Current location - Loan Platform Complete Network - Local tax - Self-evaluation of architectural engineers _ Summary and evaluation of personal work of architectural engineers
Self-evaluation of architectural engineers _ Summary and evaluation of personal work of architectural engineers
Find your correct position in the busy work, so does the construction engineer. Self-evaluation of your work is the judgment of your work performance. I'd like to share with you some self-evaluation essays of construction engineers, hoping to give you some help.

Model essay on self-evaluation of architectural engineers Part I

I have strictly abided by the laws and regulations of the country since I joined the work, and have never participated in any illegal and disciplinary activities. Firmly support the leadership of China's * * * production party, adhere to the party's reform and opening up, take the spirit of "Theory of Three Represents" as the action program of their work, and make their due contribution to the construction of China's distinctive socialism. I strictly abide by the rules and regulations formulated by the unit, be strict with myself, be lenient with others and play a leading role. In my work, I have been studying, studying and summing up experiences and lessons. From a "layman" in the construction industry to a project manager with comprehensive and mature professional technical ability and management ability, I have independently undertaken the construction of housing construction, bridges, roads and drainage projects, and made great achievements in political thought, professional ethics and professional level, which are summarized as follows:

I. Political Thought In my work, I am very supportive of the Party's policies and guidelines. Every day, I insist on watching news broadcast TV programs, care about and study the current affairs and politics of the country, apply the Party's political thoughts and guidelines to engineering construction, often discuss with project department personnel, and organize project department personnel to study and publicize the Party's policies and guidelines. I have earnestly studied and realized the Party's "Three Represents" and "Sixteenth National Congress" spirit, taking "Theory of Three Represents" as the criterion of my work, taking the spirit of the Sixteenth National Congress as my goal, and contributing a little to the cause of building a "well-off" social life in an all-round way.

2. Work attitude and career path Since I joined the work, I have been fond of the construction industry, and I am diligent and hardworking in my work, and I will finish what I started. I always insist on the successful completion of projects that are no matter how hard or tired they are, and make achievements, and never care about personal gains or losses. I often work overtime and grab the construction period all night. No matter in the cold wind, the scorching sun or the rainstorm, I stick to my post and command the smooth completion of one project. I feel extremely proud and glorious in my heart when I watch the completion of high-rise buildings and silver-gray avenues. I have paid countless hardships and sweat, which has been well received by the society, and I have no regrets and satisfaction in my heart.

Third, the level of knowledge and professional ability At work, I constantly learn cultural knowledge and professional knowledge, and strive to improve my knowledge level and special ability. I have been taking the national self-taught examination for electronics major since 199 1 year 10, and now I have obtained the certificate of six courses, taking computer as a compulsory course for my work, and I have been able to use computer to do office work. For the new specifications, standards and quotas of the construction industry, every time they are introduced, I will buy and study them carefully, master them, apply them to engineering construction, and constantly sum up experiences and lessons. When each project is completed and accepted, I carefully prepare the project acceptance record, and put it into a book, which is stored in my own project completion acceptance record file. I often analyze and study the completion acceptance record, and find out what problems I have in the project construction, which aspects are worth improving and which aspects are worth continuing to carry forward. Now I summarized some technical treatment measures in project management as follows:

1, cracks in precast slab in brick-concrete structure. Preventive measures are as follows: clean the joints of precast slabs and dry them in the air, then set a bottom die under the joints, brush the joints with plain cement slurry, and then fill the joints with1:2.5 cement mortar, the height of which is 1/3 of the thickness of the slab, and vibrate for compaction. The sand is preferably coarse sand, and finally fill the joints with fine stone concrete and vibrate for compaction. Strengthen maintenance. In this way, the plate seam is not easy to crack.

2. In bridge construction, the design of concrete closure groove and the concrete pouring sequence: the bridge closure groove should be designed at the top and one third of the span of the bridge arch, and it is forbidden to design it at arch support. When pouring concrete, the vault concrete should be poured first, then the bridge arch concrete in arch support should be poured symmetrically, then the arch body concrete should be poured symmetrically, and finally, when the concrete strength reaches more than 70%, the closed channel concrete should be poured at the temperature.

3. Treatment method of expansion joint in road construction: The traditional treatment method of expansion joint is to set dowel bars, which often leads to concrete pavement fracture if it is not handled well, which will affect the appearance and use function. What I introduced is the vibrating beam expansion joint, which does not need to be equipped with dowel bars. Its method is as follows: Dig a groove at the base of the expansion joint, and its size is long? Wide? How long is the expansion joint? 50CM? 20CM, after trench excavation, C30 concrete is poured, and its surface is flat with that of the base, then two layers of linoleum are spread on the concrete surface, and finally pavement concrete is poured, which is separated by wood wool board or foam board with a width of 2CM at the expansion and contraction place, and asphalt flax and ointment are poured in the joint. Iv. project management the management of construction projects is a complicated and varied work, and the quality of management is directly related to the economic and social benefits of the project. Engaged in management for many years, I think project management is a system of overall arrangement, rational utilization and comprehensive management. Personnel, materials, machinery and articles should be carefully organized, deployed and reasonably utilized. Manage production safety to the maximum extent, adhere to the policy of "safety first", ensure the engineering quality, adhere to the principle of "quality for survival", strictly control the engineering quality, strive for rapid progress of the project, abide by the construction contract, reduce the engineering cost, and create the engineering project with the best quality, safest production and lowest engineering cost in the shortest time. The construction industry is an industry with profound knowledge and a wide range of knowledge. It can be said that it is an industry of "learning from old age". In the future work, I will study cultural knowledge and professional knowledge harder, practice constantly, do my job well and make more contributions to society.

I was recognized as an assistant engineer in 19991February. I worked in Hebei Second Engineering Construction Co., Ltd. and Tangshan Modern Construction Engineering Co., Ltd. successively, and served as the chief of the technical quality department of Tangshan Modern Construction and Installation Engineering Co., Ltd. in September of 20 15. During this period, I worked hard to study professional technical knowledge, and worked hard to promote "new technology, new structure, new materials and new equipment" in the process of technical management, and devoted myself to scientific and technological innovation and progress. As an assistant engineer, he successively served as technical director in Fengnan State Taxation Bureau's group residential community project and Tangshan No.1 Middle School's second teaching building project. After the completion of these two projects, they were both rated as high-quality projects in Tangshan City, and the second teaching building project in Tangshan No.1 Middle School was also rated as a high-quality project in Hebei Province in 20 15 on the basis of being rated as a city-class project. During the years of training in the front line of construction, through integrating theory with practice, the professional theoretical knowledge learned in college has been quickly transformed into professional ability. As the company's technical and quality management department, under the direct leadership of the company's chief engineer, we are meticulous in technical management and strictly control the engineering quality. After several years' efforts, the company has established a strict management system and obtained three internationally recognized certifications of construction enterprises: quality management system (iso900 1), occupational safety and health management system (oshms) and environmental management system (iso 1400 1), ranking first in Hebei Province. Over the past five years, in the process of contributing to our development, we have also enriched and improved our professional and technical capabilities.

Model essay on self-evaluation of architectural engineers Part II

Many years of experience in construction site management of large-scale projects, responsible for the management of engineering technology, progress, quality, cost and safety. Familiar with building construction specifications and acceptance specifications; Be familiar with the whole process of project operation and master the technical requirements of various projects. Can effectively organize, lead and coordinate the work of the general contractor and subcontractors, strictly fulfill the contract requirements, and complete the set quality, schedule and cost targets. Love their jobs, set an example and have strong team coordination and management skills. He holds the intermediate professional title of architecture (certificateNo. XX052376 1) and has obtained the national first-class constructor qualification certificate (certificate No.0 1277 17). Proficient in using autocad and office series office software.

I have rich knowledge, excellent self-regulation ability, good health and can maintain a good working condition for a long time. Indifferent personality, growing up in a military family, with strong self-discipline and sense of teamwork. Serious and responsible work attitude, and strive for perfection in performing post responsibilities. He has worked in China Construction No.1 Bureau, China Construction-Dacheng Company and other units. He has been engaged in the on-site management of the general contractor for a long time, familiar with the project management process of the general contractor, the contractor and the supervisor, and has a deep understanding of construction organization, construction technology, communication and coordination. In XX, I passed the first batch of national registered first-class construction engineers, and strived to become an excellent project manager (production manager), reflecting my own life value.

I have been working in the project department of Beijing Construction Engineering Construction Co., Ltd. since April of XX. Mainly involved in bidding, writing scheme and disclosure, drawing on-site construction drawings, holding negotiations, dealing with supervision and Party A, and making as-built drawings. Since April XX, I have worked as a site civil engineer (site representative of Party A) in the construction of an electronic workshop.

I have been working for nearly 20 years, and I have worked in the construction field for many years, from initial maintenance and leakage construction to supervision of advanced decoration, high-rise buildings, municipal roads, bridges and so on. I have served as a clerk, builder, deputy project manager, project supervisor, project director and other positions in the infrastructure department. From the grass-roots level to the management level, they have suffered heavy work pressure.

I know that only by mastering excellent professional skills, having good communication skills and teamwork spirit can I work effectively. At the same time, I also used my spare time to actively improve myself, completed the self-taught undergraduate course (project management), and successfully passed the second-level architect (building construction and decoration) exam. I am eager to have more room for development in the new environment.

He has also worked in the construction company of Beijing Construction Engineering Group for nearly 20 years, and served as the technical chief engineer and project manager of the project for a long time. Among them, he once served as the project chief engineer of more than 200,000 square meters project and the project manager of100,000 square meters project, and has rich practical experience in construction. Enthusiastic and proactive in work, with good interpersonal skills.

Model essay on self-evaluation of architectural engineers Part III

In XXX years, I served as the deputy chief engineer of the company's construction and installation major and the president of Jian 'an Institute. Under the correct leadership of the party and government of the company, I united the team members of Jian 'an Institute closely around various tasks, ran through the ideological line of seeking truth from facts in practical work, paid attention to safety production and management, and strengthened the construction of the staff, fully mobilized the enthusiasm and creativity of all staff, enhanced the cohesion and combat effectiveness of the whole team, and ensured the smooth completion of construction production and various tasks.

The construction and installation work in 20xx years has created the best level in history, with high enthusiasm, enthusiasm and initiative of employees. Comrades almost gave up all their rest time to work. Through the concerted efforts of all employees, the output value was nearly 240 million yuan, and the profit level was greatly improved.

In order to ensure the quality of construction and installation products, we have formulated and improved management systems and standards in strict accordance with the requirements of the quality management system, such as process management standards, equipment management standards, technical standards and personnel work standards. Always insist? Quality first? Based on the principle of quality assurance, combining prevention with inspection, and full participation, we strictly implement various management systems, clarify the responsibilities of personnel at all levels in product production and management, and strengthen the inspection and acceptance of the quality of results. In the field construction, we strictly follow the rules and norms, fully implement the quality standardization work, strengthen the equipment management and personnel training, reduce the quality accidents, and obviously improve the work quality. The excellent rate of results reached 75%, the qualified rate of products 100%, and the service satisfaction rate reached over 90%.

In safety management, work is carried out in strict accordance with the requirements of safety production management system, and adhere to? Safety first, prevention first? Policy, strengthen safety training and safety education, strengthen the implementation of safety measures in production activities, clear the responsibility system for safety posts, strengthen on-site safety inspection, and timely rectify the existing problems in safety production, ensuring safety production and no major safety accidents.

Summarizing the work of one year, there are still some shortcomings, such as the internal management of the unit needs to be strengthened, the corresponding rules and regulations need to be further improved, the study needs to be strengthened, and communication and contact need to be strengthened at work. In my future work, I will carry forward my achievements, overcome my shortcomings and do my job well.

Guess you like:

1. Self-evaluation of civil engineers

2. Civil engineer self-evaluation model essay

3. Model essay on job application resume of construction engineer

4. Model essay on self-evaluation of construction engineering

5. Engineer's work self-appraisal