When will Tianxianhu Bridge in Wanzhou District be built?
Tianxianhu Bridge in Wanzhou District was opened in June 165438+ 10/7. According to relevant data, the North Bridge Head of Tianxianhu Bridge is connected with the planned Binhu Road on the Hubei side of Tianxianhu, and its south side is connected with the east side of Binhu Tiandi in the elevated section of Beibin Avenue. The length of the bridge is about 290 meters, and the width of the bridge is composed of 27 meters =6 meters of sidewalks. The 15 carriageway is 6 meters of sidewalks, and the bridgehead intersection is a through arch bridge.