Summary of planning work of planning section
Summary refers to the written materials that social groups, enterprises and individuals review, check, analyze and evaluate after a certain period, a certain project or a certain work is completed, so as to affirm achievements, gain experience, find out gaps, learn lessons and have some regular understanding. You can make clear the direction of the next work, make fewer detours, make fewer mistakes and improve work efficiency. Let's write a summary for ourselves. So do you really know how to write a summary? The following is a summary of the planning work organized by the planning department for your reference, hoping to help friends in need.

Summary of Planning Work of Planning Department 1 20xx is a year of heavy planning work. The revision of land and mineral planning, the replacement of construction land and the implementation of pilot projects have greatly increased the normal planning business.

I. Basic work situation

In 20xx, land was requisitioned for project construction, and the overall land use planning of Licheng District was adjusted in eight batches. * * * It involves 26 land use projects such as Tang Ye, Ji Jiao Railway, Airport Terminal and Provincial Seismological Bureau, covering an area of 489 hectares, of which two batches have passed the examination and obtained approval documents; Three batches have initially passed the review of the provincial offices; 1 Batch under review; Two batches are being submitted in groups. * * * Land pre-examination was conducted for 20 construction projects, and the preliminary examination opinions were reported to the Municipal Bureau.

In order to ensure the smooth implementation of land development and consolidation in our region, the land development and consolidation projects in Zhonggong Town, Caishi Town and Xiying Town that do not meet the special planning of land development and consolidation in Licheng District are planned and adjusted in time. At present, the planning adjustment document is under review.

The revision of land and mineral planning is also in progress. At present, the revision of mineral planning has been basically completed, and the revision of land planning has also begun preparations for township-level planning.

The pilot project of linking construction land reported by our district has been approved by the Ministry of Land and Resources in the first half of the year, and the project plan has been reported to Jinan Municipal Bureau of Land and Resources. Because the materials of the construction land replacement project reported in the early stage cannot be improved according to the requirements of the Municipal Bureau of Land and Resources, new projects must be re-selected. At present, the combination of Heiyu Village in Xiying Town and Yin Bei in Tangwang Town has been preliminarily selected, and the materials are being further improved.

Second, the existing problems

At present, the planning department is faced with the problems of heavy work pressure, weak strength and scattered personnel. The average age of the department staff is 44 years old (second only to the petition department), which brings great inconvenience to the department work due to their own health, family and other reasons. Because the department staff are distributed in the bureau and the hall, the planning window of the hall is basically idle at present. It is suggested that the leaders of the bureau consider canceling the planning window of the hall to enrich the staff of the department.

Third, the next work plan

1, actively carry out the revision of the overall land use planning, strive for the greatest support of the Municipal Bureau, and further improve the results of the revision of mineral planning;

2. In order to ensure the index of agricultural land conversion in 20xx, actively strive for the index from the Municipal Bureau, and at the same time increase the replacement of construction land;

3. Actively cooperate with brother departments.

Summary of Planning Work of Planning Section II Since the beginning of this year, according to the work arrangement of the town party committee and government and the work requirements of the bureau leaders, our department has gone all out to actively cooperate with other departments. The work in the first half of this year is summarized as follows:

First, do a good job in the follow-up work such as statutory planning demonstration and approval.

1, the master plan of fenghuang town, Zhangjiagang City (20xx-20xx) and the protection plan of grange historical and cultural blocks. The application materials have been submitted to the ministries and agencies, waiting for the ministries and agencies to arrange time and prepare for the demonstration. In May, the ministries and agencies gave feedback on the revision of the overall planning of our town, and our department timely docked with Suzhou Planning Institute to study and discuss the revision.

2. The regulatory detailed planning of Phoenix office and port office is connected with the Municipal Planning Bureau, and relevant materials have been submitted, which has been approved by the municipal government. Our department continued to dock the final binding results completed by Suzhou Academy of Sciences, adjusted the nature of local plots of the port office and made relevant modifications. The controlled detailed planning of the port office won the Excellent Achievement Award of Suzhou Planning with a bonus of 6,543,800 yuan.

3. The regulatory detailed planning of the core area of Fenghuang New Town and the regulatory detailed planning of Emei Mountain area have been basically completed. After finding out the landfill situation of 9# plot, our department docked with the Soviet Academy of Sciences for many times to discuss and study the reasonable scheme of commercial development of this plot; Combined with the investment promotion work, the regulatory detailed planning of Emei Mountain area will be adjusted in time. The above two regulatory detailed planning will be reported to the Municipal Planning Commission after it is clear whether it will be reported to the township level again.

Two, scientific planning, promote the construction of new city projects, improve the quality of new city.

1. Accelerate the construction of Phoenix Science and Culture Center, Central Primary School and Central Kindergarten.

Interior decoration of Kewen Center: organize Su Ming Decoration and Cultural Center and other relevant units to report the interior decoration scheme of Kewen Center for three times in February, March and May, discuss and study the interior decoration scheme of each functional area of Kewen Center, and put forward relevant opinions and requirements on the total price control, decoration style, floor, wall materials and lighting of the whole project, and finally form the interior decoration scheme of Kewen Center;

Curtain Wall of Kewen Center: Organize Jiucheng and Kelida to discuss and study the construction details of curtain wall of Kewen Center, the entrance curtain wall of cinema, the connection between glass curtain wall and stone curtain wall, and the window opening of building wall, and complete the construction drawing design of curtain wall of Kewen Center.

Construction drawing: coordinate geological prospecting units to carry out geological exploration for central primary schools and central kindergartens, and complete construction drawing design. Docking the nine cities and adjusting the master plan of Kewen Center, Central Primary School and Central Kindergarten according to the latest red line; Adjust the functional layout of the library's 24-hour reading room and parent-child reading room, and adjust the steel structure at the top of the gymnasium according to the functional requirements.

2. Accelerate landscape planning and construction in key areas.

Landscape planning and design of Hanjiang Road and Fenghuang Avenue: organized Cheng Lang Designers and Design Institute for many times to make scheme reports and special studies, and made field measurement and investigation on the landscape planning space and current situation, so as to provide detailed data for the design. The constant water level of landscape design is discussed and studied, and the final scheme is formed by comprehensively considering the spatial layout of pipelines in the new city.

Planning and design of the mine landscape of 10# plot: Lang was invited to design the mine landscape of 10# plot and conduct on-site investigation of 10# plot. Combined with the scheme design of urban commercial complex in my town 10# plot, the preliminary scheme design is completed.

3. Do a good job in the preliminary data and follow-up work of land transfer in new urban areas.

Docking with the land department, Xincheng 2#, 7-8#, Phoenix Court, Procuratorate and Phoenix.

Six plots, such as hotel, Phoenix Lake Tea Room and Yuanxiang Project, were identified, the planning conditions and preliminary scheme design of No.2 and No.7-8 were drawn up, and the land transfer cost was calculated. The red lines of land requisition for plots 3# and 4# were marked on site, and the red lines of land requisition on both sides of Wang Hu Road were adjusted.

4. Accelerate the planning and design of comprehensive pipelines in the new town and improve the infrastructure of the new town.

Combined with the power, telecommunications, mobile, water supply and drainage departments, the municipal pipelines in the core area of the new city were comprehensively arranged, and the relevant units were organized to conduct many field investigations, find out the current situation, carefully analyze and discuss, and comprehensively consider the needs of each block, so as to formulate and study the comprehensive pipeline scheme design of Fenghuang New City, which laid a planning foundation for the subsequent infrastructure construction of the new city.

The third is to actively carry out the planning of reserved villages and create a new bright spot of "beautiful countryside"

"Layout Planning of Reserved Villages in fenghuang town" was published and issued by the Municipal Planning Bureau. My department called the land, and the villages learned about the development direction, land for development, and the number of farmers who started work immediately. According to the spirit of town and village construction meeting, the Detailed Rules for the Implementation of Farmers' Housing Construction in fenghuang town Reserved Villages was compiled, and the Urban and Rural Planning Technical Service Center of the Municipal Planning Bureau was invited to make detailed planning for 35 reserved villages in the town. At present, the preliminary investigation work of Chengdun Village Hotel Lane, Qingshui Village Lujia Village Base and Weizhuang Village Huangjia New Bridge has been completed, in which Hotel Lane has completed the reconstruction plan of three-star well-off village in the core area and reported to the municipal government, and Qingshui Village Lujia Village Base and Weizhuang Village Huangjia New Bridge have completed the preliminary scheme design.

Fourth, attach importance to the planning of ancient towns and promote the protection and construction of ancient towns in an orderly manner.

According to the spirit of the on-site office meeting of the main leaders of the town, the planning of the fifth phase of the grange project was started immediately. The design of Tianzhuang Inspection Office and Yizhuang Project actively connects with the cultural protection department, and the design institute determines the design scale, functional layout and architectural modeling. At present, the scheme design has been completed. improve

Scheme and construction drawing design of entrance flat bridge and road in Tianzhuang Guzhen District Phase V project. Complete the preliminary scheme design of Jiyuan Taoist temple, new ancient house and road system.

5. Continuously improve the construction quality of resettlement areas and promote urban-rural integration.

Complete the preliminary design of eight projects, such as the decoration of grange community service room, the kitchen scheme of grange convenience restaurant, the expansion of grange primary school, kindergarten and Fenghuang primary school canteen, the fourth phase outdoor supporting project of Shuanglong Garden, the housing and wedding hall of Anqing Garden Club, the fence of Phoenix Garden and the addition of parking spaces in grange Garden, so as to continuously improve the quality of resettlement communities and do a good job in planning and service.

Six, the new investment work

1. Collate the economic and social data of No.2, No.7-8 and fenghuang town in 20xx, and update and adjust the real estate investment manual of Phoenix New Town with Ogilvy & Mather Advertising Company.

2. Sort out the list of the top 200 real estate enterprises in China, the top 50 real estate enterprises in Jiangsu and the top 20 enterprises in Suzhou, and do a good job in grasping the basic information of attracting investment in the new city.

3. Docking the pie. Com, discussed and studied the 20xx fenghuang town land investment promotion plan, and formed the final plan, and participated in the Suzhou real estate promotion meeting.

4. Cooperate with the holding company to connect with Sino-Singapore Group, Royal Qi Long and other units, introduce and negotiate the development of Emei Mountain area, and provide relevant information about fenghuang town's economy, society and planning.

5. Cooperate with the holding company to connect with Yuanxiang Group, and answer questions about gas, electricity, water supply, cable TV and so on in the design process of commercial complex project.

VII. Daily Planning and Management

1, issued 34 opinions on planning and site selection, 34 opinions on pipeline site selection 10, 2 planning permits for construction land, 4 planning permits for construction projects and 49 housing permits for farmers.

2. The Comprehensive Law Enforcement Bureau and the Engineering Department jointly carry out joint examination and approval twice a week. As of June, * * * has approved 57 outdoor advertisements, temporarily occupied 7 excavated roads, temporarily fenced 1 1, and hung and posted 3 buildings and facilities.

3. Complete the preliminary procedures such as land cost calculation and planning conditions. Handle the land bidding, auction and hanging 1 1 case for the third phase resettlement housing, and complete the land bidding, auction and hanging and house quality appraisal.