How to write the situation report template? Many on-the-job white-collar office workers don't know how to write a report or how to format it. When the boss of the company gives you this task, you have to ask people or Baidu everywhere. Here are some information related to the report template that I have compiled for your reference!
Situation report 1
Title, including the reason and the name of the official document.
The receiving organ or competent leader mentioned in the preceding paragraph.
The text and structure are the same as those of general official documents. In terms of content, the report should include three parts: information, explanation and conclusion, in which information cannot be omitted; Views should be based on three parts: basis, explanation and hypothesis, in which views and assumptions cannot be omitted. From a formal point of view, a little more complicated should be the separation of head, body and tail. At the beginning, introductions and questions are usually used to give a general idea or attract attention. The subject can be divided.
Subtitle or stripe sequence code.
Finally, you can expect it, predict it, or omit it, but the conclusion can't be saved.
Please note the following when reporting:
The situation is conclusive, the viewpoint is clear, the thinking is clear, and the tone is appropriate. Do not include instructions.
Pay attention to the conclusion:
When submitting the report, you should write "If there is nothing wrong with the above report, please forward it to all localities for reference." Finally, specify the issuing authority and date.
Error-prone areas in the report
There is a conclusion at the end of 1., which should be removed, because words have neither practical meaning nor structural function. If it is written as "If the above report is negative, please give instructions", it is even more wrong, because, as mentioned above, reporting is a language that does not require a superior to answer, so even if it is useless to negotiate, the superior will not answer you.
In the same way, it is also nonsense to add notes to the report indicating "contact person" and "contact telephone number". Thirdly, writing a report should avoid being too long and should generally be controlled within 3000 words.
Situation report 2 I. Concept of work report
Work report, also known as work report, situation report or situation report, is a document that lower-level enterprises, institutions and organizations state their work to higher-level units or competent departments. The work report is mainly used to reflect the work progress, major issues and the implementation of policies and decrees or the completion of tasks assigned by superiors or competent departments. It is an important means for superiors or competent departments to understand the work of their own units and strive for support and help.
Second, the writing method of the work report
A work report generally consists of title, caption, title, text, conclusion, signature and date.
(1) title. Write the title in the middle of the first line. The title usually adopts the mode of "unit name+time ten reporting items+work report", such as "XX annual water administration work report of XX County Water Resources Bureau".
(2) Mark under the heading. The second line is marked under the middle heading to indicate the name and date of the issuing unit, and the date is enclosed in brackets. If the title already contains the company name, it can be omitted here. What is marked under the title can sometimes be marked at the end of the article.
(3) appellation. The third line, the title is written at the top, that is, the target of the report. Appellations can sometimes be omitted.
(4) the text. The text of a work report usually includes the following aspects:
1) General description and guidance. That is, whether the problem to be reported is assigned by the superior, or a major responsibility event or work progress, here is a brief summary. Then, it is introduced into the text with leading words such as "Now report the situation as follows". Some work reports omit this general explanation and guidance.
(2) The main body of the text. According to the nature of the work report, state the facts, analyze the reasons and take corresponding measures. When describing facts, state time, place, people and events; Accurately analyze the reasons; Explain that the measures of this unit should be realistic.
(3) the end. Usually, the specific requirements of the unit are briefly put forward according to the contents of the report. Report the results, you can ask for rewards to the relevant personnel; If it is a work mistake, you may be required to be punished. Later, it often ends with something like "I hereby report".
(6) Signature and date. If the topic is not marked, the name and reporting time of the informant should be signed at the lower right of the text.
Three. Matters needing attention in writing work report
First, the most important thing in writing a work report is seeking truth from facts, not exaggerating or lying. Second, the narrative should be concise and clear, and clear-cut, without too much embellishment. Third, the work report can be sent to the superior unit in the form of administrative documents, or it can not be sent; It can be a written report or an oral report.
Situation report 3 comrades:
This meeting is a very important meeting held by Dayuan Company at a new historical starting point, thoroughly implementing the spirit of the Party and the Third and Fourth Plenary Sessions of the 18th CPC Central Committee, and aiming at realizing the overall development strategy of the group company. The main tasks of this meeting are: summing up the work in xx years, analyzing the current and future situation and tasks, deploying the work in xx years, mobilizing the broad masses of cadres and workers to seize opportunities, work hard, actively grasp and actively adapt to the new normal, constantly improve the quality and efficiency of development, further strengthen their beliefs, forge ahead, and work hard to promote the rapid development of Dayuan Company's strategic adjustment.
Next, I will make a work report to the conference.
The first part is a review of the work in xx years.
In xx years, faced with the complicated, ups and downs and difficult business situation, Dayuan Company, under the correct leadership of the gas department and under the guidance of the scientific decision-making and supervision of the board of directors, adhered to management as the core, firmly grasped the development opportunities, seized the market opportunities in time, adjusted its business strategy in time, strived to improve its business situation and strive to build its independent core competitiveness in the LNG industry in the province.
(a) the safety work to maintain a stable situation.
In xx years, the safety production remained stable, and there were no fatal accidents, major casualty-free accidents and safety accidents that caused significant social adverse effects. The main work is as follows:
In the management of gas filling stations, more than 30 safety inspection forms, such as the Summary of HSE Production Inspection of Gas Filling Stations, were established, 37 regular safety inspections and irregular spot checks were conducted at each station, 3 1 problem was found, 7 rectification notices were issued, and all the rectification measures and methods put forward were put in place; Prepare emergency plans for accidents such as gas station leakage, frostbite, fire and explosion, and organize regular drills to improve the safety management process of gas stations and ensure the safe operation of gas stations. In terms of project management, we have signed HSE management contracts with all construction units to ensure the safety of the construction process. The first, second and third-level construction work ticket system for hot work, ground breaking, electric power, high altitude and limited space in the station has been compiled and strictly implemented, and the safety management system has been continuously improved, and the safety standardization management system has been established and improved. In terms of education and training, we will increase the training and education of all staff in safety management knowledge, safety operation procedures, safety operation skills and special operations, and strive to improve the safety quality of all staff. Organized 20 people to participate in the qualification certificate training for hazardous chemicals business held by the Provincial Administration of Work Safety, and all passed the examination and obtained relevant certificates, which played a guarantee role in standardizing the management of safety production according to law and promoting the safe, orderly and stable development of the company.
(II) Completion of major economic indicators
As of June 65438+February 3 1 day, Dayuan's total assets were 4 1886 1 ten thousand yuan, a year-on-year decrease of 3,895,200 yuan or 8.51%; Total liabilities were 6,762,300 yuan, an increase of 4,955,900 yuan or 274.34%. Operating income 18398000 yuan, an increase of 1305 18000 yuan, an increase of 244.13%; Operating cost is 65,438 yuan+0,680 yuan, 830 yuan, increasing by 65,438 yuan+0,465,438 yuan+0,886 yuan, increasing by 5,465,438 yuan+0.62%; Total profit-6,473,800 yuan.
Sales: The company has put into operation five gas filling stations, with a cumulative sales volume of 3,962.35 tons, with a cumulative sales volume of 3,402.77 tons in 14, including: the sales volume of Xinzhou Baode LNG filling station 18 17.83 tons; The sales volume of Yangquan Yin Ying LNG filling station is 920 tons; Pingding LNG filling station sold 536.93 tons of gas; The sales volume of Wutai Shizui LNG filling station is 5 1.36 tons; The sales volume of Taijiu high-speed LNG filling station is 76.65 tons. Trade work, the total trade volume is 374.28 tons.
(3) Project progress and project construction
Since its establishment, the company has been working hard around the planning, site selection and construction of gas filling stations. Xx years accumulated investment of 4.9269 million yuan, and gradually improve the relevant procedures of Baode Station and Yinying Station. Strategically arranged favorable station-building positions on Taijiu and Shizui expressway, which promoted the station-building of Yangquan, Lvliang and Qingxu.
The company is building Yangquan Taijiu LNG filling station and Qingxu Qingyuan LNG filling station. At present, the preliminary procedures such as the preliminary work letter have been obtained, and the "three links and one leveling" project is under way. The design unit, construction unit and equipment manufacturer have all completed the bidding. At the same time, on the premise of ensuring the progress and quality of the project, the supporting project of Baode Qiaotou LNG filling station was completed.
Establish rules and regulations. The company has issued nine project management systems, including Project Management Responsibility System, which standardized the construction management of gas filling stations. Maintain the equipment of each station regularly, and contact the equipment manufacturer to measure the vacuum degree of the storage tanks of two filling stations in Yangquan. Evacuate the unqualified storage tanks again, purchase, replace and repair the damaged facilities on the station in time to ensure the safe and normal operation of each gas filling station. Organize relevant personnel to participate in the training of LNG filling stations organized by the Provincial Housing and Construction Bureau and explain and study the provisions of the new version of Code for Design and Construction of Automobile Filling Stations organized by the China Gas Association, and obtain relevant certificates to enhance employees' business knowledge and professional technical level.
(d) Trade initiation, the real procurement link.
In order to promote the orderly development of trade, Dayuan Company pays special attention to the procurement of gas sources. Through the analysis and comparison of the production, operation and sales of the surrounding liquefaction plants, the field investigation, investigation and business negotiation are carried out in a targeted manner. In addition to signing cooperation agreements with Ningxia Hanas Energy Development Co., Ltd., Shaanxi Zhongyuan Green Energy and Natural Gas Co., Ltd. and Xinao Energy Trading Co., Ltd., it also signed new cooperation agreements with Ningxia Haoyuxiang Trading Co., Ltd., Jiangsu Haohai Energy Technology Co., Ltd. and Yulin Huachen Clean Energy Co., Ltd.
Price is the sensitive focus of purchasing activities. According to the established purchasing plan, the company obtains quotations through multiple channels, grasps the market pulse in real time, and determines the purchasing price through price comparison and negotiation. Adhere to the principle of "the right price, the right quality, the right time, the right quantity and the right place", and rationally purchase gas sources, so as to reduce operating costs and improve operating quality.
(V) LNG logistics and distribution business has obtained relevant qualifications, and has done a good job in the preliminary work, providing sufficient gas source guarantee for the operation of Dayuan Company's gas filling station, minimizing the procurement cost of gas source, and at the same time cooperating with the gas sector company to build the entire LNG industry chain of Jinneng Gas Group. After investigating the LNG market, Dayuan Company established a subsidiary in Yangquan City on April 1 xx, specializing in LNG logistics and distribution business, and obtained a dangerous goods transportation license on April 10 of the same year. The company has purchased five LNG transport tankers, and the relevant organizations, department settings, business process design, personnel selection and other work have all been put in place, making full preparations for the development of LNG logistics and distribution business.
(6) Marketing has achieved initial results.
In view of the lack of self-owned gas filling stations, Dayuan Company actively carried out marketing work to win customers around and attract passing vehicles to refuel. According to the customer's situation, implement market segmentation strategy, focus on key users, and implement "bundling strategy" and "fixed-point refueling" schemes. In xx years, the company signed cooperation agreements with 13 companies such as Shanxi sanyuanchang trading co., ltd. ..
(seven) solid progress in management.
According to the Code for Design and Construction of Automobile Filling Stations, Emergency Plan for LNG Filling Stations and other related materials, the company issued the Operation and Management Manual for LNG Filling Stations of Dayuan New Energy Co., Ltd. of Shanxi Coal Transportation and Marketing Group, covering 22 related regulations such as equipment use, dangerous and harmful factors of process facilities, post responsibilities and service management, standardizing the process of liquid filling and unloading and accident handling, and ensuring the institutionalization and scientificity of filling station management.
Earnestly implement 20 specific measures of "increasing revenue and reducing expenditure, improving quality and increasing efficiency" of the group company. From the strengthening of internal cough, the doctor wrote it down and gave an injection. There were five people at first. In terms of management cost control, we increased the control of business entertainment expenses, which decreased by 99,600 yuan compared with the same period of last year; Strengthen the management of bus costs, and reasonably reduce the costs of fuel and vehicle maintenance on the premise of ensuring normal work.
(8) Party building work was further strengthened.
1. Since its establishment, under the leadership of the Party Committee of the Communist Youth League, the Party branch has focused on site construction, safe operation, increasing income and creating profits, rallying teams and boosting morale, and played the role of the Party organization as a fighting fortress and the vanguard and exemplary role of the Party. At the beginning of xx, the members of the branch changed, the work objectives were determined, and the party building work in enterprises was strengthened. At present, the company has 67 employees, including party member 12.
2. Activities are conducted in an orderly manner.
According to the requirements of the provincial party committee and the group party committee, the Party branch of Dayuan Company timely carried out the party's mass line education and practice activities, implemented eight regulations and anti-four winds activities, and studied and discussed the implementation activities. Hold a staff meeting before the activity to convey the spirit of the activity, mobilize and read out the implementation plan of the activity, so that the contents of the activity can be implemented.
3. Carefully organize the democratic life meeting.
In xx years, the company held many democratic life meetings. At the meeting, according to the company's development plan and the actual situation of various departments, party member cadres frankly put forward targeted and pertinent opinions and suggestions on the problems and shortcomings of the company's leadership team members, the problems existing in the company's development and the next step plan, which really played a positive role in holding a good democratic life meeting and broadened the ideas for the company's next development. Summing up the work of the past year, the achievements are hard-won. Here, on behalf of Dayuan Company, I would like to express my heartfelt thanks and sincere respect to all the cadres and employees who have worked hard in the past year!
While seeing the achievements, we also clearly see the existing problems and shortcomings. First, the profit base is still not solid. The loss is still large, the marketing ability of enterprises is still far behind that of companies in the same industry, and some major economic indicators still have room for improvement. Second, the project has insufficient stamina. The large investment and insufficient borrowing capacity of the gas filling station project will seriously restrict the company's sustainable development. Third, the management level of enterprises needs to be further strengthened. At present, the management methods and means of the company are relatively extensive, and the management and control ability, coordination and cooperation ability, execution, work quality and efficiency in the work need to be improved urgently. Fourth, the construction of corporate culture lacks pragmatic methods and measures. All these difficulties and problems need to be solved with great efforts.
The second part is the working idea and goal of xx years.
Xx is a crucial year to implement the development plan of the gas industry of the Group Company and promote the development of the Company. It is also the first year for Dayuan Company to implement the new strategy to carry out LNG logistics and distribution business, and it is also an important year to improve the company's management level, realize a fundamental turning point in the business situation and lay a solid foundation.
The general idea of Dayuan Company's work in xx year: conscientiously implement the spirit of the Party and the Third and Fourth Plenary Sessions of the 18th CPC Central Committee, take the overall development strategy of the Group Company as the goal, take safe production as the basis, take funds as the guarantee, strictly manage the budget, further improve the management level, focus on grasping the historical opportunity of the transformation and development of the Group's business station to a gas station, improve the LNG industry supply chain integrating procurement, logistics distribution and sales, take the market as the guide, grasp the information in time, and build the core competitiveness of the enterprise.
In xx, Dayuan Company's overall working goal: to sell 24,000 tons of LNG (6,000 tons of gas filling stations, trading volume18,000 tons), totaling 33.6 million cubic meters of natural gas; Achieve operating income of113.877 million yuan (gas station operating income of 29.465 million yuan, trade income of 76.932 million yuan, tanker transportation income of 7.48 million yuan), and strive to turn losses into profits in xx.
The third part is the key work in xx years.
In order to fully accomplish the objectives and tasks for xx years, we will focus on the following eight aspects.
(1) Strengthen the awareness of red line and implement the supervision of production safety. First, strengthen the safety inspection of filling stations, and conduct regular safety inspections and irregular spot checks on each station. The inspection contents include the standardization, timeliness and accuracy of the safety checklist, the violation of rules and regulations in the station, and the standardization of safety facilities, personnel operation procedures and clothing in the station. Rectify the problems found within a time limit, and strengthen the evaluation of major safety hazards to ensure the safe and stable operation of the filling station. Second, strengthen the engineering safety inspection, focusing on the company's station construction plan in xx years, do a good job in safety education for the construction unit in time, and ensure that all the construction personnel who enter the site receive the three-level safety education before entering the site, and complete the special safety technical disclosure such as hot work, electricity consumption and high altitude before the construction of each major. Sign the HSE management contract for the project construction of the construction unit with the construction unit, reserve the safety risk of mortgage according to the regulations, realize the parallel safety assessment and construction, and ensure that no safety accidents occur during the construction. The third is to strengthen the safety education and training of all employees of the company and effectively improve the safety quality. Make training plans for xx Company and each station, conduct induction training for new employees, and organize special lectures on safety production expertise; Organize regular technical training and competitions to cultivate technical backbones and improve the overall professional and technical level of gas station employees; Strengthen the use and maintenance of personal protective equipment, major hazards and accident emergency plan training. At the same time, it is also necessary to strengthen the standardization construction of the company, promote the management of safety production, and strengthen the unification and standardization of signs at various stations. The fourth is to strengthen the safety management of logistics fleet. As a new business of the company, logistics distribution has high requirements for safety management due to the characteristics of dangerous chemicals transportation. In the next step, we will strengthen the supervision on the way, find out the route errors and abnormal driving in the process of vehicle driving in time, and find and stop drivers from drunk driving, fatigue driving, running red lights, banning road driving and speeding in time. Strengthen the safety education and training for transport drivers, and strengthen the safety awareness of drivers.
(2) Pay close attention to the examination and approval procedures and speed up the project construction.
1. Project approval and reserve
The approval procedure of LNG project involves three levels: province, city and county, which is difficult and time-consuming. Only by firmly grasping the key link of project approval procedure can we ensure the completion of the annual project construction goal. In accordance with the project formalities approval scheme, strict assessment, responsibility to the people, and gradually improve the preliminary procedures of the three new filling stations, to ensure that all the approval procedures of Baode Qiaotou Station and Yangquan Yinying Station are completed on time in the first half of the year.
Seize the great historical opportunity of the Group's transformation and development, conscientiously implement the unified strategic deployment of the Group relying on the gas sector, and accelerate the work of transforming the business station into a gas station. Dayuan Company will actively contact Jinneng Logistics Co., Ltd., Jinneng Gas Bureau and related cities and counties, and strive to make breakthroughs in the transformation of Jinzhong, Changzhi, Lvliang, Linfen and Shuozhou during the year, and promote the work through various cooperation modes such as equity participation, holding and joining, so as to maximize the use of superior resources and achieve mutual benefit and common development.
2. Site construction
Continue to improve the company's gas station network layout. The network layout of filling stations is also an important value of the company. According to the funds and customers, the company will steadily lay out the operation sites and lines, and finally form its own network.
Therefore, the company plans to build three LNG filling stations in xx, with an estimated total investment of 33.8 million yuan, including Taiyuan Qingxu Qingyuan LNG filling station14.32 million yuan, Yangquan Pingding Suoquan LNG filling station 9.59 million yuan and Lvliang Sok Li Corner LNG filling station 9.89 million yuan, all of which are cooperative filling stations.
In the pre-approval stage of the new site, we will gradually improve the issuance of the construction blueprint of the gas filling station project and the bidding of equipment and construction units to ensure that the construction tasks of each station can be completed on time with good quality and quantity.
Do a good job in equipment maintenance service on the job site. According to the characteristics of the equipment, set up a special spare parts warehouse, reserve the vulnerable parts that need to be specially made in advance, ensure the safe and normal operation of each station, and escort the sales task next year.
(3) Continue to do real trade procurement.
Procurement is the starting point of LNG trade logistics activities and plays an important role in enterprise production and LNG industry supply chain.
First, strengthen effective communication with upstream suppliers to ensure that they can know their own production situation and market conditions in real time, and monitor and master prices in real time.
The second is to ensure high quality and low price. On the premise of ensuring the quality of gas source, reduce the procurement cost and strive to be lower than the ex-factory price of 50- 100 yuan/ton.
The procurement cost of gas source is the main and core part of the company's cost control, which directly affects the LNG sales pricing and profit of the company. Good procurement can directly increase the company's profit and value, not only ensure the rapid and efficient use of operating funds, but also give consideration to risk control, effectively reduce the risk of funds and win the market competitive advantage.
Third, it is necessary to assign special personnel to upstream suppliers, keep a close eye on and bind more than three large-scale gas source procurement bases, gradually establish a supplier evaluation system, and focus on making breakthroughs in the field of coal-based natural gas procurement.
Upstream procurement will be based on LNG manufacturers in Erdos, Inner Mongolia, radiating from point to area; The downstream LNG filling stations in Hebei and Shanxi will be sold as terminals to gradually strengthen market competitiveness and eventually form the company's own transportation and marketing network. At the same time, in order to cope with the price fluctuation in different regions and channels, Yangquan Company will give priority to inland gas, supplemented by imported LNG, and take into account the sea gas in Caofeidian, Tianjin, Qingdao and other regions to carry out trade and transportation, forming a stable trade chain of inland gas and sea gas LNG.
(d) Accelerate the logistics and distribution of liquefied natural gas.
As the main unit of LNG logistics and distribution, Yangquan Company refines the cost control of each link of the logistics line through its own logistics and transportation fleet, minimizes the transportation cost and further increases the profit of the supply chain.
The operation department should actively cooperate with Yangquan Company to provide all kinds of high-quality resources and strive to expand the LNG logistics and distribution business of Yangquan Company. At the same time, we adopt various cooperation ways to establish cooperation with external logistics companies so that social vehicles can also be used by our company.
Safety responsibility is more important than Mount Tai, and the operation of logistics fleet brings new challenges to the company. In terms of logistics lines, we will focus on ensuring the safe and stable operation of Xinjiang lines.
By establishing and perfecting the fleet management organization, formulating the safety education and training plan, enhancing employees' safety awareness, strengthening professional skills, establishing a professional image, improving the professional level of the fleet, realizing institutionalized, standardized and scientific management, building a professional LNG logistics distribution fleet, and further improving the overall profitability of the company.
(5) Actively explore the market and enhance the marketing ability.
Sales is an important link in the supply chain of LNG industry, and efforts should be made to broaden sales channels.
First, through multi-channels, in-depth and all-round, we will further strengthen interaction and communication with existing large customers and strive to improve customer stickiness.
The second is to increase preferential sales promotion, and strive to provide better service to customers through various forms of sales promotion activities, so as to achieve the purpose of improving service quality, and then drive the sales of gas stations to increase.
The third is to seize the opportunity, expand the downstream market of coal-to-gas in Inner Mongolia, develop downstream customers solidly, and vigorously seize high-quality customer resources.
Fourth, scientifically formulate a flexible pricing mechanism, realize information interaction in the same industry, give consideration to profit and competition, and formulate a perfect competitive strategy on the premise of ensuring profit, so as to drive the increase of sales of gas filling stations.
In view of the recent continuous downward adjustment of domestic diesel price and the narrowing of oil-gas price difference, the promotion and replacement of LNG heavy-duty vehicles are slow. The company will give full play to the supply chain advantages of LNG industry, except its own stations, wholesale sales to major sales places, set up special personnel and posts, build enterprise brand advantages based on providing quality services, benchmark the practices of other gas companies, explore new trade methods, and strive to achieve breakthroughs in civil gas.
In a word, the company will change the extensive management and sales model of filling stations in xx. With the competition between filling stations gradually evolving into supply chain competition, only with a more scientific, reasonable and complete supply chain can we build the company's core competitiveness and remain invincible in the fierce market competition.
(6) Strengthen performance appraisal and improve management level. By improving assessment methods, enriching assessment contents, standardizing assessment procedures, and increasing rewards and punishments, we can give full play to the incentive and guiding role of performance appraisal and continuously improve the management level of the company.
On the one hand, improve the assessment methods and improve the scientificity of target responsibility assessment. Adhere to the combination of qualitative and quantitative assessment, scientifically match the target project value according to the main and secondary, key and general, short-term and long-term contents of the target responsibility book, increase the quantitative assessment, and quantify the assessment as much as possible; It is difficult to quantify the work, first qualitative evaluation, then evaluation, and so on. Turn abstraction into concreteness, and improve the scientificity of evaluation.
On the other hand, strengthen the application of achievements and establish a mechanism of upgrading and demotion. Adhere to the results of performance appraisal linked to employees' salary, and commend outstanding performance appraisal. Those who are assessed as incompetent will be punished according to the investigation. Gradually improve and optimize the organization and management of the company, establish a mechanism of selecting and employing people with "those who are capable are superior, those who are equal are inferior and those who are inferior are eliminated", create a pragmatic, pioneering and innovative employment environment, promote the development, management and rational allocation of the company's human resources, and further improve the overall management level of the company.
(VII) Actively expanding financing channels and accelerating the rapid development of project construction companies cannot be separated from the support and guarantee of funds. In order to speed up the project construction, the company plans to raise 30 million yuan in various ways in xx.
First, relying on the group company to apply for an entrusted loan of 654.38+million yuan, we have asked the gas department for instructions and are following up the relevant follow-up work. At the same time, actively negotiate with a number of banks to establish a credit system and improve the financing level.
The second is to raise 20 million yuan through financial leasing. Financial leasing is mainly based on fixed assets and intangible assets, most of which are advanced equipment with high technology content. By signing a contract with the lessor, paying the rent according to the regulations and obtaining the right to use related assets, it not only meets the medium and long-term capital demand, but also meets the needs of production and operation, which is helpful to improve the competitiveness and economic benefits of the company.
The third is to increase capital and share. According to market trends and enterprise needs, we will promote the acquisition of high-quality assets in an orderly manner, actively integrate resources, and optimize the company's shareholding structure.
(8) Strengthen Party building in an all-round way, and constantly improve the support capacity.
First, strengthen the building of a clean and honest party style. By organizing special study and counseling lectures, we will thoroughly study and implement the work requirements of higher-level party committees and the spirit of a series of important speeches, continue to promote the construction of learning-oriented party organizations, and always maintain its advanced nature and purity.
The second is to strengthen the construction of cadres. Further deepen the reform of cadre personnel, labor and employment and income distribution system, optimize and improve the working mechanism of selecting and employing people, control mode, incentive and restraint, talent training, and strive to build a cadre talent team with reasonable structure and complete echelon.
The third is to strengthen the construction of leading bodies and play the role of fighting bastion. Only under the leadership of excellent leading bodies can enterprises be invincible in the fierce market competition and achieve good economic benefits. Strengthening the market control ability of leading group members will also be an important work of organizational construction this year. The fourth is to improve the construction of grassroots units and places. We will carry out the activities of "striving for Excellence", give play to the vanguard role of grassroots party member, and implement the activities of creating "vanguard workers" and "civilized youth posts" to form a good pattern of "one branch with one flag, one party member with one lamp".
Comrades! The overall thinking and task objectives of this year's work have been clearly defined, and the work is very arduous and the responsibility is great. In accordance with the unified deployment and requirements of the group company, relying on the cohesion of the leading group with the chairman as the core and the execution of the broad masses of cadres and workers, we should optimize the industrial layout, build the core competitiveness of the LNG industry supply chain, seize new opportunities, enhance new impetus, create new achievements, and write a new chapter in the rapid development of Dayuan strategic adjustment with excellent results.