Matters needing attention in closing existing houses
1. As for the closing time, the general developer will inform in advance, and it is best not to go on the first day and the second day. Although we are anxious to close the house, everyone is in this state of mind. So at this time, there are many people closing houses, and the house inspector may ignore some problems if he doesn't have time to accompany you to look carefully. So the best closing time can wait for three or four days, so there will be enough time to look carefully.
2. Go to the property management department to check the information when you go. Generally, there are residential quality guarantee, residential instruction manual, completion acceptance record, pipeline distribution completion drawing (water, strong electricity, weak electricity, structure) and area measurement table. The first four can be taken away. It should be pointed out that residential quality assurance and residential instructions are among them.
3. Pay attention to check the housing area, contract and overpayment and underpayment. First of all, it is necessary to confirm whether the contract is consistent with the actual situation, whether the structure is consistent with the original design, whether the housing area has been measured by a special department, and whether there is an error with the contract, and the error cannot exceed 5%.
4. Pay attention to the payment. It is right to pay after the house is collected. Some properties may be urged to pay property fees, but according to the regulations, developers cannot take property fees as a condition for repossession. Therefore, they should refuse all fees before closing the house to avoid problems when closing the house, but they can't solve them well.
5. When collecting keys, make sure they are complete, including building keys, access control keys, mailbox keys, water meter keys, electricity meter keys and other necessary keys.