The project to be declared should be the one planned to be implemented in 20 14 years (including new construction or under construction), and some progress can be made during the year (completion of infrastructure construction, three links and one leveling of main factory building, completion of main equipment orders, etc.). ), and the relevant preliminary procedures such as project establishment, land and environmental assessment must be complete.
Applicable object: energy saving and emission reduction projects
Energy-saving and emission-reduction projects refer to projects that are in line with the key projects of energy-saving and emission-reduction and circular economy in the Twelfth Five-Year Plan for national economic and social development in our city and have a demonstration and driving role.
Special funds for energy conservation are mainly used to support eight key energy-saving projects, such as comprehensive transformation of industrial energy conservation, low-carbon transportation, energy conservation in public institutions, industrialization demonstration of major energy-saving technologies and equipment, and energy-saving products benefiting the people project.
The fund also supports eight key circular economy projects, including comprehensive development and utilization of "urban minerals", demonstration of remanufacturing, resource utilization of agricultural wastes, demonstration of circular service industry, circular transformation of industrial parks, and demonstration of major circular economy technologies.
Related requirements:
Must conform to industrial policy.
The declared project must conform to the national industrial policy and the mandatory standards for planning, environmental protection, land, labor, safety and engineering construction; The main body of the technical transformation project should run for more than 3 years; The net assets of the enterprise shall not be less than the total investment of the project; The technology and technology adopted have reached the domestic advanced level.
The economic and social benefits of the project are remarkable, and it can have stable energy-saving and emission-reduction capacity after completion.
No national, provincial or municipal financial rewards or subsidies were obtained before the project construction content was declared. If you have received relevant financial support before, you must attach the completion acceptance materials of the previous project.
Among the projects that meet the above conditions, priority is given to provincial and municipal key projects, and key projects and key equipment in industrial clusters are manufactured by enterprises in our city.
Award standard: up to 2 million yuan per year.
The reporter learned that the reward standard for the declared project is: industrial energy-saving comprehensive transformation project, calculated according to each saving 1 ton standard coal reward 150 yuan; Demonstration projects such as building energy conservation, low-carbon transportation, major energy-saving technologies and equipment industrialization will be subsidized according to the actual loan situation of the project.
● Energy saving projects of municipal public institutions
Give full subsidies to all financial institutions, and the proportion of subsidy funds to other financial supply units shall not exceed 30% of the total project investment.
● Energy saving products
If the products are listed in the national promotion catalogue of energy-saving products benefiting the people, the production enterprises will be given a one-time reward of 654.38+10,000 yuan.
● Key projects for comprehensive utilization of circular economy resources
Discount according to the actual loan situation of the project.
● Greenhouse gas emission reduction projects
50 yuan will be rewarded for every reduction of 1 ton of CO2 equivalent.
It is worth noting that the annual reward (discount interest and subsidy) of each independent legal entity shall not exceed 1, and the amount of reward (discount interest and subsidy) shall not exceed 2 million yuan in principle.
Declaration time: before 20 13 1 1.00.
The registered place of the enterprise applying for the project should be within the administrative area of this Municipality, with independent legal personality, bank reputation above AA level, strong comprehensive strength, good economic benefits in the past three years, asset-liability ratio not exceeding 70%, good social and commercial reputation, sound financial and accounting system, and no illegal acts in the past three years.
All reporting enterprises are required to submit their reporting materials to the Operation Department of Project Service and Economic Development Bureau of High-tech Zone before 1 10 this year.