It was decided to close Liuting Airport, because the new Jiaozhou Airport with two runways can support the long-term passenger and cargo throughput until 2050.
In 20 19, the passenger throughput of Qingdao Liuting International Airport was 25.556 million, up 4.2% year-on-year. The cargo and mail throughput was 256,000 tons, a year-on-year increase of14.2%; Take-off and landing sorties1860,000, up 2. 1% year-on-year.
The Air Traffic Management Bureau of the Civil Aviation Administration of China issued a notice that Qingdao Jiaodong International Airport (hereinafter referred to as Jiaodong Airport) fully met the transition operation conditions, and the transition operation was officially implemented at 0: 00 on August 1 day, and Qingdao Liuting International Airport was closed simultaneously.
New airport construction planning:
20 15 the national development and reform commission approved the feasibility study report of Qingdao new airport project and agreed to build Qingdao new airport. Qingdao New Airport, named Qingdao Jiaodong International Airport, is located in the northeast of Qingdao jiaozhou city center, about 39 kilometers away from Qingdao center. The flight area of the new airport is 4F, the main runway is 3,600 meters long and the auxiliary runway is 3,200 meters long.
Two independent parallel long-distance runways will be built, with a distance of 2,200m and a terminal area of 450,000m2. Two short-distance runways will be built in the long term, with a terminal area of 600,000 square meters.
The recently planned land area of the new airport is 65,438+0,563 hectares. In 2025, the passenger throughput will be 35 million passengers, the cargo and mail throughput will be 500,000 tons, and the aircraft will take off and land 298,000 times. In the future, in 2045, the passenger throughput will be 55 million passengers, the cargo and mail throughput will be 6,543,800 tons, and the aircraft will take off and land 452,000 times.
Reference to the above content: Baidu Encyclopedia-Qingdao Liuting Airport
What will Liuting Airport do in the future?
According to the current plan, after the handover of the airport, the airport terminal will be retained as a whole, urban renewal will be implemented, functions will be enriched, and modern service industries such as finance, commerce and exhibitions will be developed.
After the relocation of the airport, the clearance restrictions around the airport will be lifted. According to the overall urban planning of Qingdao and the new round of land space planning to be prepared soon, the development intensity can be increased, the level of land conservation and intensive use can be improved, and some high-rise buildings can be built according to the needs of the project.
Qingdao Liuting International Airport (IATA:TAO, ICAO:ZSQD) is located in Liuting Street, Chengyang District, Qingdao City, Shandong Province, China, about 23 kilometers away from the center of Qingdao. It is a 4E-class civil international airport and one of China 12 trunk airports.
Will Qingdao Liuting Airport be transferred to military service after it is closed?
Because the new airport is opened, it is not necessary to open the old airport at the same time.
Is Laoliuting Airport sealed for standby or handed over for development?
Wu Yousheng: According to the master plan of the new airport construction, Liuting Airport will be closed after the new airport is opened, and its final use will be decided by the superior.
What will happen to the old airport after the new airport is opened?
Will it remain as a freight airport?
Wu Yousheng: The use and related planning of Liuting Airport after its opening are still under study and preparation. The specific functions have not been determined, but it will not be used as a special cargo airport.
When will the new airport be officially opened?
Wu Yousheng: According to our work plan, the new airport will be put into operation in the first half of 20 19.
Is the transition of 20 19 a mandatory time node?
Is it possible to make a partial transition?
Wu Yousheng: According to the five-year plan, 20 19 is the transition year of acceptance, which is our established goal and also a "military order". Judging from our current project plan and construction progress, we will realize the "overnight transition" in 20 19.
Cooperate with the new airport after completion
Can high-speed rail, subway and airport express be opened at the same time?
Wu Yousheng: According to the comprehensive transportation planning of the airport periphery, the high-speed railway (including Qing Ji high-speed railway and Qinglian railway) will be completed and opened to traffic at the end of 20 18; Metro Line 8 is scheduled to be completed and opened to traffic in 20021year; The airport expressway will be completed and put into use simultaneously with the airport in 20 19.
Qingdao Liuting Airport is about to close, and Huang Bo sent a farewell message. What information is worth paying attention to?
Qingdao Liuting Airport is about to close, and Huang Bo sent a farewell message. What information is worth paying attention to?
1. Qingdao Liuting Airport will be closed. What happened when Huang Bo sent a farewell message?
The local airport in Qingdao, Shandong Province is called Qingdao Liuting Airport. This airport carries many memories of Qingdao locals, and it is a famous international airport in China. After years of operation, it has been difficult to meet everyone's travel and transportation needs. Therefore, Qingdao Liuting International Airport has built Jiaodong International Airport. Therefore, Qingdao Liuting International Airport will face the situation of official closure. And on August 12, the entire Qingdao Liuting Airport will be closed. Actor Bo Huang also posted an article on his social platform to bid farewell to Qingdao Liuting Airport.
2. What is the purpose of airport closure?
Qingdao Liuting Airport has been built for a long time, so with the development of society and the constant changes of people's needs, Qingdao Liuting Airport has gradually begun to have some shortage of capacity, which is difficult to meet everyone's needs. So at this time, a more modern airport with a larger throughput is needed, so an international airport is built locally. In addition, the new Qingdao Jiaodong International Airport is built as a relatively large national transportation hub, which can combine various modes of transportation and is more conducive to everyone's travel and cargo transportation. Therefore, the closure of Qingdao Liuting Airport is actually a new beginning, which means that Qingdao locals will have a more convenient way to travel.
Third, how to evaluate this matter?
For Qingdao locals, Liuting Airport is even more reluctant to give up, but in order to meet the needs of social development, we must constantly bring forth the old and bring forth the new, so that new things have more room for development, so that our life will become more convenient. This is a good thing and an important measure to benefit the country and the people, so the local people are very supportive of the construction and use of the new airport. If the old things are not eliminated, there will be no way for the new things to develop better, so everyone should look at this matter objectively. I believe that Qingdao Jiaodong International Airport will bring more convenience to Qingdao locals and more development opportunities to the city.
After the completion of Qingdao New Airport, why did Liuting Airport close? ,,
It has been decided to close Liuting Airport because the new Jiaozhou Airport with two runways can support the long-term passenger and cargo throughput until 2050.
One theory is that the airport is returned to the navy, and there is a naval aviation school in the south of the airport, and the terminal building is used for the development of Chengyang District. Another way of saying it is that the runway apron is used for real estate development, and the terminal building is the international convention and exhibition center in Chengyang District.
Moreover, the situation in Qingdao airspace is not enough to support the operation of dual airports. The linear distance between the two airports in Qingdao is 2 1km. If two airports operate, the plane taking off from Liuting Airport can only turn right instead of left, while the newly-built Jiaodong Airport can only turn left, otherwise there will be cross-conflicts.
Transport transfer:
1, high-speed railway
Qing Ji High-speed Railway passes through Qingdao Jiaodong International Airport Terminal and has Qingdao Airport Station. There are EMU trains passing by Qingdao West Railway Station, Hongdao Station, Qingdao North Railway Station and Qingdao Station.
2. Urban Railway
Qingdao Metro Line 8 passes through Qingdao Jiaodong International Airport Terminal and sets up Jiaodong Airport Station. After the opening of Qingdao Jiaodong International Airport, the subway station will be opened simultaneously.
What will Qingdao Liuting Airport do in the future?
After the handover of the airport, infrastructure such as the terminal building of Liuting Airport will remain. As a branch airport of Qingdao, Liuting Airport will retain some domestic routes and increase freight routes. Liuting Airport is included in the development plan of northern Qingdao, and its surrounding area will become an important development area of Chengyang District.
What will Qingdao Liuting Airport do in the future?
Qingdao Liuting International Airport is a 4E-class civil international airport, and its address is located at Liuting Street, Chengyang District, Qingdao City, Shandong Province, China.
Qingdao Liuting International Airport opened online check-in service in June 2008, which is the first airport in China to open general online check-in service.
Qingdao Jiaodong International Airport, as the first 4F-class international airport in Shandong Province, is fully equipped with transfer operation conditions. It was officially put into operation at 0: 00 on August 20021year, and Qingdao Liuting International Airport was closed simultaneously.