Current location - Loan Platform Complete Network - Foreign exchange account opening - Brief introduction of Panshan power plant
Brief introduction of Panshan power plant
Panshan Power Plant is located in Jixian County, Tianjin, 25 km south of Tianjin/KLOC-0, 90km west of Beijing and 75km east of Tangshan. Located in the center of Beijing-Tianjin-Tangshan and the load center of Beijing-Tianjin-Tangshan power grid, it plays an extremely important role in the system.

I. General situation of the enterprise

1, geographical location

Jixian County in Tianjin is located in the heart of Beijing-Tianjin-Hebei, with Cang Xie in the south, Taihang in the west, Jieshi in the east and the Great Wall in the north. It is 88km from Beijing, 220km from Tianjin 1 15km from Chengde and 236km from Qinhuangdao.

2. Traffic conditions

Railways: Beijing-Qinhuangdao and Daqin railways cross the territory, and Tianjin-Jilin railway goes directly to the county seat. Ji-gang Railway runs from Jixian to Tianjin Port, with a total length of 196 km, and is expected to be completed in 2007.

Highway: Jinji Expressway, Jingha, Jinwei, Bangxi, Baoping trunk highway and county and township highways crisscross and extend in all directions.

Second, enterprise development.

1, enterprise history

1996 Datang Tianjin Panshan Power Plant was listed by the State Planning Commission as a pilot project to develop national industries by purchasing domestic power generation equipment with the national foreign exchange reserves.

1998165438+1October 5, the project officially started.

200165438+February 18, and put into production on June 5, 2002.

2, enterprise planning

Two domestic 600,000 kw coal-fired units were installed in the second phase expansion project of Panshan Power Plant, which was jointly invested by Beijing Datang Power Generation Co., Ltd. and Tianjin Jinneng Investment Company. It is a national key project? The main equipment of the unit is a steam turbine? Generator? Boiler equipment and so on are all produced by domestic manufacturers, which is also one of the pilot projects of national industrial development?

Third, the status quo of enterprises

Datang Tianjin Panshan Power Plant is a million kilowatt power plant, which is located in the load center of Beijing-Tianjin-Tangshan power grid and plays an extremely important role in the system. Established by Datang International Power Generation Co., Ltd. and Tianjin Jinneng Investment Company * * *, its two domestic 600,000 kW thermal power units are the largest power generation company in Beijing-Tianjin-Tangshan power grid at present, and they are also important power support points of the power grid.

The investors are Datang International Power Generation Co., Ltd. (75% equity) and Tianjin Jinneng Investment Company (25% equity). The number of existing employees is 199.