Current location - Loan Platform Complete Network - Local tax - Individual labor contract agreement
Individual labor contract agreement

Personal Contracting Agreement

Personal Contracting Agreement, in our daily life, we need to use various contracts. A contract is a text that has strict requirements on the format. It is legally effective, so there are many issues such as writing specifications and personal contract agreements. Personal Contracting Agreement 1

Project Contracting Contract Sample Agreement

Party A:

Party B:

Party A’s house under construction____ _ room, one ***______ floor, with a total construction area of ????square meters, and the construction is contracted by Party B. After negotiation and agreement between both parties, the following contract is signed:

1. Contracting method

The contract shall be contracted by contracting work but not materials. Party A provides the materials needed for building the house, including: red bricks, river sand, gravel, lime, cement, steel, water pipes, sewer pipes, nails, wire, water and electricity, etc. Party B provides labor services, construction technology, formwork, support trees, scaffolding materials, yard nails, production and living utensils, etc.

Party B is not responsible for the painting of stairs, floors, floors, cast-in-place concrete slabs and slab bottoms. Party A is responsible for the supply of water and electricity and the timely arrival of raw materials.

Party B must ensure the quality of the project, construct according to the design drawings and Party A’s requirements, save materials, and keep the materials well and not lose them.

2. Construction Project

Party B shall undertake the construction in accordance with the design drawings or the requirements put forward by Party A. The construction of the main project of Party A's house, including walls, beams, columns, stairs, floors, formwork installation, removal of formwork, reinforcement,

cast-in-place concrete and ground, concrete cushion for front steps; Decorative indoor rough painting, tiles for the front exterior wall, cement mortar for the rear wall, tiles for the bathroom floor and walls, installation of porcelain basins, toilets, sewer pipes, and downpipes; top layer addition The slurry is polished and anti-seepage treatment is done at the same time.

3. Contracting price

The contracting price is RMB per square meter, and the building area is calculated based on the exterior wall of each floor. The parapet wall is calculated at RMB per meter, including cement mortar plastering. A construction team will be hired to pound the concrete on the floor, and Party A and Party B will each bear 50% of the cost.

4. Payment method

Party B completes the first layer of bricks and pours floor A Party A pays _____ yuan; after Party A pays in full, Party B starts laying the second layer of bricks, and after pouring the floor, Party A pays _______ yuan; after paying in full, Party B

starts laying the third layer of bricks and completes Party A will pay ____ yuan after the third floor bricks have been poured; the project will be completed and the lump sum will be paid upon acceptance.

(If Party A modifies the style of the house or raises the roof, etc., resulting in an increase in the amount of work, an additional price will be calculated for the increased amount of work.)

5. Quality Requirements

Party B shall organize the construction in accordance with the national house quality standards and requirements. If the house is not up to standard, Party B will be responsible for rework, and Party B will be responsible for the rework costs.

6. Responsibilities of both parties

Party A is responsible for the supply of water and electricity and the timely arrival of raw materials. Party B must ensure the quality of the project, construct the project in accordance with the design drawings and Party A’s requirements, save materials, and keep the materials well and must not lose them.

7. Pay attention to safety

Civilized and safe construction, if Party B's construction workers suffer work-related injuries or cause injuries to others due to construction, Party B will be responsible for everything, and Party A does not bear any legal responsibility and any fees. Civilized construction, pay attention to professional ethics, and pay attention to cleanliness and hygiene.

8. Other matters not covered shall be resolved through negotiation between the two parties.

Other matters not covered shall be resolved through negotiation between the two parties.

9. This contract is made in two copies, with Party A and Party B each holding one copy. It will take effect from the date of signature.

This contract is made in two copies, with Party A and Party B each holding one copy. It will take effect from the date of signature.

Party A’s signature (seal): Party B’s signature (seal):

Year, month and day individual contract agreement 2

1. Sample of individual contract agreement< /p>

The sample individual contract agreement is as follows:

Party A:

Party B:

The company is a joint venture of Party A and Party B. A limited liability company established in accordance with the approval of the law, after mutual consultation between Party A and Party B, reached an agreement on the relevant matters concerning the company's contracting to Party A for operation as follows:

1. The company contracted for operation to Party A , starting from the month and day of the year, the year is calculated by ***.

2. During the period of Party A’s personal contracting, Party A must ensure that the contract payment is RMB ? Dividends shall be distributed by Party A and Party B in accordance with legal provisions within two months after the end of a fiscal year. The profit exceeding the contract payment belongs to Party A.

3. During the period of Party A’s personal contracting, any operating losses shall be borne by Party A.

During the contract period, all creditor's rights and debts will be handled by Party A by itself. If any losses to the company's property are caused, Party A shall bear the liability for compensation.

4. During the period of Party A’s personal contracting, Party A enjoys full operational autonomy and personnel rights. The operating funds are raised by Party A by itself (the company's registered capital is also handed over to Party A for operation).

The operating personnel and all accounting personnel are hired or appointed by Party A. The salaries and bonuses of the operating personnel are also determined by Party A. It is paid by Party A but can be included in the company's operating expense account. < /p>

Submit accounting statements and pay taxes in accordance with the law.

6. Within three days after this agreement takes effect, the contracting company’s official seal, special contract seal, special financial seal, bank account number and financial account books will be handed over to Party A in a list by both parties for confirmation by both parties.

7. Matters not covered in this agreement shall be resolved through negotiation between the two parties.

8. This agreement will come into effect after being signed and sealed by both parties.

9. If any dispute arises under this Agreement, it shall be subject to the jurisdiction of the court where Party A is located.

10. This agreement is made in two copies, with Party A each holding two copies.

Party A: Zhejiang Province ××× Company? Party B:

Legal representative: Legal representative:

Year, month and day individual contract agreement 3

p>

Decoration Contracting Agreement

Owner (referred to as Party A): Shanxi Shengyinxiang Real Estate Development Co., Ltd.

Construction team (referred to as Party B): Shi Fazhong Construction Team

In an attitude of friendly cooperation, Party A and Party B, in accordance with the "Contract Law of the People's Republic of China" and other relevant laws, combined with the characteristics of family room decoration,

Party A and Party B are equal and On the basis of voluntariness and consensus, the following contract is signed for Party B to contract Party A for the decoration project of the "Mashou·Junting" villa model room and 17# building in Shouyang.

1. Project overview

1. Project address: Mashou Village, Mashou Township, Shouyang County

2. Decoration scope:

(1) 1 set of townhouses on the 7th floor (four bathrooms, one kitchen, three bedrooms and two living rooms), with a construction area of ??223 square meters;

(2) 1 set of superimposed villas on the 6th floor (three bathrooms and one kitchen) , four bedrooms and two living rooms), with a construction area of ??190㎡;

(3) The first and second floors of the clubhouse in Building 17#, with a construction area of ??374.86㎡.

2. Contracting method:

Party B will clear the contractor, and all materials will be supplied by Party A. Decoration project contract

3. Project cost and settlement method

1. Clearance of labor costs: Different unit prices are negotiated according to different types of work (see attachment 1), including carpentry and masonry , garbage removal fees, material handling fees.

2. Fixed project unit price method, that is, the unit price of the project in the quotation remains unchanged, and the project cost is calculated based on the actual completed project quantity.

IV. Payment method

1. After workers enter the construction site, they will pay living expenses of 20 yuan per person per day every 10 days. (Based on the on-site worker attendance sheet)

2. After the completion of the project, Party B shall present the settlement form, acceptance form and this agreement to Party A’s on-site engineer, the General Engineering Office of the headquarters, the Procurement and Supply Warehousing Department,

The contract cost department and other relevant departments will review and confirm the payment before deducting 5% of the warranty deposit as agreed. If there are no quality problems within the two-year warranty period, a one-time payment will be made. The warranty period shall be calculated from the date of completion of the project.

V. Construction

1. Party A must provide a set of drawings to Party B and be responsible for the submission;

2. There are areas not indicated in the drawings , Party B must draw a sketch or discuss with Party A for approval before construction;

3. Each major process of the construction project (concealed engineering, structural engineering, carpentry, masonry) must be approved by Party A. Proceed to the next step and fill in the "Acceptance Form for Partial Projects" (see Appendix 2);

4. The construction quality will be in accordance with the "Acceptance Standard for Residential Decoration and Decoration (DB31/T30-1999)" content for acceptance. < /p>

Both parties shall bear their respective responsibilities and economic losses for delaying the construction period;

2. Without the consent of Party A, Party B shall not purchase materials on its own. If it has been purchased, Party A has the right to refuse unconditionally. Use and may refuse to pay for the materials;

3. Party B shall inspect and accept the quality of the building materials purchased by Party A. If any quality problems are found, Party B shall promptly report them to Party A and shall have the right to refuse to use them.

If Party A insists on using it, it shall request Party B in writing, and Party A shall bear the losses caused by the quality of the materials;

4. Party B shall help Party A receive the goods and check the quantity and accessories. Accuracy;

5. Party B should do a good job in the safekeeping of materials and prohibit idle personnel from entering the construction site;

6. Party B should do a good job in protecting the finished construction products;

7. Without Party A’s permission, Party B is not allowed to take any building materials out. If theft is found, double the material price will be deducted from the labor fee.

VII. Construction Period

1. It will be completed within 45 days after the construction conditions are met. If the construction period is delayed due to Party A's factors, the construction period will be postponed; if the construction period is delayed due to Party B's factors, Party A may deduct Party B's labor cost of 300 yuan/day.

2. In accordance with Party A’s total construction period requirements, Party B will compile and submit a branch project schedule.

8. Material loss and handling

1. The material loss rates are: 2% for ceramic tiles, 1.5% for stone, 7% for aluminum gussets, 6% for wood, and 6% for keels. , the loss incurred by Party B during the decoration process is greater than the actual loss of materials, and Party A has the right to deduct the excess from the settlement.

2. When Party A’s materials are delivered to the construction site, any construction personnel of Party B shall unload and carry them unconditionally.

9. Garbage removal

1. Garbage bagging;

2. Garbage should be cleared every day;

3. Garbage shall be cleared and transported by Party B to the garbage dumping place designated by Party A.

10. Labor force management

1. Party B designates Shi Fazhong as the person in charge of the construction site;

2. Within the contract price, Party B shall provide people to follow Party A Select materials;

3. Party B shall not change construction personnel at will without Party A’s consent, and the construction site must maintain more than 2 construction personnel;

4. Without Party A’s consent, Party B shall not suspend or suspend work under any circumstances.

11. Construction Machinery

1. Party B will bring its own tools required for construction and ensure the safety and good usability of the tools. Party B will bear the maintenance costs of the tools;

2. Consumables produced by tools (such as drill bits, brushes, emery cloth, towels, cutting blades, saw blades, etc.) shall be borne by Party A.

12. Construction site management

1. The use of open flames is prohibited on site. If a fire occurs, Party B will bear all the consequences;

2. Smoking is prohibited on site;

3. Paint materials must be placed separately from other materials;

4. Party B shall carry out construction under the premise of ensuring safety. If a work-related injury occurs, Party B shall bear all the responsibilities.

13. Maintenance

1. For quality problems caused by Party B’s construction, Party B shall repair them free of charge within one year. For ordinary maintenance, Party B shall promptly notify Party B within three days after Party A notifies Party B. repair.

2. If Party B fails to complete the repairs in time according to the contract, Party A can arrange other construction teams to perform maintenance work, and the labor costs incurred will be deducted from the warranty money.

Fourteen. Contract Disputes

1. When a dispute arises, Party A and Party B shall negotiate first;

2. If negotiation fails, a lawsuit may be filed in the court where the dispute is located.

This contract is made in two copies, with each party holding one copy. It will take effect after being signed by both parties. The two contracts have the same legal effect.

Party A’s signature: Party B’s signature:

Signing date: Signing date: