The main right of the contractor is the autonomy of operation and management (that is, the right to contract management) enjoyed according to law; The main obligation is to complete the contracted production and operation tasks according to the provisions of the enterprise contract. Below I will bring you the template of construction project contract. For more project contract, please click "Contract Contract".
Construction Project Contract 1
Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the Contract Law of the People's Republic of China and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties have reached an agreement on this project contract.
article 1: general situation of the project
the contracted project of lakeside slope protection project is contracted to party b, and the construction is contracted with materials, and the total length of lakeside slope protection is calculated by meters.
article 2: construction scheme
1, slope protection
(1), the base is meters wide and thick, and the height is meters from bottom to top, and the stressed part needs cold-drawn brick belt, and the external wall needs sand grinding (cement grade is 42.5, and the brick should be of good quality).
(2) Demolish three houses near the toilet for access.
(3) After completion, make a fence about 1m.
(4) The gap between the wall and the bank is tamped with soil, and a proper amount of leaking pipes are added to the wall.
article 3: contract duration
1. it is determined by both parties through consultation that the construction period is days, which is tentatively scheduled from (year) to (year), and the specific commencement time can only be started after party a issues the commencement order.
2. In case of force majeure during construction, or Party A requests Party B to suspend work, the construction period will be postponed accordingly.
article 4: price and payment method
1. the general contract price of the project is RMB.
2. The above-mentioned general contract price is a lump sum price, including all the work contents of this contract, contracting and materials, and all other expenses (including house demolition and fencing), and Party A does not need to pay any more fees to Party B..
3. Payment method: RMB yuan shall be paid after the completion acceptance, and the rest shall be paid in addition to 5% of the total amount of quality guarantee, and the quality guarantee shall be paid after one year (the time shall be calculated from the date of acceptance
Article 5: Obligations of Party A
1. Allocate the project funds to Party B according to the contract.
2. Help to coordinate the temporary water and electricity use in the construction site.
article 6: obligations of party b
1. the contractor is responsible for supervising and inspecting the quality, progress and safety of the project, and handling daily related matters to ensure the safety and stability of the project construction.
2. The contractor must complete the contract project by himself, and shall not subcontract to others.
article 7: construction safety
the contractor shall abide by the relevant management regulations on safety production in engineering construction, organize construction in strict accordance with safety standards, and take necessary safety protection measures to eliminate hidden dangers of accidents. Party B shall bear all the responsibilities and expenses caused by accidents in the construction process.
article 8: acceptance
the project completion acceptance shall be based on the construction plan and the quality acceptance standard. If the acceptance is unqualified, Party B shall be responsible for rework for free.
article 9: liability for breach of contract
1. party a shall pay the project payment in time as agreed in this contract. if it is overdue, party a shall pay the liquidated damages to party b (interest shall be calculated according to the bank loan interest rate of the payable amount for the same period).
2. If Party B fails to complete the project on schedule due to reasons not attributable to Party A or force majeure, Party B shall pay Party A a penalty of 1% of the total amount of the project for each day overdue; If the overdue period exceeds ten days, Party A has the right to unilaterally terminate the contract.
article 1: others
this contract was signed by both parties on, and will come into effect after being signed or sealed by both parties, in duplicate, with one copy held at the top and one copy handed in.
Employer (Party A) (seal)
Authorized agent (signature or seal):
Tel:
Contractor (signature or seal):
Tel:
Year, month and day
Employer (Party A). : _ _ _ _ _ _ _ _ _ _ ____________
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ : _ _ _ _ _ _ _ _ _ _ ____________
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ :
Party B (contractor):
As Party A needs to carry out basic decoration of the office space of the newly-built heating station, it is decided that Party B will be responsible for the completion of the project through negotiation between Party A and Party B. In order to clarify the responsibilities and ensure the safety, quality and progress of the construction, the following clauses are hereby formulated for both parties to abide by.
1. project content:
some areas are decorated.
2. Settlement price and payment method of the project:
According to Budget Quota of Repairing and Installation Project in Taiyuan City in 2__ and Budget Quota of Unified Installation Project in Shanxi Province in 2__ _, no other expenses are charged, only 8% of taxes and management fees are charged, and the on-site visa is settled in real terms, and paid in one lump sum after the project is completed and accepted.
iii. construction period:
from October 1, 2 to October 1, 2. If Party B fails to complete the project on schedule, it will be delayed by one day to deduct the project payment 1 yuan.
iv. contracting method:
party b will contract the work and materials.
v. Project quality:
1. Party B must carry out the construction in accordance with the current national technical standards and specifications for project quality.
2. Where the construction quality is unqualified due to Party B's reasons, Party B shall rework it free of charge within the time specified by Party A to reach the acceptance standard of the project quality. Party B shall be liable for breach of contract if it still fails to meet the requirements after rework.
VI. Project acceptance:
After all the projects are completed, Party A will organize acceptance, and unqualified projects will not be accepted.
VII. Construction safety:
Party B is the first person responsible for safety construction, and it is necessary to carry out civilized construction and safety construction during the construction. All safety accidents during construction shall be borne by Party B..
VIII. Matters not specified in this contract shall be settled through negotiation according to relevant regulations.
this contract is made in quadruplicate, with the same legal effect.
party a's representative: party b's representative:
date of signature: year, month, month
construction project contract 3
employer: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as party a)
construction team: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. And other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A agrees to contract the reinforcement project of Zhanyi station building after the second-line station of Liuzhan of Shanghai-Kunming Railway to Party B for construction. In order to ensure the construction period, quality and safety of this project, and clarify the responsibilities, rights and interests of both parties, the following contract terms are reached through negotiation.
1. General situation of the project:
Project name: building a new Zhanyi station building after adding a second line station in Liuzhan, Shanghai-Kunming Railway
2. Scope of contract:
All reinforcement works required according to the design drawings (including change notice) of this project.
III. Acceptance method:
According to the contract, the current national Code for Construction and Acceptance of Building and Installation Works, Standard for Quality Evaluation of Building and Installation Works and the regulations of relevant departments, the acceptance shall be strictly as required.
iv. unit price and payment method:
1. _ _ _ _ _ _ _ _ _/ton.
2. Pay the project progress payment according to the engineering quantity, and pay the final payment in one lump sum after the project is completed.
V. Obligations of Party A:
1. Provide drawings on time, supply required steel bars, and provide steel bar manufacturing sites.
2. Be responsible for contacting Party B, supervision, design and relevant departments, and coordinating the working relationship on site.
3. Make technical disclosure to Party B before construction to provide reasonable and favorable construction conditions for Party B..
4. party a shall provide binding silk.
VI. Obligations of Party B:
1. Organize skilled workers with corresponding qualification certificates to work.
2. Carefully organize the construction in strict accordance with the design drawings, construction acceptance specifications, relevant technical requirements and construction organization design to ensure that the project quality reaches the agreed standards; Scientifically arrange the operation plan; Guarantee the construction period; Strengthen safety education, conscientiously implement safety technical specifications, strictly abide by the safety system, and implement safety measures to ensure construction safety; Bear the losses caused by quality modification, rework, delay in construction period, safety accidents, messy site and various fines due to their own responsibilities.
3. Strictly implement the current construction and acceptance specifications of the graphic designer, and ensure that the construction tasks are completed in quality, quantity and on schedule.
4. Obey the management and command of Party A's on-site construction personnel, and save materials. It is forbidden to overuse, use superior materials and waste materials.
5. The specification, size and location of steel bars shall be accurate and meet the requirements of design and construction specifications. Quality objectives require excellent grades. If the quality is not up to standard, Party B shall immediately rework it until it is up to standard, and all the labor, materials and other expenses caused by the reverse work shall be borne by Party B..
6. When pouring concrete, Party B must send enough people to watch the reinforcement. It is strictly forbidden to throw steel bars and other materials at high altitude, and the materials should be classified and stacked neatly according to the location designated by the site management personnel. All production sites should be clean and tidy.
7, steel bar blanking, blanking sheet must be reviewed by Party A's engineer or builder's technician before blanking
8, ensure the construction quality of the project undertaken, the construction period and construction progress formulated by Party A, obey the management of Party A's on-site construction management personnel, and abide by the national, local and construction site systems.
VII. Safety requirements
1. Party B must pay attention to safe production and civilized construction, strictly abide by the relevant national safety operation regulations and the relevant safety and civilized construction regulations of the company and the site, and it is strictly forbidden to operate illegally. Party B shall bear all economic and criminal responsibilities for major and minor casualties caused in the construction process, and Party A shall not bear any responsibilities.
2. party b must abide by the laws, regulations and rules of the state, local authorities and the construction site, and all responsibilities caused by offenders shall be borne by party b.
3. Fighting and brawling are strictly prohibited in the construction site, and all the consequences arising therefrom shall be borne by Party B, and the serious cases shall be sent to the local public security organ for handling.
VIII. Other requirements
1. All construction tools and mechanical equipment shall be provided by Party B..
2. Party B shall take care of itself.
3. It is strictly forbidden to stop construction within normal construction days, otherwise Party A has the right to change the construction team, and all expenses incurred during this period shall be borne by Party B..
4. During the construction, Party B must assign a special person to keep an eye on the site and fulfill Party B's obligations, otherwise Party A has the right to change the construction team, and all expenses incurred during the construction shall be borne by Party B..
5. Party B shall not subcontract, otherwise Party A has the right to change the construction team, and all expenses incurred during this period shall be borne by Party B..
6, it is forbidden to waste materials, the rest of the construction of ≥5cm or more steel (welding) must be used in the appropriate parts.
IX. Validity of the Contract
This contract is made in duplicate, one for each party, and it will come into effect after being signed and sealed. After completing the contents of this contract, Party A withdraws the contract and the contract will automatically become invalid.
party a: _ _ _ _ _ _ _ party b: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
according to the contract law of the people's Republic of China, the construction law of the people's Republic of China, the regulations on contract of construction and installation projects, other relevant laws and local administrative regulations, and in combination with the relevant regulations of the company and the specific conditions of this project, Party A and Party B sign this contract through consultation.
article 1 project overview
1. project name: _ _ _ _ _ _
2. project location: _ _ _ _ _ _
3. structure type: _ _ _ _ _ _
4. construction scale:.
Article 3 Scope of Contract
All the construction contents of an outer frame included in the construction drawings, all the materials used for construction (including safety belts, helmets, safety and civilized construction signs, scaffolding pipes, fastener leasing, safety nets, hard protective scaffolding and other equipment related to an outer frame) and the erection of pedestrian safety passages and temporary construction passages on floors.
Article 4 Settlement Method
4.1 The project payment shall be calculated according to the construction area.
4.2 calculation of engineering quantity: according to the construction drawings, the calculation is made according to the reference standard GB/T535325, which is the calculation standard for the construction area of building projects.
4.3 if there is a change due to the construction drawing or design, or the owner's reasons, the amount of labor cost will not be adjusted if it is less than or equal to 1 yuan; ()> 1 yuan and above will be settled according to the facts after deducting 1 yuan. There must be a change notice for each expense, and it can only be adjusted after it is signed by relevant personnel and project manager. Otherwise, it cannot be adjusted.
4.4 in principle, visa timekeeping will not occur in this project.
Article 5 Requirements on Construction Progress and Duration
The specific time is _ _ _ _ months according to Party A's requirements, and the specific node assessment duration is based on the node duration signed by Party A and the construction unit, specifically:
foundation _ _ _ _ months
main body _ _ _ _ months
decoration and finishing works _ _ _ _.