D, all of the above
Correct answer: D.
120. in the standard of excellent performance? Social responsibility? Scoring items belong to category ().
I. Leadership
B. Strategy
C. resources
D, operating results
Correct answer: a
12 1. Product quality has a process of production, formation and realization, and each link affects the final product quality more or less, so it is necessary to control all the links and factors that affect product quality, which embodies the quality management idea of Total Quality Management ().
I. The whole organization
All employees
C, the whole process
Comprehensive
Correct answer: C.
122. Those who violate the provisions of the Product Quality Law shall bear civil liability for compensation or pay fines and penalties. If their property is insufficient to pay at the same time, they shall bear () first.
I. Civil liability
B. Fines
C, fines
D, pay all kinds of expenses on average
Correct answer: a
123. The function of the quality assurance system is ().
A, from the organization and system to ensure that enterprises can produce products that users are satisfied with for a long time.
B, ensure the product quality meets the requirements of the standard.
C, ensure the normal and stable production process
D, clearly define the methods and measures to ensure the production of qualified products from the text.
Correct answer: a
124.? There is no best, only better? It embodies the () principle of lean production.
First, the principle of perfection
B, the value principle
C, the principle of value flow
D, liquidity principle
Correct answer: a
125. Which of the following situations does not need to be approved by the customer PPAP ()
I. New parts or products
B. Non-conformities submitted before revision of PPAP
Product change caused by engineering change (EWO)
Rebalance the workload of operation without changing the process flow.
Correct answer: D.
126. Which of the following is not the possible cause of excessive deviation ()
First, the instrument needs calibration
B. Wear of instruments or clamping devices
C, reference error.
D, repeatability error
Correct answer: D.
127. Before installing products inspected or tested by alternative methods, the organization shall obtain () approval if required. The organization shall maintain a list of approved alternative process control methods mentioned in the control plan and conduct regular review.
A. General Manager
B, customers
C, department head
D, department in charge of the leadership
Correct answer: b
128. Management is to achieve the effect that the whole is greater than the sum of parts, so we must attach importance to the interrelated process to improve the overall effect and efficiency. This idea is embodied in the () principle of quality management.
First, full participation
B, process method
Systematic management method
D, continuous improvement
Correct answer: C.
129. Producer risk refers to () the risk borne by producers.
A the unqualified batch is judged as received.
B, the qualified batch is judged not to be received.
C the user does not accept the unqualified batch.
D, the use of unreasonable sampling scheme
Correct answer: b
130.GB/T 19580 "Performance Excellence Criteria" divides the content of organizational management into seven categories, among which? Organizational governance? And then what? Social responsibility? These terms belong to the category of ().
I. Leadership
B. Strategy
C. resources
D, results
Correct answer: a
13 1. The project manager makes a process improvement plan in the planning stage. The project manager compares the project processes, tools and technologies of other projects, determines the best practices and provides the basis for performance measurement. This technology is called which of the following? ()
First, benchmarking management
B, statistical sampling
C, experimental design
D, control chart
Correct answer: a