Current location - Loan Platform Complete Network - Loan consultation - Huaneng Dandong Power Plant Huaneng
Huaneng Dandong Power Plant Huaneng
Huaneng Dandong Power Plant Huaneng Dalian Power Plant Huaneng Shang 'an Power Plant Huaneng Dezhou Power Plant Huaneng Weihai Power Plant Huaneng Jining Power Plant Huaneng Rizhao Power Plant Huaneng Taicang Power Plant Huaneng Huaiyin Power Plant Huaneng Nanjing Power Plant Huaneng Nantong Power Plant Huaneng Shanghai Shidongkou First Power Plant Huaneng Changxing Power Plant Huaneng Fuzhou Power Plant Huaneng Shantou Coal-fired Power Plant Huaneng Shantou Gas Turbine Plant China Huaneng Yuhuan Power Plant Huaneng Qinbei Power Plant Huaneng Yushe Power Plant Huaneng Xindian Power Plant Huaneng Chongqing Branch Huaneng. Jinggangshan Power Plant Huaneng Pingliang Power Plant Huaneng Yueyang Power Plant Huaneng Yingkou Power Plant Huaneng Hanfeng Power Plant Huaneng Suzhou Thermal Power Plant Huaneng Dandong Power Plant has played a very important role in strengthening the strength of Northeast Power Grid and promoting the economic construction of Dandong in Liaoning Province.

Huaneng Dandong Power Plant has 288 full-time employees, including 239 with college education or above, accounting for 82.99% of the total employees, and senior and intermediate professional technicians 1, 7 1, accounting for 59.38% of the total employees.

Huaneng Dandong Power Plant is jointly built by Huaneng International Power Co., Ltd., Liaoning Province, Northeast Electric Power Group Corporation and Dandong City, with a planned capacity of 2600MW, which will be completed in three phases. The first phase of the project started with the approval of the State Council in March 2007, with the number of 1997. The construction scale is to install two 350MW imported coal-fired units with a designed annual power generation of 4.2 billion kWh, which were all completed and put into operation on 1998.

The equipment and main materials of two 350MW units in the first phase of Huaneng Dandong Power Plant have been approved by the state as foreign investment projects, 85% of which are export credits and 65,438+05% are commercial loans. The main equipment, turbine motor, is provided by Westinghouse, and the boiler is provided by Babko, UK. The conceptual design and external interface of the municipality directly under the Central Government are undertaken by Northeast Electric Power Design Institute.

Huaneng Dandong Power Plant consumes about 2.2 million tons of coal annually, which is supplied by Zhungeer Coal Mine in Inner Mongolia, transported to Qinhuangdao via Daqin Line, and then transported by sea to the special coal terminal of Dadonggang Power Plant. The boiler make-up water of the power plant is taken from Tiejia Reservoir, which is about 24 kilometers away from the power plant. Seawater is used as circulating cooling water, and Tang Wei Beach is used as ash storage yard. The first phase of the project is connected to the power system by 220 kV four-loop outlet.

Huaneng Dandong Power Plant is the largest investment project in Dandong's history and will play an important role in Dandong's economy. Dandong is located at the end of the northeast power grid and lacks the capacity of thermal power base load. The completion and commissioning of Huaneng Dandong Power Plant has not only become the supporting point of the Northeast Power Grid, but also played an important role in the safe and stable operation of the regional power grid, as well as in revitalizing the economy of Dandong and Liaoning and speeding up the opening up.

Mr. Zheng Ke, born in June 1956, is a senior engineer with a college degree. He has served as the chief biotechnology officer, deputy chief engineer, chief engineer, deputy director and director of Shandong Xindian Power Plant, and the first deputy director of Huaneng Dezhou Power Plant. In June 2003, he served as the director of Huaneng Dandong Power Plant. Information category: proposed project

Industry: energy and chemical industry, environmental protection

Location: Liaoning

Progress stage: under construction stage

Latest progress stage: construction in progress

Project overview: Two sets of flue gas desulfurization systems for 350MW units will be built in the first phase of the project, with a total investment of 654.38+500 million yuan.

Details:

Project Name: Huaneng Dandong Power Plant Desulfurization Reconstruction Project

Progress stage: Construction in progress.

Construction period: 2008-2009

Main equipment: desulfurization equipment, denitration equipment, dust removal equipment, demister, sludge dewatering system equipment, wastewater treatment system equipment, absorption tower, agitator, limestone unloading and conveying system, gypsum silo unloading scraper, and bypass baffle door.

Project Overview: The total investment of flue gas desulfurization system for two 350MW units in the first phase of Dandong Power Plant is 654.38+500 million yuan. Limestone-gypsum wet flue gas desulfurization process is adopted, and one furnace and one tower are designed. The device is located on the south side of the chimney of the power plant. The whole project will be completed and put into use by the end of May 2009.

Investor profile: Huaneng Dandong Power Plant is a key project of the country and province during the Ninth Five-Year Plan period, and it is also the only newly-built project of Huaneng International Power Development Co., Ltd. during the Ninth Five-Year Plan period. Huaneng Dandong Power Plant is a regional condensing large-scale port thermal power plant, which is located about 40 kilometers in downtown Dandong and 4.5 kilometers southwest of donggang city, adjacent to Dadong Port.

Construction unit: Huaneng Dandong Power Plant

Postal Address: donggang city Development Zone, Liaoning Province

Postal code: 1 18300

Design unit: Northeast Electric Power Design Institute of China Electric Power Consulting Group.

Postal address: No.4368 Renmin Street, Changchun City, Jilin Province.

Postal code: 13002 1 Huaneng Dandong Power Plant Control Room

Huaneng Dandong Power Plant Phase II Project: September 28, 2009

Information category: VIP project

Industry: energy and chemical industries

Location: Liaoning

Progress stage: preliminary design stage

Latest development stage: preliminary design

Project Overview: Two 600,000 kW generator sets will be built in this project.

Project Name: Huaneng Dandong Power Plant Phase II Project

Progress stage: preliminary design

Duration: 2010/month-20 10 1 month.

Main equipment: boilers, instruments, meters, automatic control systems, pumps, valves, desulfurization equipment and dust removal equipment.

Project Description: The project is located in Donggang Development Zone, Dandong City, Liaoning Province, with a newly-built power plant and two 600,000-kilowatt generator sets, covering an area of 200,000 square meters and a factory building.

The total investment of the project is 500 million yuan.