Flood control content how to write

Flood control content is written as follows:

1, first of all, write the date of the flood control duty, the name of the duty officer, the duty officer's contact information, weather conditions.

2, secondly, should write whether there is water in each area, material stock checking, whether the rainwater drainage facilities are effective, whether the temporary electricity is safe, whether the flood control emergency personnel are on duty.

3, finally, to summarize the flood control process, the discovery of potential safety hazards and the handling of the situation can be.

Flood control work:

Prevent flood damage during the flood season, to protect the safety of the protection zone. Flood preparations include: training of flood control personnel; inspection of flood control engineering facilities, eliminate hidden dangers; development of flood programs; prepared enough flood control materials; establish a sound flood forecasting and warning system. Flood season work includes: 24-hour flood control duty, timely understanding of meteorological and hydrological conditions, forecasting the water situation, if necessary, to issue an alarm.

Inspecting and guarding the flood control projects, applying all the measures of the flood control system, controlling and dispatching the floods according to the water condition and the project condition as well as the flood control dispatching plan, and immediately rescuing and protecting the flood in case of any danger; when the floods exceeding the standard occur, taking emergency measures (such as splitting the floods and evacuating the residents in the flooded area, etc.) after consulting with the superiors for consent in order to minimize the losses.

Flood season work:

①Mastering water and weather conditions:

Timely release of the temperature, wind, precipitation, snow and ice, water level, tide level, flow and other meteorological and hydrological conditions related to flooding, forecast the possible flood peaks, water increase, flood volume and other water conditions, and if necessary, issue an alert.

② scheduling flood:

Based on the water and engineering conditions, as well as flood control scheduling program, the use of a variety of flood control projects that have been built, flood control scheduling. In the need to use flood, flood storage, flood retention measures, timely and decisive decisions, orders, on time, according to the amount of flood, flood storage.

3 engineering guarding:

Organization of flood control personnel, uninterrupted inspection and defense of embankments, dams, culverts and other projects, timely detection of danger, analysis of the causes, the correct judgment, the preparation of rescue and protection of the program, and the organization of rescue and protection. Below the alert level, generally defended by professionals, beyond the alert level, the organization of flood control personnel defense.

④Emergency Measures:

In case of over-standard flooding, in the event that manpower can not resist, should seek the consent of superiors, according to the approved emergency measures program and the prescribed procedures, the timely implementation of the temporary raking mouth and other emergency flood diversion measures, in order to minimize the damage and avoid the death of people. For the flooded area or may be flooded area residents, transfer and resettlement.