Current location - Loan Platform Complete Network - Loan consultation - Simple samples of renovation contract [5 articles]
Simple samples of renovation contract [5 articles]
Calculate how much it will cost to decorate your home.

Renovation contract simple sample 1:

Client (Party A): Contact: (Party A) Contact: (Party B) Contact: (Party A) Contact: (Party B)

Organizer (Party B): Contact: (Party B): Contact: (Party B) Contact: (Party B)

After friendly negotiation, Party A decided to entrust Party B to lay floor tiles and wall tiles, and signed this agreement for mutual compliance.

I. Project Location: Room _ _ _ _

Two. Form and structure: _ _ _ _ structure (structure) Form (structure)

Third, the project:

1, four rooms (two bedrooms and two living rooms) are paved with _ _ _ _ _ _ _ tiles, and corner lines are laid, which are required to be flat; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If the details are not covered, Party A shall propose a plan and discuss it.

4. Contracting method: Party A must ensure the materials needed during the decoration period (Party B shall inform Party A in advance) and the lunch supply during the construction period according to Party B's requirements, and Party B shall be responsible for the construction.

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same building type recognized by both parties. After the project is completed and accepted, if there are quality problems in Party B's construction within 3 months, Party B shall be responsible for rework and maintenance for free.

Engineering cost of intransitive verbs: materials are provided by Party A, and Party A pays Party B the labor cost of decoration.

Seven. Payment method: In order to ensure the quality of the project, the deposit of RMB is withheld temporarily, and the deposit will be fully returned to Party B on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. After the completion of the project, if it meets the above-mentioned construction projects and design requirements after acceptance by Party A, Party B shall be paid labor costs within three days.

Eight. Entry into force of the contract: this agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into force as of the date of signature by both parties.

Signature (Seal) of Party A: _ _ _ _ Signature (Seal) of Party B: _

Date of signing the contract: (year, month and day).

Renovation contract simple sample 2:

Party A: (hereinafter referred to as Party A) ID number: (hereinafter referred to as Party A) ID number: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B) ID number: (hereinafter referred to as Party B) ID number: (hereinafter referred to as Party B)

In order to complete this project, Party A originally contracted this project to Party B for about square meters, and both parties signed this agreement based on the principles of equality, mutual benefit, consensus, equality, voluntariness, fairness and good faith, and combined with the specific conditions of this project.

I. Project Name: (1) Project Name: (2) Project Name: (1) Project Name

Two. Project address: (1) Project address: (2) Project address: (1) Project address

Three. Building area: about _ _ _ _ square meters.

Four. Contracting method: engineering and material contracting.

5. Project cost: RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Duration of the intransitive verb contract: the total number of days is _ _ _ _ _ _ _ _ _ _, counting from the date when Party A notifies the commencement. Delay due to force majeure.

Seven. Nature of the project: (1) (2) (3).

Eight, the final accounts of both parties are based on the actual acceptance of both parties.

9. Party B is responsible for the stress testing work and expenses of the materials needed for the project, and Party A shall coordinate and cooperate with the test data and submit them to Party A for unified management.

X. Specific requirements in construction

1. quality requirements: the quality of this project is subject to the signature and seal of the state and the project owner, the specific requirements of Party A, and the standard acceptance of the project owner, supervision company and relevant functional departments.

2. Safety responsibility: During the construction, Party B shall carry out the construction in strict accordance with relevant national standards and safety technologies, so as to achieve civilized construction, clean and tidy site and perfect and appropriate safety measures. During the construction, Party B shall be responsible for all safety accidents within the scope of its contract.

3. Estimation and payment method: The estimation is based on the actual quantities collected by Party A and Party B on site. After signing this agreement, Party B shall pay RMB Yuan only.

4. Time limit requirements: Due to the tight time limit and heavy tasks of this project, Party B must carry out the construction in strict accordance with the requirements of Party A's construction progress, and shall not stop work or delay the construction period under any excuse. In case of the above situation, it is a breach of contract, and Party B shall pay _ _ _% of the total project cost to Party A as liquidated damages, and Party A has the right to terminate this agreement, and all its losses shall be borne by Party B.. ..

XI。 When signing this agreement, Party B shall pay a performance bond of RMB to Party A.

Twelve. Liability for breach of contract: If one party breaches the contract, the breaching party shall compensate the other party for all losses caused.

13. Matters not covered in this agreement shall be settled by both parties through negotiation. This Agreement is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A (signature/seal): _ _ _ _ Party B (signature/seal): _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Renovation contract simple sample 3:

Client (Party A): Contractor (Party B):

After friendly negotiation, Party A decides to entrust Party B to decorate the house, and hereby signs this agreement for mutual compliance.

First, the project site:

Two. Decoration time: from _ _ _ _ _

Third, the project:

1, three bedrooms (two bedrooms and one living room), one kitchen, one bathroom and one balcony, with a total construction area of 100 m2. The walls of all rooms were painted with latex paint three times according to the requirements of construction specifications. The brands of latex paint should be Nippon and Dulux, the walls must be three times putty, and the walls and floors of kitchen, bathroom and balcony are all ceramic tiles. Waterways for bathrooms and kitchens need to be made according to Party A's requirements. Toilets and kitchens must be waterproof, and all bedrooms, living rooms and dining rooms should be covered with wooden floors. Party A shall provide wood floors and tiles, and Party B shall be responsible for other materials and labor.

2. If the details are not covered, Party A shall propose a plan and discuss it.

4. Contracting method: Party B must guarantee auxiliary materials (sand, cement, etc.). ) according to the requirements of the reconstruction budget, and is responsible for the construction.

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same building type recognized by both parties. After the project is completed and accepted, if there are quality problems in Party B's construction within 3 months, Party B shall be responsible for rework and maintenance for free.

6. Project cost: The total decoration amount is: 20,000 yuan only. Materials and decoration expenses shall be provided by Party B in advance, and paid by Party A according to the total decoration amount after acceptance.

Seven. This agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into force as of the date of signature by both parties.

Party A: Party B:

Signature (seal): Signature (seal):

Tel: Tel:

Year month day.

Renovation contract simple sample four:

Employer (Party A): _ _ _ _ _ _

Employer (Party B): _ _ _ _ _ _

Party A owns a commercial house in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B shall design the decoration of the Commodity House according to Party A's requirements (with copies of relevant drawings and project budget).

I. Project name:

Interior decoration and hydropower engineering.

Two. Construction site: (1) Construction site: (2) Construction site: (1) Construction site: (2) Construction site

Third, the project content and quantity:

This project belongs to the form of contract work and materials. Construction projects shall be subject to the items in the budget table. If there are any omissions or additions in the construction, the project payment shall be settled according to the actual number of settlement items.

Four, the total project cost:

According to the drawings and the project budget, Party A and Party B tentatively agree that the total project cost is about _ _ _ _ _ _ ten thousand yuan (in words: _ _ _ _ _ Jacky (the project cost does not include tax; The decoration project payment shall be calculated according to the final settlement quantity. )

Verb (abbreviation for verb) Terms of payment:

Party A shall pay Party B (project security deposit) 30% of the total project amount (RMB) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Six, the construction period:

It shall be completed within _ _ _ _ _ _ days from the date when Party A pays the project deposit and turns on the water and electricity. If Party A changes the design scheme, the project payment is not in place, Party A's material supply is not timely, or in case of force majeure factors such as typhoon, rainstorm and fire, the construction period will be postponed.

Seven, warranty period:

The warranty period is years. During the warranty period, if the quality of the project is damaged, Party B shall guarantee it for free. After the project is completed and accepted by Party A, sign it? Project handover report and quality warranty agreement? (In case of man-made damage or natural disasters, it is not covered by the warranty).

Eight, responsibility:

(1) Party A shall be responsible for the failure to complete the construction period and the loss of materials and labor caused by Party A's modification of drawings or change of construction scheme. If Party B changes the construction plan without the consent of Party A, the losses caused thereby shall be borne by Party B ... The change of the construction plan shall be subject to the change signed by both parties.

(2) Party A shall provide a site with construction conditions and water and electricity interfaces (the water and electricity expenses shall be borne by Party A and the construction equipment shall be borne by Party B) to eliminate the obstacles affecting Party B's construction. And be responsible for handling all kinds of applications and approvals involved in the construction (the expenses shall be borne by Party A).

(3) Party B shall designate the person in charge of construction. Without the consent of Party A, Party B shall not frequently change the main management personnel and technical personnel. Ensure the construction safety and fire safety, and Party B shall be responsible for the accident losses caused by Party B. ..

(4) Party A shall be responsible for the losses caused by the construction quality problems caused by the materials purchased by Party A..

(5) Without the acceptance confirmation of both parties, Party A shall not enter the site, otherwise it will be deemed that Party A has passed the acceptance, and Party B will only perform the warranty responsibility for Party A.. ..

(6) Items with acceptance criteria (water and electricity, muddy water, carpentry and plastering)

Nine. This contract is made in duplicate, one for each party. This agreement shall come into effect after being signed by both parties, and shall be automatically terminated after all projects are settled.

Party A: _ _ _ _ Party B: _ _ _ Party A: _ _ _ _ Party B: _ _ _ _ Party B: _ _ _

Signatory: Signatory:

Tel: Tel:

Date of signing: Date of signing:

Renovation contract simple sample five:

Client (Party A): Contact: (Party A) Contact: (Party B) Contact: (Party A) Contact: (Party B)

Organizer (Party B): Contact: (Party B): Contact: (Party B) Contact: (Party B)

After friendly negotiation, Party A decided to entrust Party B to lay floor tiles and wall tiles, and signed this agreement for mutual compliance.

I. Project Location: _ _ _ _ Project Location: _ _ _ Project Location: _ _ Project Location: _ _ Project Location.

Two. Formal structure: (1) Formal structure: (2) Formal structure: (1) Formal structure: (2) Formal structure.

Third, the project:

1, Room 3 (2 bedrooms, 1 living room) shall be paved with _ _ _ _ _ _ tiles, and the corner line shall be laid, which shall be smooth; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If the details are not covered, Party A shall propose a plan and discuss it.

4. Contracting method: Party A must ensure the materials needed during the decoration period (Party B shall inform Party A in advance) and the lunch supply during the construction period according to Party B's requirements, and Party B shall be responsible for the construction.

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same building type recognized by both parties. Within _ _ _ _ months after the project completion acceptance, Party B shall be responsible for the free rework and maintenance of quality problems caused by Party B's construction.

Engineering cost of intransitive verbs: materials are provided by Party A, and Party A pays Party B the labor cost of decoration.

Seven. Payment method: In order to ensure the project quality, the deposit is RMB _ _ _ _ _ _. After the completion of the project, if it meets the above-mentioned construction projects and design requirements after acceptance by Party A, Party B shall be paid labor costs within three days.

Eight. Entry into force of the contract: this agreement is made in duplicate, one for each party, with the same effect. This agreement shall come into force as of the date of signature by both parties.

Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Enter the area and get the decoration quotation for free.

Enter the area and get the decoration quotation for free.