Current location - Loan Platform Complete Network - Foreign exchange account opening - G 1 13 train passes by the station.
G 1 13 train passes by the station.
The timetable of G 1 13 high-speed train passes through Beijing South Railway Station, Cangzhou West Railway Station, Dezhou East Railway Station, Jinan West Railway Station, Xuzhou East Railway Station, Chuzhou Railway Station, Nanjing South Railway Station, Changzhou North Railway Station, Wuxi East Railway Station, Suzhou North Railway Station and shanghai hongqiao railway station.

G 1 13 high-speed train from Beijing South Railway Station to Shanghai Hongqiao Railway Station, with a total of 1 1 station, leaving at 08:39 and arriving at 14:59. The whole journey takes about 6 hours and 20 minutes. Among them, Cangzhou West Station, located in Cangzhou City, Hebei Province, China, is a station under the jurisdiction of China Railway Beijing Bureau Group Co., Ltd., and Cangzhou West Station is one of the intermediate stations of Beijing-Shanghai high-speed railway.

Cangzhou West Railway Station covers an area of 9,844 square meters, with a total construction area of over 40,000 square meters and a length of 365 meters from north to south. The bell tower is 60 meters high; The platform column canopy is 420m long, with a height of12m and a clear height of 8m. The square in front of the station covers an area of 80,000 square meters, and the maximum number of people gathered can reach 1200.

Station introduction

The comprehensive building of Cangzhou West Railway Station is connected with the station building, showing the appearance of buildings. The architectural style of the station building complex implies "dancing with two lions" (because Cangzhou is also called "Lion City"). The so-called "double lions" are actually figurative shapes, just like two opposite "Z" characters. At the place where the "Z" characters are connected, a bell tower is supported, and the outer wall is hung by stone and steel, with a glass curtain wall. The square in front of the station.

The whole building of Cangzhou West Railway Station faces east, with the square in front of the station at the east end, the distribution area and landscape area in the middle of the square, the parking area at the north end and the Cangzhou bus station area at the south end. In the center of the square is the comprehensive building of the station building, which has two floors. The northern end of the first floor of the station building is the ticketing hall, and the middle part is the entrance and exit of the station, the passage of the security inspection area, the waiting hall and the luggage room. The southern end is the exit.