Current location - Loan Platform Complete Network - Big data management - About the format of the event planner! Font, font size! How are the three things stipulated?
About the format of the event planner! Font, font size! How are the three things stipulated?
Standard planning book electronic format requirements

1. title: official script, initial, bold

2. "Organized by the contractor": official script, small two, bold

3. "Activity overview" "Activity Feasibility Analysis" "Activity Implementation Program" "Funding Budget" and other headings: Chinese new Wei, two bold

4. body part: the body of the text with a small four characters. Song font, 1.5 times spacing.

5. To use the numbering needs to be unified, from large to small as a, (a), 1, (1).

Association of paperwork format specifications:

"Main title": Song, three, bold, centered, two lines below;

"Classification title": Song, four, bold, left-justified, separate line;

"Secondary classification title": Song font, small four, bold, left-aligned, on a separate line;

"Content": Song font, four, not bold, two spaces before the paragraph;

"Paragraph ": Song font, four, not bold, right-aligned, on a separate line;

"Time": Song font, four, not bold, right-aligned, on a separate line;

(All of the above refers to the non-text part)

Paragraph formatting: 1.5 times the spacing;

Header and footer: consistent with this document;

Background and backing: you can design your own, the backing is generally used in this document's icon

Numbering system: the numbering of the use of "one, two, three" "(a), (b), (c)" "1, 2, 3" "(1) (2) (3)" "Ⅰ, Ⅱ, Ⅲ" "A, B, C" "a, b, c" of the hierarchy corresponding to the notation system;

If in order to facilitate the content of the distinction between the different instruments can be adjusted to some extent on their own format.

Remarks:

1, annexes (forms, division of labor, work system, other planning ......)

2, surveys (data, prices ......), more accurate

3, the most important three parts (feasibility analysis, activities, processes and funding budget)

3, the most important three parts (feasibility analysis, activities flow and funding budget)

4, emergencies, solutions, contingency measures

5, alternate programs