You don't need a renovation contract to get a loan with real estate license. Thanks for adoption
Second, how to write the loan renovation contract?
House renovation contract (special loan) Party A (entrusting party): Party B (construction party): According to the relevant national laws and regulations, combined with the specific conditions of this project, Party A and Party B have reached the following agreement on the basis of equality, voluntariness and consensus, and both parties shall abide by it. I. Overview of the project: 1. Decoration construction site: 2. The building area is square meters. 3. Project content: interior decoration, furniture, household appliances, etc. 4. Entrusting method: turnkey project of contracting and materials. 5. Duration: The date when Party B receives the project payment is regarded as the commencement date, and the total duration is 120 days. Two. Project price and settlement method: 1. Total price: (¥:). If both parties agree to change the construction content, the project payment for the changed part shall be calculated separately. 2. Payment method: (1) After the contract is signed, the project payment shall be paid in one lump sum within fifteen days. (2) After the acceptance of the project, the balance of the project shall be settled within fifteen days. (3) Party B's bank account number, account name and bank. Three. Construction preparation and obligations of both parties (I) Work of Party A 1. Party A shall provide the floor plan of the house and the water, electricity and gas circuit diagram, and make on-site disclosure to Party B. 2. Party B is appointed as the representative of Party A, responsible for the performance of the contract, supervision and acceptance of the quality and progress of the project, and handling changes, visas, payment of project funds and other related matters. (2) Party B's work is 1, and the project manager is appointed as Party B's representative to be responsible for the performance of the contract. Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and solve all matters that Party B is responsible for. 2. In the process of construction, Party B shall abide by the construction safety operation rules to ensure the safety of workers, surrounding houses and property and nearby residents. In the event of a safety accident, Party B shall bear the economic losses caused thereby. Four. Material supply The materials approved in the project budget signed by Party A and Party B shall be purchased by Party B according to the contract, and their quality must meet the national standards. Do not meet the quality requirements or different specifications, it is forbidden to use. If it has been used, Party B shall be responsible for the losses caused to the project. V. Project quality and completion acceptance measures 1. This project carries out quality evaluation and acceptance according to the construction drawings, practice instructions, design changes and the Quality Code for Home Decoration Engineering. 2. After the decoration project is completed, the project quality and environmental protection requirements shall meet the relevant national standards. The intransitive verb liability for breach of contract 1. If the project is delayed or stopped halfway due to Party A's reasons, Party A shall compensate Party B for the losses caused thereby. Party A shall pay RMB to Party B for each day of shutdown; 2. If the completion is overdue due to Party B's reasons, Party B shall pay RMB to Party A as liquidated damages for each day overdue. Seven. Engineering warranty: 1. The warranty period of residential interior decoration works is two years. The leakage prevention of kitchens, bathrooms and external walls with waterproof requirements is five years. The warranty period is calculated from the date of completion and acceptance of the decoration project. 2. The damage caused by Party A's improper or abnormal use is not covered by the warranty. Eight, deal with the decoration project, by both parties through consultation or mediation. If negotiation or mediation fails, the parties can choose the following options: (1) submit to the Arbitration Commission for arbitration; (2) to the people according to law. Nine. This contract is made in duplicate, with the same legal effect. Construction drawings, project budget and other contract attachments are an integral part of this contract. Party A (Seal): Party B (Seal): Representative (Signature): Authorized Agent: Year Month Day.
3.202 1 What are the requirements for applying for a decoration loan?
Conditions:
1. The house has been delivered, and the property provides a delivery note.
2. renovation contract has signed with the decoration company.
3. Personal credit information is good
4. Did you apply for a decoration loan without renovation contract?
Without renovation contract's application for renovation loan, it would be too late to sign renovation contract.