First, open the technical bid, and then open the economic bid. So what should be paid attention to in the preparation of the tender?
I. Pre-production

1. Pay attention to whether the tenderee has any special requirements. Different tenders have different formats and typesetting requirements, such as the composition and order of tenders. Therefore, the first thing we should do before bidding is to carefully study the tender documents of the tenderer, which is also the basis for the evaluation of bids by the judges, so that we can not only understand the format of the tender, but also know where to make statements and ask questions to the judges during the evaluation.

2. The tender is generally composed of commercial tender, economic tender and technical tender.

1) economic standard part;

A. Pay attention to carefully check whether the cases are correct, and also check whether the number of cases is consistent;

B in the part of itemized quotation, it is also necessary to check the quotations of each itemized quotation, and then whether the final comprehensive quotation is consistent and correct. Capitalization refers to Arabic numerals and Chinese characters such as 1, 2, 3, 4, 5, 6, 7, 8, 9, 100, 1000, 1000 and so on. These figures should not only be recognized, but also written, because some units need a second quotation.

2) business part;

Tax registration certificate, legal person power of attorney, * * * *, project manager qualification certificate, performance certification materials, etc. , should be carried out in strict accordance with the requirements of the tenderer. Some companies have different power of attorney for products, some require it to be placed in the business part, and some require it to be placed in front of the last color page, which can only be sorted out after careful study.

3) technical part;

Technical part 1, construction deployment; 2, the construction site layout; 3. Construction scheme; 4, construction technical measures;

5, construction organization and construction schedule (including the division of construction period, the main process and labor arrangement, as well as the construction management organization or project intends to); 6. Construction machinery and equipment; 7. Quality assurance measures; 8, time limit for a project guarantee measures;

9, safety construction measures 10, civilized construction measures;

4) Overall bidding time;

In fact, we usually don't pay much attention to the input of time, mainly within the specified time before bidding, but the problem lies in the replacement of the old and the new, for example, when the tender was announced at the beginning of 20 1 1 0/0, and then many times we would find the previous format to make a tender, and then change the time and date, so our tender became last year's. So the next time a colleague wants to make a tender when the old one is replaced with the new one, he must be reminded that this year is 20 1 1, or 20 12 and so on. I hope this can also become a small element of the group effect of one of our companies.

5) After repeated inspection, a printed version can be made.

Second, the original production

The original is the basis of the whole tender, so repeat it carefully before printing.

1) Signature of authorized person and legal person;

Pay attention to the place where the authorized person needs to sign and the place where the legal person signs in the tender. It is not allowed to sign the wrong place, and at the same time, it is necessary to ensure that the same person does not sign two.

2) small signs;

Each page requires the authorized person to sign in the lower right corner of the tender. Here, first of all, we should pay attention not to be too far away to facilitate binding. Secondly, it is a question of words. Make sure that the name of each page is the same (especially when signing for others), and at the same time, make sure that every word is the same.

3) seal;

Every page should be stamped with the company seal, carefully checked and tried not to miss it.

Third, binding

1) copywriting;

After the audit, the original can be copied, usually one original and four copies. The first page under the cover of the copy must also be the first page of the bid documents printed with the copy. At the same time, stamp the cover of each tender.

2) bagging;

One original is put in a bag alone, and the other copy is put in another bag, then sealed, affixed with a sealing strip (the time on the sealing strip should also be noted), sealed and stamped on the sealing strip (note that half of it is on the sealing strip and half is on the sealing bag as far as possible).

Four, the rest of the documents shall be made separately.

The first is the bid opening list. Many units require separate sealing, and the sealing format is the same as the tender. Check whether the bidding documents have requirements for electronic CDs, and seal them after engraving. Review the bidding documents again to see if there are any omissions, and try to meet the requirements of the bidding unit as much as possible when making them, because you have to do this to enter the threshold and talk with others at the same starting line, otherwise even if you do more work and efforts in the early stage, it will be in vain because of the mistakes in the bidding documents, and finally you will wait for other companies to get something for nothing.