Britfang Cloud Migration Solution provides 6 phases including assessment and analysis, solution design, environment preparation, migration implementation, testing and validation, and system cutover, 14 processes, and 3 migration tools including i2Move.
Assessment and Analysis:
Determine the scope and objectives of the migration, combined with the system requirements research form, covering the business system information (business name, business system, business classification, usage status, docking system, etc.), the host information (deployment architecture, IP address, internal and external network access, system importance, allowable downtime), and the optimal migration operation recommendation time, intermediate and intermediate migration tools, including i2Move. and recommended time for optimal migration operations, middleware, etc.) operating system information (CPU, memory, disk capacity, OS version, etc.) database information (data name, database type, version, high availability, data volume, backup strategy, etc.);
Program design:
Based on the analytical report of the assessment, the design of the migration implementation plan, covering the classification of migration scenarios, special migration scenarios, migration programs, implementation steps, foreseen migration challenges and risks, response plans, and provide pre-migration division of labor schedule for customers and partners, as well as training plans, etc.
Environmental Preparation:
Preparation of basic resources for the migration target, including the computing, storage, network, database environment, new accounts, passwords, to-be-migrated system administrator privilege settings, the corresponding table of the move-out and migration resources, as well as the migration software client installation;
Migration implementation:
System migration information configuration, database migration, server migration, server cluster migration, start migration tasks and progress observation;
Test verification:
Verification of system stability, data consistency, and integrity after migration;
System cutover:
Establishment of cutover schedule, determination of cutover time window for each business system, business verification, and Determine whether to proceed with the implementation of the fallback program;