Construction projects that use World Bank loans must be recruited when they reach the prescribed scale standards.
Yes The bidding and purchasing of World Bank loan projects must use the standard bidding documents (SBD) formulated by the World Bank, and the applicable laws are stipulated in the bidding documents of specific loan projects. If the project management and the procurement of equipment and materials related to engineering construction meet the prescribed standards, bidding must be conducted.