it takes effect, it should promptly notify the other party to handle the contract termination agreement and pay the other party 10% of the total project budget price as liquidated damages.

Other clauses in Article 6

1. If Party A needs to modify the plan and add items during the construction of the project, it must contact Party B three days in advance or before the project materials are cut. After both parties agree, Party B shall arrange the construction and the additional amount shall be paid before painting.

2. After the project contract comes into effect, neither Party A nor Party B shall reduce the contract decoration projects for any reason. In special circumstances, both parties must agree. The breaching party shall bear 300 yuan for the changed item as loss compensation to the other party.

3. Three days before the completion acceptance of this project, Party B will know that Party A will receive it on time, and no excuses for delay will be allowed. Because the acceptance cannot be made on time and exceeds the agreed time, the project will be deemed qualified and will no longer be accepted by both parties.

4. This contract is in duplicate and has the same validity as the original contract and will take effect from the date of signature by both parties.

Party A’s signature:

Telephone number:

x year x month x day

Party B’s signature:

Telephone:

x, x, month, x, year