Contract number:
Construction project construction contract
Project name:
Contractor:
Contractor :
Contract signed: Year and month
Part I Agreement
Contractor (full name):
Contractor (full name):
In accordance with the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and other relevant laws and administrative regulations, we adhere to the principles of equality, voluntariness, fairness and good faith. , both parties reached consensus on the construction items of this construction project and entered into this contract.
1. Project Overview
Project Name:
Project Location:
Project Content:
2. Project contracting scope
(See budget for details)
3. Contract duration: days
4. Quality standards
Project quality standards: The pass rate is 100%, and the excellent and good rate is over 80%
5. Contract price
Amount (uppercase):
(lowercase): Yuan
< p>VI. Documents constituting the contractThe documents constituting this contract include:
1. Project quotation or budget
Negotiations between the two parties regarding the project, Written agreements or documents such as changes shall be deemed an integral part of this contract.
7. The contractor promises to the contractor to carry out construction and completion in accordance with the contract and bear the responsibility for project quality warranty (not man-made damage) during the quality warranty period.
8. The developer promises to the contractor to pay the contract price and other payable payments in accordance with the time limit and method stipulated in the contract.
9. The contract takes effect
Place of conclusion of the contract:
This contract shall take effect upon signature by both parties
Part 2 General Terms
p>
1. Completion of the project
1.1 The contractor must complete the project in accordance with the completion date stipulated in the agreement or the extension agreed by the engineer.
1.2 If the contractor is unable to complete the project on the completion date specified in the agreement or the extended period agreed by the engineer due to the contractor's reasons, the contractor shall bear liability for breach of contract.
1.3 If the contractor needs to complete the project ahead of schedule during construction, both parties should sign an ahead-of-date completion agreement as part of the contract document after reaching consensus. The agreement on early completion should include the measures taken by the contractor to ensure the quality and safety of the project, the conditions provided by the employer for early completion, and the additional contract price required for early completion.
2. Project quality
The project quality should meet the quality standards stipulated in the agreement, and the assessment of quality standards is based on national or industry quality inspection and assessment standards.
3. Payment of project money (progress money)
The contractor failed to pay the project money (progress money) as stipulated in the contract, and the two parties did not reach an agreement on deferred payment, resulting in the inability to proceed with the construction. The contractor may stop construction, and the contractor shall be liable for breach of contract.
4. Completion settlement
If the contractor does not pay the project completion settlement price within 3 days after receiving the completion settlement report, the contractor will pay the bank loan interest rate for the same period in arrears from the 29th day Interest on the project price and liability for breach of contract, and the project will not be guaranteed.
(Other clauses are omitted, they are the same as the general clauses in the model text of the national construction project construction contract)
Part Three Special Clauses
1. General rights and obligations of both parties
1. Engineer
Engineer assigned by the contractor
Name: Position:
Authority: Plenipotentiary representative of the construction site
2. Project Manager
Name: Position:
3. Work of the Contractor
3.1 The Contractor shall complete the following work according to the agreed time and requirements :
(1) The construction site must meet the requirements for construction conditions and the time for completion: 3 days before the start of construction
(2) Connect the water, electricity, and telecommunications lines required for construction to The time, location and supply requirements of the construction site: the contractor shall resolve it himself
(3) The time and requirements for the opening of the construction site and public roads: Already available
(4) Time for providing engineering geology and underground pipeline data:
(5) Name and completion time of certificates, approval documents required for construction handled by the contractor:
Assist the contractor to handle
p>(6) Requirements for verification of leveling points and coordinate control points:
(7) Time for joint review of drawings and design submission: 5 days before the start of construction
(8) Coordinate the protection of underground pipelines around the construction site and adjacent buildings, structures (including cultural relics protected buildings), and ancient and famous trees:
(9) The employer provides the contractor with the date and number of sets of drawings: sets
(10) Other work that the contract developer should do as agreed by both parties:
3.2 Work entrusted by the contractor to the contractor:
4. Contractor’s work< /p>
4.1 The contractor shall complete the following work according to the agreed time and requirements:
(1) Submission time of design documents that need to be completed by the contractor permitted by the business scope:
< p>(2) The name and completion time of the plan and report should be provided: as required by the contractor(3) Responsibilities and requirements for construction safety and security and non-night construction lighting: the contractor is responsible
p>(4) Requirements for office and living buildings and facilities provided to the contractor:
(5) Special requirements and cost responsibilities for the protection of completed project products: The contractor shall do a good job Finished product protection work before the project is delivered
(6) Protection requirements and cost responsibilities for underground pipelines around the construction site and adjacent buildings, structures (including cultural relics protected buildings), ancient and famous trees: Contractor Relevant protection work should be done
(7) Requirements for construction site cleanliness: The construction site should be clean and sanitary
(8) Other tasks that the contractor should do as agreed by both parties:
2. Construction organization design and construction period
5. Progress plan
5.1 Time for the contractor to provide construction organization design (construction plan) and progress plan: Completed
p>Time confirmed by the engineer:
5.2 Requirements related to schedule in group projects:
6. Construction period delay
6.1 Both parties agreed to postpone the construction period Other circumstances: The extension of the construction period must be approved by the contractor's engineer
3. Quality and acceptance
7. Concealed projects and intermediate acceptance
7.1 Both parties agree on intermediate acceptance Location: According to the general terms
IV. Safe construction
Before construction, the contractor must sign a safety agreement with the construction unit before starting work.
V. Contract price and payment
9. Project advance payment
10. Project quantity confirmation
11. Project payment (progress payment)
Both parties The agreed method and time for payment of project funds (progress payments):
After the completion and acceptance of the project, the final payment will be paid in one go
6. Supply of materials and equipment,
The contractor purchases the materials himself and is responsible for the quality.
7. Engineering Changes
Party B is not allowed to make design changes without authorization. Design changes must be signed and approved by Party A’s design department and the contractor.
8 , Completion acceptance and settlement
Completion settlement: handled within 3 days after completion
9. Breach of contract, claims and disputes
12. Breach of contract
12.1 The specific responsibilities of the developer for breach of contract in this contract are as follows:
The developer shall bear the liability for breach of contract:
Be responsible for the corresponding losses caused to the contractor
p>Other responsibilities for breach of contract by the contractor as agreed upon by both parties:
12.2 The specific responsibilities for the contractor’s breach of contract in this contract are as follows:
Be responsible for any resulting liability to the contractor Loss
37. Dispute
37.1 Both parties agree that when a dispute arises during the performance of the contract:
(1) File a lawsuit with Anshan People's Court.
10. Others
38. Project subcontracting
38.1 The project developer agrees to the projects subcontracted by the contractor: None
46. ??Number of contracts: 2
Contractor: Contractor:
Project manager: Authorized agent:
Project manager: Project manager:
Tel: Phone:
Account number: Account number: