Huaneng Dandong Power Plant has 288 full-time employees, including 239 with college education or above, accounting for 82.99% of the total employees, and senior and intermediate professional technicians 1, 7 1, accounting for 59.38% of the total employees.
Huaneng Dandong Power Plant is jointly built by Huaneng International Power Co., Ltd., Liaoning Province, Northeast Electric Power Group Corporation and Dandong City, with a planned capacity of 2600MW, which will be completed in three phases. The first phase of the project started with the approval of the State Council in March 2007, with the number of 1997. The construction scale is to install two 350MW imported coal-fired units with a designed annual power generation of 4.2 billion kWh, which were all completed and put into operation on 1998.
The equipment and main materials of two 350MW units in the first phase of Huaneng Dandong Power Plant have been approved by the state as foreign investment projects, 85% of which are export credits and 65,438+05% are commercial loans. The main equipment, turbine motor, is provided by Westinghouse, and the boiler is provided by Babko, UK. The conceptual design and external interface of the municipality directly under the Central Government are undertaken by Northeast Electric Power Design Institute.
Huaneng Dandong Power Plant consumes about 2.2 million tons of coal annually, which is supplied by Zhungeer Coal Mine in Inner Mongolia, transported to Qinhuangdao via Daqin Line, and then transported by sea to the special coal terminal of Dadonggang Power Plant. The boiler make-up water of the power plant is taken from Tiejia Reservoir, which is about 24 kilometers away from the power plant. Seawater is used as circulating cooling water, and Tang Wei Beach is used as ash storage yard. The first phase of the project is connected to the power system by 220 kV four-loop outlet.
Huaneng Dandong Power Plant is the largest investment project in Dandong's history and will play an important role in Dandong's economy. Dandong is located at the end of the northeast power grid and lacks the capacity of thermal power base load. The completion and commissioning of Huaneng Dandong Power Plant has not only become the supporting point of the Northeast Power Grid, but also played an important role in the safe and stable operation of the regional power grid, as well as in revitalizing the economy of Dandong and Liaoning and speeding up the opening up.
Mr. Zheng Ke, born in June 1956, is a senior engineer with a college degree. He has served as the chief biotechnology officer, deputy chief engineer, chief engineer, deputy director and director of Shandong Xindian Power Plant, and the first deputy director of Huaneng Dezhou Power Plant. In June 2003, he served as the director of Huaneng Dandong Power Plant. Information category: proposed project
Industry: energy and chemical industry, environmental protection
Location: Liaoning
Progress stage: under construction stage
Latest progress stage: construction in progress
Project overview: Two sets of flue gas desulfurization systems for 350MW units will be built in the first phase of the project, with a total investment of 654.38+500 million yuan.
Details:
Project Name: Huaneng Dandong Power Plant Desulfurization Reconstruction Project
Progress stage: Construction in progress.
Construction period: 2008-2009
Main equipment: desulfurization equipment, denitration equipment, dust removal equipment, demister, sludge dewatering system equipment, wastewater treatment system equipment, absorption tower, agitator, limestone unloading and conveying system, gypsum silo unloading scraper, and bypass baffle door.
Project Overview: The total investment of flue gas desulfurization system for two 350MW units in the first phase of Dandong Power Plant is 654.38+500 million yuan. Limestone-gypsum wet flue gas desulfurization process is adopted, and one furnace and one tower are designed. The device is located on the south side of the chimney of the power plant. The whole project will be completed and put into use by the end of May 2009.
Investor profile: Huaneng Dandong Power Plant is a key project of the country and province during the Ninth Five-Year Plan period, and it is also the only newly-built project of Huaneng International Power Development Co., Ltd. during the Ninth Five-Year Plan period. Huaneng Dandong Power Plant is a regional condensing large-scale port thermal power plant, which is located about 40 kilometers in downtown Dandong and 4.5 kilometers southwest of donggang city, adjacent to Dadong Port.
Construction unit: Huaneng Dandong Power Plant
Postal Address: donggang city Development Zone, Liaoning Province
Postal code: 1 18300
Design unit: Northeast Electric Power Design Institute of China Electric Power Consulting Group.
Postal address: No.4368 Renmin Street, Changchun City, Jilin Province.
Postal code: 13002 1 Huaneng Dandong Power Plant Control Room
Huaneng Dandong Power Plant Phase II Project: September 28, 2009
Information category: VIP project
Industry: energy and chemical industries
Location: Liaoning
Progress stage: preliminary design stage
Latest development stage: preliminary design
Project Overview: Two 600,000 kW generator sets will be built in this project.
Project Name: Huaneng Dandong Power Plant Phase II Project
Progress stage: preliminary design
Duration: 2010/month-20 10 1 month.
Main equipment: boilers, instruments, meters, automatic control systems, pumps, valves, desulfurization equipment and dust removal equipment.
Project Description: The project is located in Donggang Development Zone, Dandong City, Liaoning Province, with a newly-built power plant and two 600,000-kilowatt generator sets, covering an area of 200,000 square meters and a factory building.
The total investment of the project is 500 million yuan.