Other methods can be as you think. First of all, you need to be able to draw a K-line (time-sharing node), and you can draw two graphs, 15 minute K-line graph and 60 minute K-line graph, and 35 and 50 moving averages. At this time, the main picture can only display the 5-minute K-line chart, while the two pictures are 15-minute K-line chart and another 60-minute K-line chart.
In addition, the moving averages on 5 and 15 cannot be the same moving average. For example, 5 minutes is 35, so how to set 15 minutes?
I just want to make some comments. I can't,,,,