What are the conditions required for the acceptance of construction project planning?
Basis for Approval:

Article 45, Paragraph 1 of the Urban and Rural Planning Law of the People's Republic of China "The competent department of urban and rural planning of the local people's government at or above the county level verifies, in accordance with the provisions of the State Council, whether the construction project conforms to the planning conditions. Without verification or if it is verified that it does not comply with the planning conditions, the construction unit shall not organize the completion and acceptance."

Conditions for Approval:

The construction unit completes all the construction contents in accordance with the requirements of the Planning Permit for Construction Works, the approved construction drawings and the environmental design. Application materials:

(1) application, applicant's qualifications, authorization letter and a basic description of the project (2) "Construction Engineering Planning Permit" copy of 1 (original audit) and attached general plan 1 (3) changes in the construction drawings, the need for "construction engineering planning changes to check the opinion," a copy of 1 (original audit) and attached to the plan of a copy of 1 (4) construction engineering A copy of the environmental design review opinion (original review) and attached 1 (5) a copy of the single acceptance letter (original review) (6) comprehensive as-built measurement data 2 (7) the last session of our review comments and attached drawings.

Go to the local planning bureau to consult, receive a form, with the above content can be organized acceptance