Difference between 2020 Edition of Management Measures for Engineering Cost Consulting Enterprises and 20 15 Edition
I will answer the question of the difference between the 2020 version of the management measures for engineering cost consulting enterprises and the 20 15 version. The main revisions in the 2020 edition are as follows: 1. Revise the Administrative Measures for Engineering Cost Consulting Enterprises and change "cost engineer" to "first-class cost engineer". The number of staff required by the engineering cost consulting company is adjusted to the number of first-class cost engineers and second-class cost engineers; Modify the "enterprise in the application of engineering cost consulting Grade A (or Grade B) qualification, and the application materials that should be submitted when the qualification is renewed or changed. Two, modify the "Management Measures for Registered Cost Engineers" to clarify the registration process and precautions for applying for first-class and second-class registered cost engineers; Clarify the scope of practice and matters needing attention of applying for first-class and second-class registered cost engineers. 1. Delete Item 2 of Article 9 of the Measures for the Administration of Engineering Cost Consulting Enterprises (DecreeNo. 149 of the Ministry of Construction, revised according to Decree No.24 of the Ministry of Housing and Urban-Rural Development and Decree No.32 of the Ministry of Housing and Urban-Rural Development). (Original: (2) Among the investors of the enterprise, the number of registered cost engineers shall not be less than 60% of the total number of investors, and the capital contribution shall not be less than 60% of the total capital contribution subscribed by the enterprise; Item 3 of Article 9 is changed to Item 2, in which "cost engineer" is changed to "first-class cost engineer". (Original: (3) The technical person in charge has obtained the registration certificate of cost engineer, and has a senior professional technical title in engineering or engineering economy, and has been engaged in engineering cost professional work for more than 15 years; Item (4) of Article 9 is changed to Item (3) and amended as: "There shall be no less than 12 full-time personnel engaged in the professional work of engineering cost (hereinafter referred to as full-time professionals), among which, the total number of personnel with intermediate or above professional titles in engineering (or engineering economics) or who have obtained the registration certificate of second-class cost engineers shall be no less than 10; There are not less than 6 people who have obtained the first-class cost engineer registration certificate, and other people have experience in engineering cost professional work. " (Original: Requirements for Grade A qualified enterprises: (4) There shall be no less than 20 full-time personnel (hereinafter referred to as full-time professionals), among whom there shall be no less than 16 personnel with intermediate or above professional titles in engineering or engineering economics; No less than 10 people have obtained the registration certificate of cost engineer, and other personnel have experience in engineering cost specialty; ) Delete items 6, 8 and 9 of Article 9. (Original: (6) The personnel file relationship of full-time professionals is managed by a nationally recognized personnel agency; (eight) has a fixed office space, the per capita office building area of not less than 10 square meters; (nine) the technical file management system, quality control system and financial management system are complete; Item 11 of Article 9 is changed to Item 7, in which "Article 27" is changed to "Article 25". Delete the first paragraph of Article 10. (Original: The qualification standards for Grade B engineering cost consulting enterprises are as follows: (1) Among the investors of the enterprise, the number of registered cost engineers shall not be less than 60% of the total number of investors, and their capital contribution shall not be less than 60% of the total subscribed capital contribution; Item 2 of Article 10 is changed to Item 1, and the "cost engineer" is changed to "first-class cost engineer". Item 3 of Article 10 is changed to Item 2, which is amended as: "There shall be no less than 6 full-time professionals, among whom, there shall be no less than 4 persons with intermediate or above professional titles in engineering (or engineering economics) or who have obtained the registration certificate of Grade II cost engineer; There are not less than 3 people who have obtained the first-class cost engineer registration certificate, and other people have experience in engineering cost professional work. " (Original: (3) There shall be no less than 12 full-time professionals, among whom there shall be no less than 8 persons with intermediate or above professional titles in engineering or engineering economics; No less than 6 people have obtained the registration certificate of cost engineer, and other personnel have experience in engineering cost professional work; Delete items 5, 6 and 7 of Article 10. (Original: (5) The personnel file relationship of full-time professionals shall be managed by the personnel agency recognized by the state; (6) Having a fixed office space with a per capita office building area of not less than 10 square meter; (seven) the technical file management system, quality control system and financial management system are complete; Item 10 of Article 10 is changed to Item 6, in which "Article 27" is changed to "Article 25". Article 13 is amended as: "An enterprise shall submit the following application materials when applying for Grade A (or Grade B) qualification of engineering cost consulting, and when its qualification is renewed or changed:" (1) An application for qualification of engineering cost consulting enterprise (including? Commitment letter from the legal representative of the industry); "(two) full-time professionals (including technical leaders) with intermediate or above professional titles and ID cards; "(three) the project cost consulting business income invoice issued by the enterprise and the corresponding project cost consulting contract (if the invoice can reflect the project cost consulting business, the corresponding project cost consulting contract may not be provided; New application for the qualification of engineering cost consulting enterprise is not required); "(four) qualification certificate of engineering cost consulting enterprise (new application for engineering cost consulting enterprise qualification, do not need to provide); "(5) Business license of the enterprise. "When an enterprise applies for Grade A (or Grade B) qualification of engineering cost consultation, and when the qualification is renewed or changed, the legal representative of the enterprise shall make a commitment to the following matters, which shall be investigated and verified by the qualification licensing authority:" (1) The enterprise signs a labor contract with full-time professionals; "(2) Value-added tax paid by enterprises on operating income; "(3) The enterprise pays the social basic old-age insurance fee for full-time professionals (including technical leaders) this year." (Original: (1) Application for Qualification Grade of Engineering Cost Consulting Enterprise; (two) full-time professionals (including technical director) of the cost engineer registration certificate, cost qualification certificate, professional and technical title certificate and identity card; (three) the personnel agency contract of full-time professionals (including technical leaders) and the certificate of the social basic old-age insurance fee paid by the enterprise for this year; (4) The articles of association of the enterprise and the investment agreement of shareholders; (five) the business tax invoice of the enterprise to pay the operating income or the business tax payment certificate issued by the tax department to pay the operating income of the project cost consulting; If the business income of the enterprise includes other business income, it is also necessary to issue a financial audit report on the business income of project cost consulting; (six) the qualification certificate of the engineering cost consulting enterprise; (7) Business license of the enterprise; (eight) the lease contract or property right certificate of the fixed office; (nine) documents related to the enterprise's technical file management, quality control, financial management and other systems; (ten) other materials as prescribed by laws and regulations. Item (9) in the first paragraph of Article 14 is amended as Item (4). The third paragraph of Article 15 is amended as: "Project cost consultation? If an enterprise loses its qualification certificate, it shall apply to the qualification licensing authority for a replacement, and the qualification licensing authority shall publish information in official website. " (Original: If an engineering cost consulting enterprise loses its qualification certificate, it shall declare it invalid in the public media and apply to the qualification licensing authority for a replacement. The "50 million yuan" in the third paragraph of Article 19 is amended as "200 million yuan". (Original: Grade B engineering cost consulting enterprises can engage in engineering cost consulting business of various construction projects with engineering cost below 50 million yuan) Articles 23 and 24 are deleted. (Original: Article 23 Where an engineering cost consulting enterprise establishes a branch, it shall, within 30 days from the date of obtaining the business license of the branch, submit the following materials to the competent construction department of the people's government of the province, autonomous region or municipality directly under the Central Government where the branch is located in industrial and commercial registration for the record: (1) A copy of the business license of the branch; (two) a copy of the qualification certificate of the engineering cost consulting enterprise; (3) Copies of the registration certificates of not less than 3 registered cost engineers who intend to practice in the branch; (4) Lease contract or property right certificate of the fixed office space of the branch. The competent construction departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall, within 20 days from the date of accepting the record, report to the competent construction department of the State Council for the record. Article 24 When a branch engages in engineering cost consulting business, the engineering cost consulting enterprise that established the branch shall be responsible for undertaking engineering cost consulting business, concluding engineering cost consulting contracts and issuing engineering cost achievement documents. Branches may not undertake engineering cost consulting business, conclude engineering cost consulting contracts and issue engineering cost achievement documents in their own names. Article 40 is renumbered as Article 38 and amended as: "In violation of the provisions of Article 23 of these Measures, if businesses undertaken across provinces, autonomous regions and municipalities directly under the Central Government are not filed, the competent department of housing and urban construction of the local people's government at or above the county level or the relevant professional department shall give a warning and order it to make corrections within a time limit; If it is not corrected within the time limit, it may be fined between 5,000 yuan and 20,000 yuan. " (Original: In case of any of the following acts, the competent construction department of the local people's government at or above the county level or the relevant professional department shall give a warning and order it to make corrections within a time limit; If no correction is made within the time limit, a fine ranging from 5,000 yuan to 20,000 yuan may be imposed: (1) Failing to file a new branch in violation of the provisions of Article 23 of these Measures; (two) in violation of the provisions of Article 25 of these measures, the business undertaken across provinces, autonomous regions and municipalities directly under the Central Government is not put on record) Article 41 is changed to Article 39, and Article 27 is changed to Article 25. Delete article 44. (Original: Article 44 The provisions of Item (2) and Item (6) of Article 9 and Item (1) and Item (5) of Article 10 of these Measures shall not apply to the units that have obtained the qualification of project cost consultation before the implementation of these Measures and have not yet been restructured. 2. Article 3 of the Administrative Measures for Registered Cost Engineers (DecreeNo. 150 of the Ministry of Construction, as amended by Decree No.32 of the Ministry of Housing and Urban-Rural Development) is amended as: "The term" registered cost engineers "as mentioned in these Measures refers to professionals who have obtained the professional qualification certificate of cost engineers through the professional qualification examination for cost engineers majoring in civil construction or installation engineering, or passed the qualification identification and mutual recognition, and are registered in accordance with these Measures. Registered cost engineers are divided into first-class registered cost engineers and second-class registered cost engineers. " (original: article 3? The term "registered cost engineer" as mentioned in these Measures refers to a professional who has passed the national unified examination for the qualification of cost engineers or qualification recognition and mutual recognition, obtained the qualification of cost engineers in China and China (hereinafter referred to as the qualification), registered in accordance with these Measures, and obtained the registered practice certificate (hereinafter referred to as the registration certificate) and practice seal of cost engineers in China and China, and engaged in engineering cost activities. Personnel who have not obtained the registration certificate and practicing seal shall not engage in project cost activities in the name of a registered cost engineer. Article 4 is amended as: "The competent department of housing and urban-rural construction in the State Council implements unified supervision and management of the registration and practice activities of national registered cost engineers, is responsible for the registration of national first-class registered cost engineers, and is responsible for establishing a unified national registered cost engineer registration information management platform; Relevant professional departments in the State Council shall, in accordance with the division of responsibilities stipulated by the State Council, supervise the practice activities of registered cost engineers in this industry. "The competent departments of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall supervise and manage the practice activities of registered cost engineers within their respective administrative areas, and implement the registration of second-class registered cost engineers within their respective administrative areas." (original: article 4? The competent department of housing and urban construction in the State Council implements unified supervision and management of the registration and practice activities of national registered cost engineers; The State Council railway, transportation, water conservancy, information industry and other relevant departments shall, in accordance with the division of responsibilities stipulated by the State Council, supervise and manage the registration and practice activities of relevant professional registered cost engineers. The competent departments of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall supervise and manage the registration and practice activities of registered cost engineers within their respective administrative areas. ) The "professional qualification" in Article 6 and Article 7 is amended as "professional qualification". Article 12 in Item 3 of Article 7 is amended as Article 13. Article 8 is amended as: "A person who meets the registration requirements may submit application materials to the competent department of housing and urban-rural construction of the people's government of the province, autonomous region or municipality directly under the Central Government where the employing unit is located or to the relevant professional department of the State Council. "To apply for the initial registration of a first-class registered cost engineer, the competent department of housing and urban construction of the people's government of a province, autonomous region or municipality directly under the Central Government or the relevant professional department of the State Council shall report the application materials to the competent department of housing and urban construction of the State Council within 5 days. The competent department of housing and urban construction in the State Council shall, after receiving the application materials, make a decision on whether to accept it according to law and issue a certificate; If the application materials are incomplete or inconsistent with the statutory form, the applicant shall be informed of all the contents that need to be corrected at one time within 5 days. Fails to inform, since the date of receipt of the application materials is accepted. The competent department of housing and urban construction in the State Council shall make a decision within 20 days from the date of acceptance. "After receiving the application materials, the competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall make a decision on whether to accept the application according to law and issue a certificate; If the application materials are incomplete or inconsistent with the statutory form, the applicant shall be informed of all the contents that need to be corrected at one time within 5 days. Fails to inform, since the date of receipt of the application materials is accepted. The competent departments of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall make a decision within 20 days from the date of acceptance. "After receiving the application materials, the competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government or the relevant professional departments in the State Council shall report the application materials to the competent department of housing and urban construction in the State Council within 5 days, and the competent department of housing and urban construction in the State Council shall make a decision within 10 days from the date of acceptance. "To apply for the second-class registered cost engineer to change the registration or renew the registration, the competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall make a decision within 10 days from the date of acceptance. "The initial, change and renewal registration of registered cost engineers shall be declared, accepted and approved online through the unified national registered cost engineer registration information management platform." (original: article 8? A person who has obtained the qualification to apply for registration may submit application materials to the competent department of housing and urban-rural construction of the people's government of the province, autonomous region or municipality directly under the Central Government where the employing unit is located or to the relevant professional department of the State Council. The competent department of housing and urban construction in the State Council shall, after receiving the application materials, make a decision on whether to accept it according to law and issue a certificate; If the application materials are incomplete or inconsistent with the statutory form, the applicant shall be informed of all the contents that need to be corrected at one time within 5 days. Fails to inform, since the date of receipt of the application materials is accepted. To apply for initial registration, the competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government or the relevant professional departments in the State Council shall, after receiving the application materials, submit all the application materials to the competent department of housing and urban construction of the State Council (hereinafter referred to as the registration authority) within 5 days, and the registration authority shall make a decision within 20 days from the date of acceptance. To apply for change of registration or renewal of registration, the competent department of housing and urban construction of the people's government of a province, autonomous region or municipality directly under the Central Government or the relevant professional department of the State Council shall, after receiving the application materials, submit all the application materials to the registration authority within 5 days, and the registration authority shall make a decision within 10 days from the date of acceptance. The initial registration, change and renewal of registered cost engineers will be gradually implemented through online declaration, acceptance and approval. Article 14 is renumbered as Article 9 and amended as: "Where registration is granted, the competent department of housing and urban-rural construction of the State Council or the competent department of housing and urban-rural construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government (hereinafter referred to as the registration authority) shall issue the registration certificate of the registered cost engineer, and the registered cost engineer shall make his own practicing seal according to the regulations. "The registration certificate and the practicing seal are the practicing certificates of the registered cost engineer, which are kept and used by the registered cost engineer himself. The style and coding rules of the registration certificate and practicing seal shall be uniformly formulated by the competent department of housing and urban construction in the State Council. "A registered cost engineer registration certificate printed by the competent department of housing and urban construction in the State Council; The registration certificate of two-level registered cost engineer shall be printed by the competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government in accordance with the regulations. "If a registered cost engineer loses his registration certificate, he shall apply for a replacement in accordance with the continuation registration procedures stipulated in Article 8 of these Measures, and the registration authority shall publish information in official website." (Original: Article 14? If registration is granted, the registration authority shall issue the registration certificate and practicing seal. The registration certificate and practicing seal are the practicing certificates of the registered cost engineer, and shall be kept and used by the registered cost engineer himself. The registration certificate of cost engineer shall be uniformly printed by the registration authority. If a registered cost engineer loses his registration certificate and practicing seal, he shall, after declaring it invalid in the public media, apply for a replacement in accordance with the procedures specified in the first and third paragraphs of Article 8 of these Measures. Article 9 is renumbered as Article 10 and amended as: "A person who has obtained a vocational qualification certificate may apply for initial registration within 1 year from the date when the vocational qualification certificate is issued. Applicants who fail to apply within the time limit must meet the requirements of continuing education before applying for initial registration. The initial registration is valid for 4 years. "To apply for initial registration, the following materials shall be submitted:" (1) an application form for initial registration; "(two) occupation qualification certificate and identity documents; "(three) the labor contract signed with the employing unit; "(4) If a person who has obtained a vocational qualification certificate applies for initial registration 1 year after the issuance of the qualification certificate, he shall provide a certificate of continuing education in that year; "(5) Foreigners shall provide employment permit certificates for foreigners. "When applying for initial registration, the cost engineer himself and the unit shall make a commitment to the following matters, which shall be investigated and verified by the registration authority:" (1) being employed in the post of project cost; "(2) The employing unit has paid social basic old-age insurance for it or has retired." (Original: Article 9? Persons who have obtained the qualification certificate may apply for initial registration within 1 year from the date of issuance of the qualification certificate. Applicants who fail to apply within the time limit must meet the requirements of continuing education before applying for initial registration. The initial registration is valid for 4 years. To apply for initial registration, the following materials shall be submitted: (1) an application form for initial registration; (two) a copy of the qualification certificate and identity certificate; (three) a copy of the labor contract signed with the employing unit; (four) the work certificate of the project cost post; (five) the person who has obtained the qualification certificate shall provide the certificate of continuing education if he applies for initial registration 1 year after the issuance of the qualification certificate; (six) employed by an intermediary agency with engineering cost consulting qualification, it shall provide a copy of the social basic old-age insurance certificate and the personnel agency contract paid by the employing unit, or a copy of the retirement certificate issued by the labor and personnel departments; (seven) foreigners, Taiwan, Hong Kong and Macao personnel shall provide a copy of the employment permit certificate of foreigners and the employment certificate of Taiwan, Hong Kong and Macao personnel. Article 10 is changed to Article 11, and item 3 of paragraph 2 is amended as: "Labor contract signed with the employing unit". (Original: (3) A copy of the labor contract signed with the employing unit; ) Delete item 4 of paragraph 2. (Original: (4) Proof of work performance during the previous registration period; One paragraph is added as the third paragraph: "When applying for renewal of registration, the cost engineer himself and the unit shall make a commitment to the work performance of his previous registration, which shall be investigated and verified by the registration authority." Article 11 is renumbered as Article 12 and amended as: "If a registered cost engineer changes his practice unit within the validity period of registration, he shall terminate the labor contract with the original employing unit and obtain a new employment form according to the procedures specified in Article 8 of these Measures? The competent department of housing and urban construction of the people's government of the province, autonomous region or municipality directly under the Central Government where industrial and commercial registration is located or the relevant professional department of the State Council shall go through the formalities of change of registration. Continue the validity of the original registration after the change of registration. "To apply for change of registration, the following materials shall be submitted:" (1) an application form for change of registration; "(2) Registration certificate; "(three) the labor contract signed with the new employer. "When applying for change of registration, the cost engineer himself and the unit shall make a commitment to the following matters, which shall be investigated and verified by the registration authority:" (1) terminate the labor contract with the original employer; "(2) The employing unit has paid social basic old-age insurance for it or has retired." (original: article 11? Within the validity period of registration, if a registered cost engineer changes his practice unit, he shall terminate the labor contract with the original employing unit and go through the formalities for changing the registration in accordance with the procedures specified in Article 8 of these Measures. Continue the validity of the original registration after the change of registration. To apply for change of registration, the following materials shall be submitted: (1) an application form for change of registration; (2) Registration certificate; (three) a copy of the labor contract signed with the new employer; (four) documents certifying the termination of the labor contract with the original employer; (five) employed by an intermediary agency with engineering cost consulting qualification, it shall provide a copy of the social basic old-age insurance certificate and the personnel agency contract paid by the employing unit, or a copy of the retirement certificate issued by the labor and personnel departments; (six) foreigners, Taiwan, Hong Kong and Macao personnel shall provide a copy of the employment permit certificate of foreigners and the employment certificate of Taiwan, Hong Kong and Macao personnel. Article 13 is renumbered as Article 14 and amended as: "If the registration is cancelled or refused, and the registration is re-applied after the registration conditions are met, it shall be handled in accordance with the procedures specified in Article 8 of these Measures." (Original: Article 13? If the registration is cancelled or not registered, and the applicant reapplies for registration after meeting the registration requirements, it shall be handled in accordance with the procedures specified in the first and second paragraphs of Article 8 of these Measures. ) Article 15 is amended as: "The practice scope of the first-class registered cost engineer includes project cost management and project cost consultation in the whole process of construction projects, and the specific work contents are as follows:" (1) Project proposal and feasibility study investment? Estimation and audit, project evaluation cost analysis; "(two) the construction project design budget, construction budget preparation and audit; "(three) the preparation and audit of the quantities and costs of the bidding documents for construction projects; "(four) the preparation and management of the contract price, settlement price and final settlement price of construction projects; "(five) cost appraisal in construction project audit, arbitration, litigation and insurance, and mediation of project cost disputes; "(six) the compilation and management of construction project valuation basis and cost index; "(seven) other matters related to project cost management. "The second-class registered cost engineer assists the first-class registered cost engineer to carry out relevant work, and can independently carry out the following work:" (1) Analysis, planning, organization and cost management of construction engineering materials, preparation of construction drawing budget and design budget estimate; "(two) the construction bill of quantities, the highest bid price, tender offer; "(3) Compilation of contract price, settlement price and final settlement price of construction projects." (Original: Article 15? The practice scope of certified cost engineer includes: (1) preparation and review of construction project proposal, feasibility study investment estimate, project economic evaluation, preparation and review of project estimate, budget, settlement and final settlement; (two) the preparation and review of bill of quantities, pre-tender estimate (or control price), tender offer, the signing of project contract price and the calculation of change and adjustment, project payment and project claim cost; (three) in the process of construction project management, the optimization of design scheme, quota design and other engineering cost analysis and control, and the verification of engineering insurance claims; (4) Identification of engineering economic disputes. Item 2 of Article 16 is amended as: "Engaged in engineering cost business according to law". (Original: Article 16? A registered cost engineer enjoys the following rights: (1) Use the name of the registered cost engineer; (two) the independent implementation of the project cost business according to law; (three) sign and affix the practicing seal to the project cost achievement document formed in my practice activities; (four) initiated the establishment of engineering cost consulting enterprises; (five) keeping and using my registration certificate and practicing seal; (six) to participate in continuing education. ) Article 18 is amended as: "Registered cost engineer? According to the scope of practice, I will sign and affix the practicing seal on the project cost achievement document formed by myself, and bear the corresponding legal responsibilities. The final project cost achievement document shall be reviewed and signed by the first-class registered cost engineer. " (Original: Article 18? The registered cost engineer shall sign and seal the project cost achievement document undertaken by himself. ) One item is added to Article 20 as Item 9: "Practising beyond the scope of practice and registered professional scope". (Original: Article 20? A registered cost engineer shall not commit the following acts: (1) failing to perform the obligations of a registered cost engineer; (two) in the course of practicing, asking for bribes, accepting bribes or seeking other benefits other than those stipulated in the contract; (three) the implementation of commercial bribery in the course of practice; (four) signed a false record, misleading statement of the project cost documents; (five) to undertake the project cost business in the name of an individual; (six) allow others to engage in engineering cost business in their own name; (seven) practicing in two or more units at the same time; (8) Altering, reselling, leasing, lending or otherwise illegally transferring the registration certificate or practicing seal; (nine) other acts prohibited by laws, regulations and rules. Article 22 is amended as: "Registered cost engineers should adapt to the needs of their posts and the requirements of their career development, receive continuing education in accordance with the relevant provisions of the state on continuing education for professional and technical personnel, update their professional knowledge and improve their professional level." (Original: Article 22? Registered cost engineers shall meet the requirements of continuing education stipulated by the registration authority within each registration period. The continuing education of registered cost engineers is divided into compulsory courses and elective courses, and each registration is valid for 60 hours. After continuing education to meet the eligibility criteria, a certificate of continuing education will be issued. The continuing education of registered cost engineers shall be organized by China Construction Engineering Cost Management Association. ) The "registration authority" in Article 24 is amended as "the competent department of housing and urban construction in the State Council". (Original: Article 24? The registration authority shall inform the competent department of housing and urban-rural construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government and the relevant professional departments of the State Council. The competent departments of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall inform the competent departments of housing and urban construction of the people's governments of cities and counties within their respective administrative areas of the registered information of cost engineers. Article 39 is amended as: "The professional qualification examination for cost engineers shall be conducted in accordance with the relevant regulations of the competent department of human resources and social security of the State Council." (Original: Article 39? The qualification examination for cost engineers shall be carried out in accordance with the relevant provisions of the competent personnel department of the State Council. In addition, the serial numbers of relevant articles shall be adjusted accordingly. This decision shall come into force as of the date of promulgation. The regulations of the above two departments shall be revised accordingly according to this decision and re-promulgated. The difference between the above 2020 version of the management measures for engineering cost consulting enterprises and the 20 15 version, I hope the answer will be helpful to you.