charging standards
1. When only the preliminary design or construction drawing design is entrusted, the charge shall be calculated by dividing the design workload by the proportion of the industry and multiplying it by the coefficient 1. 1. If the construction drawing budget is increased, the fee shall be calculated by multiplying the engineering design fee standard by the coefficient 1. 1.
2. Engineering design adopts standard design (except standard drawings) and reuse design, and similar new design projects are charged at 20%.
3. Engineering technical consulting services, technical services such as participation in planning and investigation, inquiry, quotation and foreign negotiation, and work without specific charging standards can be charged according to the number of days of employees of direct producers, and the charging standard is 85 yuan per working day. The calculation of working days can be based on the work task, based on the working day quota, or determined by the designer and the client through consultation when signing the contract. For tasks that need to travel to other places with a construction period of less than 60 days, the travel expenses shall be borne by the entrusting unit. When an engineering design unit needs to go abroad due to the tasks it undertakes, except for the manufacturing and installation expenses paid by the design unit, other expenses for going abroad (including foreign exchange quota) shall be paid by the entrusting unit.