Construction commitment letter
In today's social life, we all have direct or indirect contact with the commitment letter, which is more binding than verbal commitment. Do you know the format of the letter of commitment? The following are 7 construction commitments I have compiled for you. Welcome to read and collect them.

Letter of Commitment on Construction 1 Our company needs to dig roads. In order to ensure civilized construction of urban road excavation and smooth traffic, our company solemnly promises to reduce the negative impact on the city appearance and traffic during the construction period in strict accordance with the requirements of relevant laws and regulations. My unit promises to implement in accordance with the following regulations and requirements:

First, before construction, we must find out the underground pipelines in the construction area, contact the relevant pipeline units, and take effective measures to protect the underground pipeline network.

Two, in a prominent position on the construction site, hanging "urban road excavation permit". If it is necessary to temporarily pile up materials due to operation needs, at the same time, apply for temporary occupation permit procedures, and pile them up only after permission, and it is forbidden to directly mix cement on the road.

Three, in strict accordance with the approved time limit, area and construction plan for construction, rational allocation of human machinery, to avoid the construction in the rush hour.

Four, in accordance with the relevant provisions of the civilized construction, the scope of construction to take enclosure operation, construction materials, machines and tools shall not exceed.

Scope of construction enclosure.

Five, the construction site set up obvious traffic signs, marking, set up warning lamps at night. For the engineering construction that has a great impact on vehicles and pedestrians, traffic diversion measures should be taken, and special personnel should be assigned to assist the public security traffic management department to divert traffic to ensure road traffic and pedestrian safety.

Six, large machinery construction work should be arranged in the evening before 10, and take effective measures to prevent construction noise and dust.

Seven, the construction of sludge, waste, etc. should be removed in time, the construction of mud water, should be discharged into the municipal sewage pipe after precipitation treatment, shall not be directly discharged to the road.

Eight, in strict accordance with the road repair standards of Lucheng District Urban-Management and Law Enforcement Bureau, timely repair the excavated pavement. When excavating concrete pavement, the whole area needs to be repaired. When excavating pavements made of other materials, it should be repaired according to the actual excavated area. The road quality warranty system is implemented, and the warranty period is one year. If there is any problem during the warranty period, it will be rectified as soon as possible, and the repair and rectification will be taken as an important reference for the next permit application.

Nine, any form of disputes and damages during the excavation, the construction unit shall bear and coordinate to solve. If there is any violation of the above contents, in addition to rapid correction, administrative penalties shall be imposed according to law. Violation of the first and eighth, depending on the situation to suspend the construction unit in the future excavation application.

Employer (Seal): Person in Charge: Contact Person: Year Month Day.

(This letter of commitment will be issued when receiving the application form and sent to the examination and approval window when submitting the application form.)

Letter of Commitment for Construction Part 2 The author contracts the air conditioning repair project of Zhanjiang Tongshi Enterprise Co., Ltd. (hereinafter referred to as Party A), and is willing to abide by the following operation safety regulations of Party A and take full responsibility for it, and hereby signs this letter of commitment.

I. Powers and responsibilities:

1. The author promises to buy personal accident insurance for the construction personnel, and shall be fully liable for the occupational accident compensation for the work accident casualties of the employees he employs.

2. The Bookmaker promises to implement all work safety specifications and observe automatic inspection. If negligence causes staff casualties or any other disasters, he is willing to bear all responsibilities, which has nothing to do with Party A.. If Party A suffers various losses, it shall be liable for compensation. And in case of safety accident, Party A is willing to accept a fine of 20xx—5000 yuan.

3. The Bookmaker promises that if the construction personnel have an accident, the Bookmaker will send personnel to the hospital for treatment. If the injured person is not escorted, Party A shall assist in handling it, and the relevant expenses shall still be borne by the Bookmaker.

4. Founder

Commitment to full-time or designated safety management personnel to cooperate with the following matters:

4. 1 Before entering the factory for construction, according to the relevant matters of the engineering safety meeting, it is necessary to conduct safety training and publicity for the construction personnel;

4.2 Before construction every day during the project: hold an early meeting for the construction personnel to publicize the construction safety specifications of that day;

4.3 During daily construction: we should patrol the construction area frequently and cooperate with Party A to improve the problems in time;

5. The author promises to abide by Party A's Safety Management Regulations for Outsourcing Construction, Factory Management Regulations, Construction Safety Commitment and other related safety matters; In case of non-compliance and potential safety defects detected by Party A, Party A has the right to order improvement in place and impose a fine of more than 1000 yuan (inclusive), and the fine shall be borne by the company where the publisher works.

6. The publisher promises to set up a reasonable construction safety passage at the construction site, and put up safety construction signs and safety construction propaganda slogans. There are obvious warning signs in the construction area, and protective isolation measures are set up. The edges and pits of dangerous parts shall be protected by fences and sealed, and safety warning lights shall be added when necessary. Protective articles used by construction personnel are effective and complete, and they are worn according to the specifications.

7. The book maker promises to remove the garbage caused by the construction in time to ensure the cleanliness of the site.

Second, the safety management personnel qualification and certificate management

1. For the project submitted for construction, there are full-time safety management personnel with market-recognized safety qualification certificates.

2. For non-construction projects (sporadic maintenance projects, etc.), designated safety management personnel.

3. The special operations personnel (such as welding, cutting operations, electrician operations, etc.), with the real safety supervision, quality supervision and other departments,

Valid special operation data certificate.

Third, the construction personnel management:

1. Construction personnel shall wear certificates according to Party A's factory entry regulations.

2. The construction personnel shall be adults (at least 18 years old), healthy, climbers and free from acrophobia.

3. The construction personnel shall abide by the basic specifications of Party A's factory, such as no slippers, no sidewalks, no smoking in the factory, no drunken work, no littering, no spitting, etc.

4. Any personnel of the construction manufacturer are forbidden to carry cigarettes and lighters when entering the construction site. Before entering the factory, according to the regulations of Party A, cigarettes and lighters shall be distributed.

Lighters are stored in the cigarette storage place in the guard room. Smoking is required at the designated place, and smoking is not allowed when entering the factory. If it happens, the company to which this person belongs will be punished immediately, and the penalty amount will be more than 1000 yuan (inclusive)/every time it is discovered; If a smoker is found at the site, the company to which the person belongs shall be punished immediately, and the penalty amount shall be more than RMB 1000 (inclusive)/person, and the person shall be prohibited from entering the construction site; If cigarette butts are found at the site, the manufacturer shall be punished immediately, and the penalty amount shall be more than 1000 yuan (inclusive)/cigarette butt. If there are multiple manufacturers working in the factory and no one recognizes them, all manufacturers will be punished.

5. Construction personnel must wear safety helmets correctly when entering the construction area; When entering the production area, you must wear clothes and hats according to the regulations.

6. The bookmaker shall assign site supervisors or supervisors to be responsible for the management of all staff of the project and abide by Party A's factory regulations. Party A has the right to drive those who do not comply with the regulations away from the factory or report to the police.

7. Construction personnel can only engage in relevant construction work in the construction area, and shall not stay or wander around in the non-construction area of Party A, and shall not take any products of Party A's company without permission. Once found, they shall be driven away from the factory and shall not re-enter the factory for construction.

1. The temporary walls of 2-meter-high colored steel plates or brick walls are fully enclosed around the newly-built factory and workshop, and the scaffolding on the external wall is fully enclosed.

The whole network, the temporary construction fence is more than 5 meters away from the factory building; And set up warning signs.

2. Fire-proof materials shall be used around the reconstruction and maintenance construction area of the workshop/warehouse and other buildings to separate them from the non-construction area, and the enclosure height shall be determined according to the requirements of the construction environment. Fire-proof materials such as color steel plates, canvas, brick walls, etc.; And set up warning signs.

3. Hoisting operation: Hoisting personnel should wear safety helmets, and be surrounded by warning railings or warning tape. The warning tape is set at the rotation radius of the boom, and it is forbidden to stand or pass; When hoisting, there should be a special person in charge of unified command, and the commander should be located in the place where the operator can see clearly the whole hoisting process; And set up warning signs.

4. Edge protection must be carried out in foundation pit construction:1.2M high railing protection shall be adopted for edge protection with a depth of less than 2m, which exceeds the depth.

Close-mesh safety net must also be used for closed protection in foundation pit construction over 2M; The distance between the limb protective railing and the edge of the foundation pit shall not be less than 50cm.

5. Four-port safety protection:

(1) A protective railing with a height of1.2m is provided at the stairway;

(2) A safety protective railing with a height of1.2m and a horizontal safety protective net shall be set around the elevator shaft entrance;

(3) The reserved hole shall be provided with a protective railing with a height of1.2m and a cover plate or a horizontal safety net;

The side adopts the first layer of bamboo sheet enclosure, the second layer adopts multi-layer wooden boards, and warning signs are set, and safety notice signs are hung above the protective shed, as shown in the attached figure below. (4) The access opening is provided with a safe passage, the ceiling is provided with two protective layers, the bottom is covered with bamboo pieces, and the top is covered with 50mm thick pine boards;

Five, fire prevention and explosion protection:

1. Before hot work is carried out in the construction area, the hot work application shall be obtained according to the regulations. After approval, the hot work operator can only start hot work after signing the hot work application form for confirmation. Those who start construction without hot work application or hot work application without approval shall be punished immediately, and the penalty amount shall be more than 1000 yuan (inclusive)/time. During hot work, the safety management personnel of the construction party shall supervise the fire at the hot work site until the hot work is over.

2. Hot work in the specified area; The construction site is equipped with fire extinguishers and other related fire-fighting equipment, and the fire extinguishers must be in a complete and effective state; Take precautions against burning and explosion of solvents, dust and raw materials in workplaces.

3. The gas welding equipment, rubber hose, gas valve, pressure gauge and cutter shall be kept in good use condition, without air leakage.

4. You need to wear relevant protective equipment (such as protective glasses, etc.) during operation. If you don't wear protective equipment, it is unsafe to construct. Once found,

Immediately punish the company to which the person belongs, with a penalty amount of 1000 yuan (inclusive) or more/time.

Six, to prevent falling:

1. If there may be objects falling and scattering during operation, appropriate safety helmets and other protective devices shall be provided. When the working height is more than 2m, protective measures shall be set up with guardrails or protective covers, and safety helmets and safety belts shall be worn. If Party A finds that the construction worker is not wearing a safety helmet or a safety belt, it is willing to accept Party A's fine: the fine is above 1000 yuan/person for the first time, and the construction permit will be confiscated for the second time, and this person will not be allowed to enter the factory for construction.

2. Fences or ropes shall be set up in the dangerous areas around the civil construction site to prohibit irrelevant personnel from entering or leaving, and warning signs shall be set up. If it is not set in place according to the specifications, it will be fined 1000 yuan (inclusive) or more/time, and the construction can only be carried out after improvement is in place.

3. Put an end to throwing tools or sporadic materials on high places.

4. Construction scaffolding and scaffolding for civil construction shall be implemented in accordance with the standards for building safety and health facilities.

5. The protective work for aerial work should be fully prepared, and the construction personnel should wear protective articles (such as safety belts and safety helmets) correctly; Climbers need to use complete climbing tools (such as ladder, etc.), and at the same time, there are people watching below. Put an end to walking freely on climbing objects without handrails in the air; Don't walk directly in the lighting belt. Those who fail to comply with the specifications will be fined 1000 yuan (inclusive) or more/time.

Seven, handling measures to prevent falling:

1. When handling corrosive or prickly environments, prepare gloves, safety shoes, safety helmets or masks for the operators.

2. Appropriate tools should be used during handling, and the steel wire rope should not be overloaded. Except for personnel who need to wear safety helmets, it is forbidden for personnel to enter under the lifting objects and cranes.

3. When handling huge objects, designate an experienced person as the commander.

Eight, the construction site need safe electricity.

1. Where temporary power supply is connected for operation, construction can only be started with Party A's permission in advance, and power supply is not connected without permission.

2. Professional electricians (with certificates) are responsible for all temporary electricity consumption on the site, and other personnel are forbidden to connect to the power supply.

3. The construction site is equipped with qualified and safe special power distribution cabinets.

4. Temporary electricity utilization, with air switch as protection, shall be inspected and maintained by professional electricians, and the flower-picking wires and copper core wires shall not be randomly connected.

5. All plugs should be kept in good condition, and the electrical switch should be used for multiple purposes. It is not allowed to use the unplugged power cord to directly connect electricity.

6. Construction machinery and electrical equipment and construction metal platform have reliable grounding.

7. When the electrical circuit is overhauled, hang a warning sign "No power transmission" on the power switch.

8. When handling or using iron pieces, be careful not to touch electrical equipment.

9. During spot welding operation, the grounding wire of the electric welding machine is not arbitrarily hooked on the electric pipeline.

10. Do not touch or open or close high-voltage switches and equipment without the consent of Party A's electricity supervisor.

11.Once the above items are found, the construction unit will be punished immediately, and the fine will be more than 1000 yuan (inclusive)/time.

Nine, accident disaster treatment:

In case of accidents and catastrophes during construction, in addition to on-site emergency treatment, immediately report to Party A's engineering supervisor or on-site supervisor to assist in taking effective measures.

Ten, the construction site health

The sanitation of the construction site shall be kept clean and tidy, the equipment and materials of the construction site shall be maintained and sheltered, and the sanitation of the construction site shall be cleaned in time. If the site sanitation fails to meet the requirements of Party A, it is willing to accept a fine of more than RMB 1000 (inclusive)/time, and immediately improve it in place. XI. Other safety matters:

1. Work in a limited space, wear protective equipment and be supervised by a special person.

2. Large and medium-sized construction machinery (hoisting, transportation and rolling, etc.) shall be commanded by full-time personnel. Cranes, scaffolding,

Seat belts and other related supporting tools, according to the needs of the project, prepare complete and safe tools for standby.

3. Fully cooperate with relevant units of Party A to hold "Engineering Safety Meeting".

4. The bookkeeper promises to be responsible for publicizing the relevant safety and hygiene requirements of this undertaking to his subordinate construction personnel, and is willing to accept the inspection and supervision of Party A's on-site supervisor and safety and health personnel, and will be willing to accept corresponding punishment if it violates relevant regulations.

5. The author promises to assign a qualified supervisor with rich engineering experience to the construction site to supervise and manage the construction and require quality. Party A is only responsible for the final quality acceptance of this project. However, during the construction period, Party A needs to send people to the site to coordinate the progress of the project, and the contractor shall bear all the responsibility for the safety of the project during the construction period.

Undertaker (seal):

Legal representative:

Address:

Date of contract: year month

sun

I voluntarily accept the management of Beijing Jinyuan Dianshi Decoration Engineering Co., Ltd., and now I promise as follows:

1. Abide by and implement the company's rules and regulations and the relevant regulations of the employer on the construction site.

All words and deeds are based on the interests of the company and strive to maintain the company's image.

2. Obey the management of the company's project management personnel, take an active part in the mobilization meeting for construction, and accept the public.

Division of on-the-job training, and provide true and effective personal information as required.

3. Ensure that you are certified and listed for posts, don't be late, leave early, and don't leave your post at will. You can leave your post only after you report to the management for approval in advance.

4. Use your own safety protection articles and appliances correctly according to regulations after entering the site for construction, and ensure that you don't wear slippers, high heels and bare feet.

5. Don't take or steal materials and appliances from the construction site.

6. Don't move or remove the safety protection and safety signs on the construction site without authorization, and don't touch the electrical appliances and connect the circuits randomly according to regulations.

7. Don't drink alcohol at the construction site, make a fire to cook food at the construction site, chase and frolic at the construction site, and don't throw life and construction waste casually.

8. Be conscientious about the work, complete the task with good quality and quantity, and ensure that the site is cleared after the work in the construction operation area, and the excess materials and construction waste are cleared and stored in the specified area.

9. Solidarity and friendship among employees, mutual help, close cooperation and sincere cooperation.

Commitment (signature and seal):

20xx year month day

Commitment to Construction Article 4 I. Commitment to Civilized Construction:

1, ensure that the construction sewage does not flow out, and the construction waste in the site is piled up and cleaned up in time; Construction waste in the process of removal, to prevent flying phenomenon; In strict accordance with the requirements of environmental protection construction, try to reduce the noise generated by the construction.

2, the construction site in strict accordance with the general layout of the construction erection of temporary facilities, do materials neatly stacked, site leveling, roads, drainage unobstructed, no large area of water, temporary facilities construction to be neat and beautiful.

3. Set up a full-time civilized site administrator throughout the construction site, who is responsible for the layout of the construction site, smooth roads, material stacking, environmental sanitation, etc.

4, in the construction production area according to the construction site of each construction team for health responsibility, cleaning every day in their respective responsibility area, be clean and tidy. And formulate corresponding reward and punishment measures.

Second, the construction water and electricity company promises that when the project enters the construction site, the water and electricity will be solved by the company itself and the expenses will be borne by the company itself.

Iii. Policy handling assistance and cooperation: The Company promises to cooperate with the construction unit and relevant management departments in time to solve the problems of policy handling assistance and cooperation in time.

20 1 year x1month 26th

Construction Commitment Chapter 5 Party A: wugang city Local Road Management Office (hereinafter referred to as Party A)

Party B: Henan Huiji Energy Co., Ltd. (hereinafter referred to as Party B)

The Pingwuluo local branch line project of the Second West-East Gas Transmission Line, which our company is responsible for, implements the natural gas pipeline burying project in wugang city, which crosses several rural roads. After Party B applies to Party A and both parties negotiate, Party B promises as follows:

1 During the construction, Party B shall not affect the safety and smoothness of the highway due to the construction.

2. After the completion of the construction, Party B must restore the road to its original state according to the technical standards stipulated by the state.

3. During the construction, Party B shall set up obvious construction signs and corresponding marks at the construction site.

4. In the process of construction, in case of any safety accidents caused by Party B's construction, Party B shall bear all its responsibilities and has nothing to do with Party A..

5. In case of major inspection tasks during construction, Party B must obey the arrangement of Party A..

6. In the process of construction, Party B shall fully consider the possibility of upgrading the road it crosses. When crossing the road, the distance between the pipeline and the road surface shall be at least 2m, and corresponding measures shall be taken. If the pipeline buried by Party B cannot meet the construction requirements of Party A when upgrading the road of Party A, Party B shall unconditionally shift the gas pipeline or take other corresponding measures, which must meet the construction requirements of Party A..

7. If Party B causes damage to road ancillary facilities during the construction,

Must be restored to the original state according to the technical standards stipulated by the state, or compensate Party A according to the standards.

The above commitments are reached through negotiation between Party A and Party B, and come into effect after being signed and sealed by the legal representatives of both parties. After the commitment comes into effect, Party A and Party B shall not change the content of the commitment at will. If there are special circumstances that really need to be rectified, it shall be changed by mutual agreement. This commitment letter is made in triplicate, one for each party and one for the wugang city Municipal Transportation Administration.

Signature of the legal representative of Party A:

Signature of legal representative of Party B:

Stamp

date month year

Article 6 of the construction undertaking voluntarily accepts the management of Beijing Jinyuan Dianshi Decoration Engineering Co., Ltd., and now promises as follows:

1. Abide by and implement the company's rules and regulations and the relevant regulations of the employer on the construction site.

All words and deeds are based on the interests of the company and strive to maintain the company's image. Commitment letter of construction personnel

2. Obey the management of the company's project management personnel, take an active part in the mobilization meeting for construction, and accept the public.

Division of on-the-job training, and provide true and effective personal information as required.

3. Ensure that workers are certified, listed for posts, not late, leave early, and do not leave their posts at will. Only when they leave their posts for some reason can they report to the management for approval in advance.

4. Do a good job of on-site management of on-site staff to ensure that construction personnel abide by the company's various rules and management systems.

5. When entering the site for construction, be responsible for the acceptance of materials entering the site, and be responsible for the materials and equipment that have been used, and keep them neatly in the designated material storage area. If you lose the damage, you are willing to bear the expenses incurred. Unqualified materials are not put into storage for use.

6. Check, maintain and maintain the machines and equipment regularly, and fill in the maintenance records and call the engineering department.

Seven. According to the construction quality and technical requirements of the construction project, reasonably arrange skilled construction personnel, and do not arbitrarily replace the construction personnel at the scene.

8. Be conscientious about the work, strengthen communication with site management personnel, ensure the quality to complete the task, and ensure that the site is cleared in the construction operation area, and the excess materials and construction waste are cleared and stored in the specified area.

Nine. finished product protection measures, take necessary protection for finished products and semi-finished products in vulnerable parts.

Protection means, to ensure that the finished product is in good condition, if there is any damage, the responsible party will repair it by itself.

10. Assist management personnel to do a good job in environmental protection supervision and inspection on the construction site, specify specific measures to prevent air pollution and noise pollution, and ensure to minimize all kinds of pollution.

If I fail to fulfill the above commitments, I am willing to accept the financial penalty of 200—20xx.

Commitment (signature and seal):

20xx year month day

1. The applicant is responsible for the safe production, civilized construction and environmental sanitation of the house demolition project. The demolition applicant must earnestly assume the relevant responsibilities, strengthen the supervision of the demolition construction project, and at the same time, invest in the water, electricity and other related expenses required for the safety enclosure demolition and dust pollution prevention and control, and ensure earmarking.

Two, the demolition applicant must ensure that the demolition construction unit has the corresponding qualification grade of demolition construction; Ensure that the demolition construction unit is determined by bidding, so as to be open, fair and just; Ensure to sign the responsibility letter of safe production, civilized construction and environmental sanitation with the demolition construction unit. Before the implementation of house demolition, the demolition applicant shall send the demolition construction plan and agreement to the local house demolition safety supervision department for the record, and then the demolition construction can be started.

Three, the demolition applicant should contact and coordinate with the relevant departments, do a good job in the removal of various pipelines (such as gas, natural gas, etc.) that affect the safety of the demolition project, the displacement of water and electricity, and the handling of evaluation procedures (the demolition of dust-proof sprinkler facilities should be retained). For the demolition site that has been cut off from power and water supply, temporary construction water and electricity should be connected according to regulations to ensure dust control and water and electricity for demolition construction.

Four, the demolition of the applicant should manage the environmental sanitation of the demolition site, do a good job of rodent control, fly control and timely removal of garbage. In the implementation of house demolition, we should abide by the rule of "surround first and then demolish". Masonry fence height should be more than 2.2 meters, and white-washed, writing slogans as required. Because municipal construction is really difficult to build walls, hard materials should be set up in accordance with the regulations to block the enclosure.

Five, the demolition site must be equipped with safety supervisors and health supervisors.

Six, the demolition site should set up obvious safety warning signs, must delimit the dangerous area and assign special personnel to guard. Warning lights should be set for night operation. May affect and endanger the safety of nearby residents and pedestrians, must be firmly set up in accordance with the provisions of the protective net and safety protection device.

Seven, the demolition site should hang the construction unit bulletin board. Construction personnel must be able to use safety equipment correctly, and they must wear safety helmets and work shoes when entering the demolition site.

Eight, the demolition construction should be based on the building structure, take the top-down hierarchical demolition, not vertical.

Body crossover operation. If it is really necessary to demolish a house with frame structure by conjoined overturning, the distance from the adjacent buildings, structures and pedestrian walkways must reach more than 1.5 times of the height of the demolished building, and at the same time, the work of shock absorption and dust control should be done well. Any frame structure that may affect the safety of demolition shall not be overturned.

Nine, demolition construction shall not occupy the road, occupy green space, hinder traffic, it is forbidden to burn garbage and all kinds of waste in the construction site, and all kinds of materials removed shall be neatly stacked and cleaned up in time.

Ten, the demolition of two or more floors of the house, should be carried out according to the height of the house dust enclosure. Dust generated by house demolition must be sprinkled in time to reduce dust. Construction waste, old house materials and wastes must be dumped by vertical transportation facilities or exile tanks. Demolition materials shall not be thrown from a height without the supervision of safety supervisors.

Eleven, demolition site safety hazards must be ruled out immediately. In the event of personal injury or death, the construction must be stopped immediately, and the rescue should be organized in time, and immediately reported to the municipal and district housing demolition supervision departments, production safety supervision and management departments and public security departments.

Twelve, the demolition of the applicant failed to meet the requirements of this letter of responsibility, by the city housing demolition supervision department to the demolition of the applicant issued a "rectification notice", a deadline for rectification, and according to the specific circumstances to be informed criticism and processing.

Attachment: contact telephone list