Current location - Loan Platform Complete Network - Loan consultation - Expressway built with World Bank loan?
Expressway built with World Bank loan?
Expressway, which was built with the World Bank loan, is Beijing-Tianjin-Tangshan-expressway.

Expressway, Beijing-Tianjin-Tanggu is the first expressway in China to adopt the internationally accepted FIDIC clause for international bidding construction, and has implemented the project management mode of mutual supervision and checks and balances among the constructor, constructor and supervisor.

Brief introduction of Beijing-Tianjin-Tangshan expressway

Beijing-Tianjin-Tanggu expressway is the expressway connecting Beijing, Tianjin and Tanggu. Total length 142.69 km. According to administrative divisions, Beijing is 35km, Hebei is 6.84km, and Tianjin100.85km..

20 10 Beijing Minute Temple-Tianjin Sicundian section of Beijing-Tianjin-Tangshan Expressway became a part of G2 Beijing-Shanghai Expressway, and the name of Tianjin Sicundian-Tianjin Tanggu section remained unchanged, numbered S40. 2065438+On July 9, 2004, the elevated project of the new section of the northern expressway of Beijing-Tianjin-Tanggu was officially started, and the toll station of expressway main line airport in Beijing-Tianjin-Tanggu was severed from Yangcun toll station for ten months.