1, high reliability: the system adopts modular design, and the core components are encapsulated by solid aluminum alloy, which conforms to EMC III standard of electromagnetic compatibility, and the average time between failures reaches 200,000 hours.
2. Ease of use: the system provides an intuitive and easy-to-learn modular configuration method, and the configuration data can directly generate engineering data without maintaining logic diagrams and IO inventory.
3. High degree of intelligence: the system integrates artificial intelligence, big data analysis, cloud computing, model predictive control, three-dimensional monitoring and other technologies to form a brand-new intelligent control system for power plants, and realize safer, more economical and more environmentally friendly operation of power plants.
4. Advanced: The system has passed EU CE and US UL certification, and the repair rate of the whole set of German automatic production line cards is only 0.2%. Huai 'an gas turbine realized the first DCS application of 9F gas turbine in China, and the 9F gas turbines of Jingneng Yuhai and Huadian Huadu were successively implemented. The localization transformation of heavy gas turbine TCS was completed for the first time, and the localization pilot of aviation modified TCS was carried out for the first time.