Installation steps and requirements of charging piles for timely electric vehicles
All sockets installed on the wall or garage must be higher than the conduit.
Installation steps and requirements of charging piles for timely electric vehicles
When installing the socket on the square steel, the inlet of the line pipe and the bottom box should be placed in the square steel or PVC pipe to avoid the socket line from being exposed.
Installation steps and requirements of charging piles for timely electric vehicles
The installation wiring is clear, and the installation shall be carried out in strict accordance with the wiring sequence requirements of the wiring diagram in the charging pile machine.
Installation steps and requirements of charging piles for timely electric vehicles
The stripping of main cabinet and socket terminals of timely electrical equipment is 25px.
Installation steps and requirements of charging piles for timely electric vehicles
Installation and timely charging of electrical equipment. The main chassis and socket should be solid and beautiful;
Spray or paste the corresponding socket number on each socket, and print and paste the codec on the side of 1. The main power line is 72V, and the power of the car is basically 300W.
If there are 10 hosts, the upper limit is the power line at full load of 300W* 10 port = 3000W w.
20-way host, the upper limit under full load is 300W*20 ports = 6000W and so on. ...
2. Before installing a timely charging station and laying conduits and sockets on the wall, you need to draw a horizontal line first. Ensure that the main chassis is horizontal and vertical to the conduit and socket when charging in time. If the equipment installed in the carport does not fall, 40×80mm galvanized square steel can be installed and fixed on the shed column. When installing socket connection on square steel, the conduit must be fixed below the socket, that is, at the bottom of square steel.
3. When installing the catheter, it needs to be fixed with a U-shaped card. Install a U-shaped card every 80cm or so, and add an extra U-shaped card with elbows and tees on both sides. When turning, you can use a pipe bender to bend the pipe.
4. When installing the socket bottom box, four screws should be punched in the four corners of the socket bottom box.
5. Install the main chassis of the electric charging pile on the wall or column in time, which is convenient for users to charge, and punch holes on the wall or column according to the position of the mounting holes on the back of the chassis, and install and fix them with expansion screws or direct tapping screws (M8-M 10) respectively;
According to the length of general electric car charger wires, the height of the top of the output socket from the ground is 2000px. Sockets should be equally divided according to the length of the carport, but the center distance in sockets should be 0.8- 1 m or longer. If the site is wider or narrower, the spacing of sockets can be widened or narrowed appropriately. However, the distance between sockets should be equal, the installation height of equipment should be between 120-3500px from the bottom of the equipment to the ground, and the host should be placed in the center of 10 socket.
Wire standards for input ammeter and charging pile main cabinet: JSD- 10KWB0 1 and JSD-10KW012.5 square meters (national standard) single equipment copper core wire.
Conductor standard of outlet (socket): 1.5 square (national standard) copper core;
Installation wiring must be covered with PVC conduit (national standard), and the installation conduit should be horizontal, flat and vertical, without open wires. When turning, elbow or pipe bender can be used to turn the conduit. The tee joint and pipeline of the line branch cannot be suspended, and the reserved length of the conductor leading out from the outlet (socket) is about 375px.
Installation steps and requirements of charging piles for timely electric vehicles
All sockets installed on the wall or garage must be higher than the conduit.
Installation steps and requirements of charging piles for timely electric vehicles
When installing the socket on the square steel, the inlet of the line pipe and the bottom box should be placed in the square steel or PVC pipe to avoid the socket line from being exposed.
Installation steps and requirements of charging piles for timely electric vehicles
The installation wiring is clear, and the installation shall be carried out in strict accordance with the wiring sequence requirements of the wiring diagram in the charging pile machine.
Installation steps and requirements of charging piles for timely electric vehicles
The stripping of main cabinet and socket terminals of timely electrical equipment is 25px.
Installation steps and requirements of charging piles for timely electric vehicles
Installation and timely charging of electrical equipment. The main chassis and socket should be solid and beautiful;
Spray or paste the corresponding socket number on each socket, and print and paste the codec next to it.
If there are 10 hosts, the upper limit is the power line at full load of 300W* 10 port = 3000W w.
20-way host, the upper limit under full load is 300W*20 ports = 6000W and so on. ...
2. Before installing a timely charging station and laying conduits and sockets on the wall, you need to draw a horizontal line first. Ensure that the main chassis is horizontal and vertical to the conduit and socket when charging in time. If the equipment installed in the carport does not fall, 40×80mm galvanized square steel can be installed and fixed on the shed column. When installing socket connection on square steel, the conduit must be fixed below the socket, that is, at the bottom of square steel.
3. When installing the catheter, it needs to be fixed with a U-shaped card. Install a U-shaped card every 80cm or so, and add an extra U-shaped card with elbows and tees on both sides. When turning, you can use a pipe bender to bend the pipe.
4. When installing the socket bottom box, four screws should be punched in the four corners of the socket bottom box.
5. Install the main chassis of the electric charging pile on the wall or column in time, which is convenient for users to charge, and punch holes on the wall or column according to the position of the mounting holes on the back of the chassis, and install and fix them with expansion screws or direct tapping screws (M8-M 10) respectively;
According to the length of general electric car charger wires, the height of the top of the output socket from the ground is 2000px. Sockets should be equally divided according to the length of the carport, but the center distance in sockets should be 0.8- 1 m or longer. If the site is wider or narrower, the spacing of sockets can be widened or narrowed appropriately. However, the distance between sockets should be equal, the installation height of equipment should be between 120-3500px from the bottom of the equipment to the ground, and the host should be placed in the center of 10 socket.
Wire standards for input ammeter and charging pile main cabinet: JSD- 10KWB0 1 and JSD-10KW012.5 square meters (national standard) single equipment copper core wire.
Conductor standard of outlet (socket): 1.5 square (national standard) copper core;
Installation wiring must be covered with PVC conduit (national standard), and the installation conduit should be horizontal, flat and vertical, without open wires. When turning, elbow or pipe bender can be used to turn the conduit. The tee joint and pipeline of the line branch cannot be suspended, and the reserved length of the conductor leading out from the outlet (socket) is about 375px.