Project Completion Acceptance Report (Party A)
Project completion acceptance report
Project name: xxxxxxxxxxxx1# building
Project scale: 33,695 square meters
Project address: xxxxx, Beijing
Structure type: full cast-in-place frame-supported shear wall
Number of floors: 16/-2
Planning PermitNo.: 200 1 Guojinzi xxxx
Construction commencement certificate number. : Shi 00200xxxx (construction)
Registration FormNo. Project Quality Supervision Certificate: Jian Jian Zi (2002)No. xxxx
Commencement date: X, 2002.
Completion date: 2003.
List of units and personnel participating in the final acceptance:
Construction unit: Beijing xxxxxxxx
Project leader: xxxx
Other management personnel: xxxxxxxxxxxxx
Supervision unit: Beijing xxxxx Engineering Supervision Company
Chief supervision engineer: xxx
Other supervisor: xxxxxx
Designer: Beijing xxxx Engineering Design Company
Moderator: xxx
Person in charge of the building: xx
Person in charge of equipment specialty: xxx
Person in charge of electrical specialty: xx
Construction unit: Beijing xxxxx Engineering Construction Co., Ltd.
Project manager: xxx
Person in charge of engineering technology: xxxx
Person in charge of equipment specialty: xxx
Person in charge of electrical specialty: xxxx
The above Sifang units and acceptance personnel who participated in the completion acceptance meet the requirements of Beijing Quality Supervision Station on the completion acceptance record.
The construction unit and supervision unit * * * after receiving the completion report of the construction unit, verify that the project of building XXXXXXXX1# has been fully completed according to the design drawings and the contents of the engineering change negotiation, reaching the agreed contents of the construction contract and meeting the requirements of the completion acceptance of residential projects.
Xxxxxx1# building engineering technology, construction management and building materials, components and equipment in the report and other archives by xxx supervision company comprehensive review, complete and effective archives.
All the functional tests of XXXXXXXX1# building project have been completed, including: sewage pipe passing, heating system monomer and system inhibition test, heating debugging, roof water storage leakage test, primary and secondary water storage leakage test of toilet, lightning protection grounding shaking table test, electric switch and full-load lighting test of lamps and lanterns. After all the above tests are completed, they have been verified and signed by XXX supervision company. The fire protection system passed the acceptance of the Municipal Fire Bureau and issued a fire protection certificate; The elevator passed the acceptance of Beijing Construction Engineering Quality Supervision Station and Labor Bureau, and was awarded the bronze medal in operation.
The project of XXXXXXXX1# building is comprehensively accepted by the construction, design, supervision and construction inspectors, and the procedures and process of acceptance are reviewed and supervised by the Chemical Supervision Station of Beijing General Quality Supervision Station.
The acceptance conclusion is that the project has fully completed the contents agreed in the construction contract, the construction quality conforms to the national standards and norms, and the overall evaluation is qualified.
Beijing xxxxxxxx company
Project leader:
date month year