With the progress of society, application forms are more and more widely used in life. The application form is a special letter, bearing our wishes and requirements. So do you know how to write a formal application? The following is my carefully compiled application for 10 project, which is for reference only. Welcome to read it.
Project Application Form1_ _ _ _ _ _ _ _ Project Filing Report
First, the project reason:
Second, the basic situation of the project applicant:
Name of undertaker (unit):
Legal address:
Legal representative:
Registered capital of enterprise:
Brief introduction of the undertaker (unit):
Three. Main contents of the project:
(1) Project name:
(II) Industry attribute of the project:
(3) Product name and production scale:
1.
2.
(4) Total investment of the project:
1. The total investment of the project is RMB _ _ _ _ _. Among them, the investment in civil engineering is _ _ _ _ _ _ yuan, the investment in equipment is _ _ _ _ _ _ yuan, and the others are _ _ _ _ _ _ _ yuan.
2. Sources of funds:
(5) Proposed address of the project construction: land to be requisitioned: _ _ _ _ _ _ _ _
(6) Contents of project construction:
Civil engineering:
Main equipment:
Others:
Fourth, the production process:
Verb (abbreviation for verb) Resource and energy consumption:
(a) the main raw materials and sources:
(2) Electricity:
(3) Water:
(4) Others:
Six, ecological environment impact analysis:
Seven, economic benefit analysis:
(1) Annual output:
(2) Annual sales:
(3) Annual sales profit:
(4) payback period of investment:
Eight, the project schedule:
(Project Applicant) (Seal) Month 2007
Project Application 2 Dear Leader:
Hello!
My name is xxx, female, Han nationality, born in May 1967. ID number:
510525196705046722. I live in No.4 Society, Minle Village, Guanwen Town, Gulin County. Under the background that the country encourages farmers to start their own businesses, I used the funds raised by myself and the money borrowed from relatives and friends (* * totaling more than 50,000 yuan) to build a 130 square yard (brick and wood sheepfold) in 20xx, and prepared to breed mutton sheep. After the completion of the site, more than mu of land of other villagers 10 was leased for planting grass, and the combination of fence and free-range farming was adopted. In recent years, more than 40 sheep/kloc-0 have been successfully bred, and now there are 1 15 sheep on hand.
According to the spirit of the relevant documents of Gulin County Animal Husbandry Bureau, the village leaders came to my house to publicize the spirit of the state supporting farmers' entrepreneurship and seriously explain the economic benefits and prospects of rural aquaculture. This strengthened my confidence in expanding the scale and drove the whole village onto the road of aquaculture development.
Development idea: Re-maintain the old site and build a new site of 100 square meter. Use your own 12 mu of land, and lease about 80 mu of other villagers' land for grass grazing, saving breeding costs and improving economic benefits. It is estimated that the stock is 300-500, and the annual output is 300. The starting capital is about 6.5438+0.5 million yuan.
At present, with the support of national policies, the sales prospects of mutton sheep are promising. I hope that through my own efforts, I will contribute to the local economy and the development of rural areas. If we want to create something in rural aquaculture, it is very difficult for farmers to start their own businesses. Self-employment is our common wish. But because both of our children are in college, we lack funds for expansion. I hope to be recognized and helped by leaders at all levels and government departments in terms of technology and funds. Thank you very much
applicant
time
Part III Project Application Party A: (Brand Company)
Party B: (You) According to the actual situation, on the basis of equal consultation and voluntary mutual understanding, Party A and Party B have reached the following agreement in good faith:
1. Party A and Party B agree to dissolve the xxxx contract and other relevant agreements signed on xx, xx, xxxx. The rights and obligations of Party A and Party B will automatically disappear from the date of termination of this Agreement. Party A and Party B will not pursue the other party's liability for breach of contract in any form.
Second: Party A and Party B agree to bear each other's losses in any form during the conclusion and execution of this contract.
Third: In view of the inability to perform the contract due to changes in objective economic conditions, Party A agrees to refund the deposit paid by Party B in one lump sum on the date of signing this agreement.
Fourth, matters not covered shall be settled by both parties through consultation.
Party A:
party B
Date:
Project Application 4 Nanchang County Party Committee and County Government:
In order to actively respond to the "948" project planning of the Ministry of Agriculture and the construction planning of the ecological economic zone around Poyang Lake in Jiangxi Province, promote the implementation of the agricultural grand strategy of "establishing an ecological province and developing green", promote the sustainable development of ecological agriculture, organic agriculture and low-carbon agriculture in Jiangxi Province, and realize the strategic goal of green ecological Jiangxi. After detailed investigation and study, Nanchang XX Agricultural Co., Ltd. decided to invest150,000 yuan to build the XX high-tech ecological agriculture sightseeing park project in Nanchang County.
Nanchang XX Agricultural Co., Ltd. was incorporated in Hongkong, China, mainly engaged in industrial investment and mergers and acquisitions of modern agriculture. It has a number of internationally advanced agricultural product planting technologies and rich global agricultural product circulation channel resources.
Nanchang XX Agricultural Co., Ltd. will adhere to the tenet of being based in Nanchang, facing the whole province and serving the whole country, and build a high-tech eco-agricultural sightseeing park in Nanchang County with high standards in accordance with the business philosophy of science and technology, ecology, organization, low carbon, high quality, industrialization, marketization and internationalization.
The specific project situation is as follows:
1. Project overview
Name of the proposed project: XX High-tech Ecological Agriculture Sightseeing Park Project in Nanchang County
Project developer: Nanchang XX Agriculture Co., Ltd.
Project proposed location: Nanchang County, Nanchang City, Jiangxi Province
Proposed land acquisition area of the project: 500 mu.
Total planned investment of the project:150,000 yuan.
2. Construction content and scale
Based on the development of eco-agriculture, Eco-agriculture Sightseeing Park aims at creating a beautiful natural environment and producing high-quality green organic agricultural products, and takes the road of agricultural sightseeing and rural leisure and holiday.
On the basis of the eco-tourism park, make full use of the natural landscape of the ecological park, build a landscape complex of "seeing, traveling and living" and "nature-production-leisure-recreation", and develop characteristic modern agriculture combining experience agriculture with sightseeing agriculture.
The project * * * includes five functional areas: pollution-free fruit and vegetable garden, organic tea garden, livestock and poultry breeding area, product processing area and leisure and entertainment area (catering, teahouse, winery and fishing).
3. Project operation mode
3. 1. Establish a production base of green products and build a complete industrial chain of organic fruits and vegetables.
The company will introduce advanced breeding and planting techniques of foreign fruits and vegetables, select excellent varieties of fruits and vegetables for demonstration planting, and adopt the operation mode of "company+farmers" for large-scale expansion. It is estimated that 5,000 farmers will be driven to develop and build 20,000 mu of high-standard organic fruit and vegetable planting base.
In the eco-agricultural sightseeing park, through the development mode of three-dimensional planting and three-dimensional breeding, the mountain resources are comprehensively and efficiently developed, and pollution-free green fruits and vegetables and organic meat of livestock and poultry are provided for the society.
3.2. Combine agriculture with tourism, promote tourism through agriculture and strengthen agriculture through tourism.
The company will give full play to the ecological advantages of our province, adhere to the road of modern ecological agriculture, and fully combine the development of ecological agricultural sightseeing parks with the theme of agricultural leisure sightseeing. Construction of organic tea houses, ecological wineries, green catering, leisure fishing, fruit and vegetable picking, natural oxygen bars and other sightseeing facilities to attract tourists. Feel the nature, taste the original ecology, and build a manor-style ecological agriculture park where man and nature live in harmony.
3.3. Develop a circular eco-agriculture model to achieve large-scale and intensive development.
According to the natural and economic conditions of the project, we choose the manor-style ecological management concept and focus on developing the circular ecological agriculture model. Introduce three-dimensional agricultural planting technology and develop the ecological model of "economic fruit-vegetable-poultry"; Introduce and popularize efficient planting techniques of flowers and fruits, and develop "economic fruit-flowers-aquaculture"; Introduce and popularize three-dimensional ecological aquaculture technology and develop the ecological model of "aquaculture-economic fruit".
4. Project construction conditions
After detailed investigation, discussion and analysis, the company decided to locate the project in Dayi Village, Wuyang Town, Nanchang County, Nanchang City. The natural and traffic conditions in this area are good, only 3 kilometers away from the exit of Jingfu expressway Li Antang, which is rich in agricultural products resources and has a solid agricultural industry foundation.
5. Economic benefits
After the project is completed and enters the normal operation period, it is estimated that the annual operating income can reach 50 million yuan and the annual tax revenue can reach 3 million yuan, which has good economic benefits and profitability.
6. Social welfare
After the completion of this project, a large number of pollution-free green vegetables, fruits, livestock and poultry and aquatic products can be provided to the society every year, which greatly enriches the supply market of agricultural products, creates a large number of employment opportunities for rural surplus labor, increases the fiscal revenue of counties and townships, and effectively promotes the adjustment of agricultural structure.
This project will provide new employment opportunities for the society. According to the preliminary forecast, it will directly increase employment by 300 people, indirectly increase employment by nearly 5,000 people, and increase the economic income of local farmers. At the same time, the implementation of this project will also promote the development of local logistics, animal husbandry, service industry and other related industries, and greatly improve the overall level of the local national economy.
7. Ecological benefits
This project adopts ecological agriculture mode, which will not only produce environmental pollution sources, but also reduce soil erosion, improve soil fertility, improve land use value, protect natural ecological environment, and form an ecological mode of vegetables, aquatic products, biogas and fruits. It can not only produce a large number of high-quality organic fertilizers and biological fertilizers for public vegetable fields, improve the content of soil organic matter, but also produce biogas, which provides fuel sources for demonstration gardens and is conducive to environmental protection.
8. Overall evaluation of the project
Eco-agricultural sightseeing is a new direction of tourism development. On the one hand, it broadens the scope of tourism, adds a new landscape to tourism activities and contributes to ecological protection and environmental optimization. On the other hand, changing the ecological structure of traditional agriculture, optimizing the combination of agricultural economy, opening up new fields of agriculture and land use, strengthening the operating mechanism of self-accumulation and self-development of agriculture, increasing the commodity quantity and added value of agricultural products, and accelerating the transformation of traditional agriculture into modern new agriculture are effective measures to revitalize the rural economy and optimize the agricultural structure. Focusing on the construction of tourism industry and facing the tourism market, we will further guide and promote the organic adjustment of agricultural structure in Nanchang County through the construction of eco-agricultural parks.
Nanchang XX Agricultural Co., Ltd. is determined to develop an eco-agricultural sightseeing park, and set due goals for the implementation of the agricultural strategy of "establishing a province by ecology and developing green". It is to take due responsibility for realizing the grand goal of "accelerating the rise of Jiangxi in the central region and building a well-off society in an all-round way"; It is also a responsibility for the social cause of "building a new socialist countryside and solving the problems of agriculture, countryside and farmers".
The project chooses green and organic fruits and vegetables as the main products, and strategically locates agricultural sightseeing tourism, which is not only in line with the national industrial policy, but also conducive to the development of agricultural industry and the rapid development of enterprise scale in Nanchang County.
The implementation of this project is of great significance for developing modern agriculture, improving the level of agricultural development and accelerating the adjustment of agricultural structure.
To sum up, this project is feasible. I hope the leaders will give support and approve the project.
Nanchang XX agriculture co., ltd
20xx year x month x day
Project application 5xxxxx:
The "xxxx Contract" signed by our company and your company on, the total service fee is RMB xxxx. Our company completed xxx work according to the contract content, and was recognized by xxxxx. Now, according to the relevant contents of the contract, we apply to your company to pay the contract money:
The contract amount is RMB xxx million only, so the payable amount is RMB xxxx yuan only (¥xxxx). Please deal with it. Our company provides the following information about the receiving bank account:
Account name:
Bank of deposit:
Bank account number:
Your company pays according to the above information. If the account information of the receiving bank provided by our company is incorrect, resulting in the payment of relevant funds not in place, then all economic disputes and responsibilities arising therefrom shall be borne by our company. Our company promises to inform your company in time if the account information of the above-mentioned receiving bank changes.
Contact address:
Handler:
Contact telephone number:
QQ email:
Xxxx company
Xxx year, xx month, xx day
Six application forms for the project (be sure to fill them in in detail and truthfully)
I. Reasons for application
(This content indicates a brief introduction of the financing subject, and must indicate the ownership structure of the enterprise and the shareholding ratio of each shareholder. If it is a real estate development enterprise, the qualification grade of real estate development must be indicated. )
(Indicate the reasons for the financing of the enterprise, such as. }
Second, the amount and duration of financing.
(This content indicates the required financing amount and estimated financing period)
Three. Details and valuation of financing collateral
(This content must explain in detail what the "collateral" used in this financing is, whether it is land, buildings or other assets, and must explain the quantity and evaluation value of the collateral. If it is mortgaged land, the land certificate number should be marked; If the house property needs to be mortgaged, the pre-sale certificate number or real estate license number and land certificate number of the house property should be indicated, and whether the land of the mortgaged house property has been mortgaged (for equity financing, the local influence of the financing subject and the present value and expected value of the project under construction should be clarified).
Four. Current actual investment amount and diversion details of the project
(Land payment, project payment, etc. , must be detailed)
Verb (abbreviation for verb) The detailed use of financing
(This content must specify the "specific purpose" of financing in detail, and give a general plan, such as how much the project cost, how much installation, how much debt, etc. The purpose of financing must be true)
Detailed explanation of intransitive verb repayment
(This content should explain in detail the source of funds for users to repay the financing principal and interest, and give the approximate amount and time of each repayment source. If the first-phase residential sales can reach RMB ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××
Seven. Seal and date
Scan after stamping
Date:
Dear Mr. General Manager,
Hello!
I, xxX, joined your company on xX, xx. With the care and support of your and the help of my colleagues, I have gained a lot, broadened my horizons, accumulated experience and benefited for life. However, due to personal reasons, after careful consideration, I decided to resign from my current position and leave your company. The specific reasons are as follows:
First, lack of experience and limited level. My major in landscape architecture is landscaping, but the proportion of landscape architecture in the project is very heavy. I am inexperienced and full of mistakes, so it is difficult for me to be professionally competent in related technical and management work. The construction process proves that I am not a qualified engineer, let alone a qualified project manager, and there are still many things to learn again. Therefore, the position should be filled by more professional, qualified and excellent people.
Second, lack of energy and poor health. Recently, I have lost my appetite, often catch a cold and feel dizzy, and I always feel obviously weak. Even if I get enough sleep, I often doze off during work hours, and my mental state is not good, which affects my work. After the doctor's examination, my liver function is abnormal and I may have hepatitis infection. I suggest getting more rest. I think this makes sense, so I think it's important to keep healthy.
Third, there is an emergency at home and I can't leave. I work alone in Guangzhou, but I have a wife and children to take care of at home. Some troubles have happened recently, and it should take 1-2 months to deal with them. In order not to affect the development of the company's work, I decided to give up my present job and take care of things at home before I can work with peace of mind. I deeply apologize and regret for the inconvenience caused by resignation to the company. At the same time, I thank your company and manager XX for giving me valuable learning opportunities, which I will remember well. I wish all the best and prosperous business!
If I can, I will apply for the last job on xx, xx, and hope to get the salary, subsidy and commission I deserve when I leave. Please approve my application! Thank you very much
Applicant: XXX
XX year XX month XX day
Project Application 8 I am xx, born in Feidong County, and I have been engaged in the home improvement industry for 20 years in Hefei City in _ _ _ _ _ _ _ _ _ _. I love this industry. I am always conscientious, diligent, and study business technology seriously. Now I have entered a decoration company and worked as a project manager with my unique working technology and management technology. This is my first time as a project manager. According to China's "Management Specification for General Contracting of Construction Projects". The project manager responsibility system is a major reform in China's construction project management system, which plays a very important role in strengthening project management and ensuring the realization of project quality, safety, progress and cost. So I have been working hard in the company and doing my best for the development of the company.
At work, I take "do it or do it best" as my motto. I am serious and meticulous about everything. I remember it was in the winter of _ _ _ _ _ _. Considering the cold weather, this painting may not show its due effect. I led all the staff to work overtime in a few sunny days to create the best effect for the landlord. Someone asked me if it was worth it, and I replied, it's my duty. Yes, this is my responsibility, my responsibility to the company, my responsibility to the landlord, and my responsibility to the position of project manager.
In line with the principle of "being patient with others and doing things seriously", I have perfectly completed one task after another assigned by the company. For example, Mr. Shao's home in Amber Garden 10, Mr. Lei's home in 13, Mr. Jiang's home in 20, Miss Bi Shui Wan 1 1, Lily International Mansion, Lanting Tea House, Chunxuantang and Balincan.
With the trust of the company leaders, I will devote myself to the development of the company. I believe that under the correct leadership of the company's leaders and our unremitting efforts, the company's performance will flourish; Our design concept and management mode will be widely known; Our working team will become stronger and stronger.
I hope the leader will approve my application.
Applicant: xx
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project application 9 XXX Administration for Industry and Commerce:
In order to expand new business, our company needs to increase business projects and expand business scope. The original business project of our company is * * * * * * * * * * * *, and we need to increase the business of * * * * * * * first. I hope your bureau can approve it.
I am here to convey
Salute!
Applicant: XX
XXXX,XXXX,XX,XX
Project Application 10 Provincial (municipal) Development and Reform Commission:
Xxx project is located on the xx river, belonging to the xx river basin. The project scale is xxxx and the dam type is xx.
Xx project mainly includes dam hub, spillway, irrigation (water supply) power generation tunnel and other major buildings.
The main tasks of this project are xx, xx.
The preliminary design report, flood control planning report, water intake permit report and soil and water conservation report of the project shall be examined and approved by the provincial water resources department, the environmental impact assessment report (book) shall be examined and approved by the provincial (city, county) environmental protection bureau, and the pre-trial report on reservoir land for construction projects shall be examined and approved by the provincial (city, county) land and resources department (bureau).
The estimated total investment of xxx project is xxxx million yuan.
The xxx project application report has been compiled by xxx engineering consulting unit, and is now submitted for review.
Year, month and day (official seal)
Attachment: xxx project application report
Key words:
Cc:
Attachment:
Xxx project
Xxx engineering consulting company
date month year